Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$3,450 – $8,650
Per sq ft
$8.55 – $21
before permit
Versus US midpoint
+8%
US $5,600
Rank of 300 metros
#45
1 = most expensive

Local price for stamped concrete in the Oshkosh area: $3,450 to $8,650 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 8% higher than the US figure. Cement masons and concrete finishers earn a median of $35.72 an hour in the Oshkosh area, 30% above the US median of $27.41.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in Oshkosh, WI, standard level

$5,000 to $7,100

About $12 to $17 per sq ft before permits. Labor is about 55% of the bill.

Cost breakdown
PartLowHigh
Materials$2,200$2,850
Labor$2,700$4,000
Permits and fees$130$240
Total$5,000$7,100
Save and get a PDF report

Cost breakdown for 400 sq ft in Oshkosh, WI

Part of the jobLowMidpointHighShare
Materials$1,700$2,550$3,40042%
Labor$1,750$3,350$4,95055%
Permits and fees$45$190$3303%
Total$3,450$6,050$8,650100%

Why Oshkosh prices look the way they do

Labor is 55% of the midpoint bill here, against 48% nationally. The mix of trades behind this job is cement masons and concrete finishers (60%), construction laborers (30%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Oshkosh the blended ratio comes out at 1.24.

Materials are scaled with BEA's regional price parity for goods. Oshkosh is at 93.8 against 100 for the US, so a materials line of $2,700 nationally becomes $2,550 here (midpoint, 400 sq ft). Permits follow the all-items index of 92.9: $45 to $330.

What nearby projects cost in Oshkosh

Jobs that often go together with stamped concrete are priced below at their usual sizes, using the same Oshkosh wage and price inputs. Compared with national midpoints, concrete driveway comes out highest (+15%) and paver patio lowest (+5%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,300 – $4,450+10%
Concrete driveway600 sq ft$4,100 – $10,700+15%
Paver patio300 sq ft$3,150 – $5,750+5%
Concrete slab400 sq ft$2,650 – $5,500+7%
Asphalt driveway600 sq ft$3,150 – $7,900+6%
Gravel driveway1,000 sq ft$2,650 – $10,800+6%

The best months for stamped concrete in Oshkosh

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Oshkosh (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Oshkosh are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Oshkosh gets about 33 inches of precipitation in a normal year, including roughly 39 inches of snow. The wettest months are May, June and July (4.8 inches in June). Inside the workable window, September and October are the driest, at 3.3 and 2.9 inches. The station averages about 8 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Oshkosh (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan26101.3Cold
Feb30131.1Cold
Mar41241.9Cold
Apr54363.2Cold
May67483.9Workable
Jun77594.8Workable
Jul82633.8Workable
Aug80613.4Workable
Sep73533.3Workable
Oct59412.9Workable
Nov44292.0Cold
Dec32181.6Cold

Who does the work: Oshkosh trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Oshkosh the blend is 1.24.

Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $35.72 an hour, 30% above the US median of $27.41. The middle half of them earn between $27.34 and $44.45 an hour. About 110 work in the metro. That is 11.7 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.

For construction laborers (47-2061, weighted 30%) the local median is $24.65 an hour, which is 9% above the national $22.66. The middle half of them earn between $21.00 and $34.81 an hour. BLS counts 560 of them working in the area, 59.7 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $37.03 an hour, 29% above the US median of $28.78. The middle half of them earn between $29.76 and $44.71 an hour. About 150 work in the metro. That is 16.0 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $520 to the midpoint estimate; the 25th percentile takes off about $500. That is a swing of roughly 8.2% to 8.5% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Oshkosh-Neenah has 93,750 jobs in total (BLS, May 2025), ranking 215th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$27.34$35.72$44.45$27.411.30metro
Construction laborers (47-2061)30%$21.00$24.65$34.81$22.661.09metro
Operating engineers and other construction equipment operators (47-2073)10%$29.76$37.03$44.71$28.781.29metro
Blended100%1.24

Add-ons priced for Oshkosh

Add-ons start from national price ranges and are scaled by 1.09 for Oshkosh, which is the average of the area's wage index (1.24) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a vapor barrier$220 – $430

Is Oshkosh cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $5,800 to $6,050 across Oshkosh and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Oshkosh, WIthis page$3,450 – $8,650$6,050
Appleton, WI20 miles$3,450 – $8,650$6,050level
Green Bay, WI45 miles$3,350 – $8,300$5,850−4%
Sheboygan, WI50 miles$3,400 – $8,400$5,900−3%
Wausau, WI80 miles$3,350 – $8,250$5,800−4%
Madison, WI85 miles$3,400 – $8,500$5,950−2%
Wisconsin (statewide)$3,350 – $8,350$5,850−3%
United States$3,250 – $7,950$5,600−8%

Out of the 300 metros we cover, Oshkosh ranks #45 for the cost of this job (#1 is the most expensive). Statewide, Oshkosh is 3% above the Wisconsin figure.

Elsewhere in Wisconsin

Wisconsin metros compared with Oshkosh
MetroSizeRangeMidpointvs. here
Milwaukee, WI820,780 jobs$3,550 – $8,850$6,200+2%
Madison, WI408,070 jobs$3,400 – $8,500$5,950−2%
Green Bay, WI174,550 jobs$3,350 – $8,300$5,850−4%
Appleton, WI124,230 jobs$3,450 – $8,650$6,050level
Eau Claire, WI86,060 jobs$3,350 – $8,250$5,800−4%
La Crosse, WI84,380 jobs$3,300 – $8,250$5,800−5%

Metros of a similar size

Big cities and small ones price differently, so here is Oshkosh against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Iowa City, IA93,760 jobs$3,150 – $7,750$5,450−10%
Bremerton, WA93,740 jobs$3,750 – $9,350$6,550+8%
Billings, MT93,800 jobs$3,300 – $8,100$5,700−6%
Bellingham, WA91,390 jobs$3,800 – $9,500$6,650+10%

Pick a size, pick a tier: stamped concrete pricing in Oshkosh

The cited range is split into basic, standard and premium bands, then scaled to Oshkosh. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).

Basic

$3,450 to $5,550

Basic pattern, one integral color

Standard

$5,000 to $7,100

Two-tone color release and a border

Premium

$6,600 to $8,650

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,750 – $2,850$2,600 – $3,650$3,400 – $4,500
20x20 patio (400 sq ft)$3,450 – $5,550$5,000 – $7,100$6,600 – $8,650
2-car driveway (600 sq ft)$5,200 – $8,250$7,450 – $10,500$9,750 – $12,800

Why two Oshkosh quotes can differ

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

  • Pattern and color

    Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,000 to $7,100 for Oshkosh, WI is attached.

Detailed stamped concrete report for Oshkosh, WI, $9

The report lays out the stamped concrete numbers for Oshkosh, WI line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in Oshkosh: your questions

+How much does it cost to pour stamped concrete in Oshkosh?

For 400 sq ft, expect $3,450 to $8,650 in the Oshkosh area. A standard-spec job lands at $5,000 to $7,100. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for stamped concrete in Oshkosh?

About $8.55 to $21 per sq ft for materials and labor, plus $45 to $330 for the permit if one is needed. The US range is $8 to $19.

+Is stamped concrete cheaper in Oshkosh or Appleton?

Appleton is 20 miles away. The midpoint for 400 sq ft there is $6,050, which is 0% more than Oshkosh ($6,050). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Oshkosh?

About 55% at the midpoint, or $3,350 out of $6,050. Materials are 42% and permits 3%. Nationally, labor is 48%.

+What would 20x20 patio (400 sq ft) cost in Oshkosh?

$3,450 to $8,650. Pick a different size in the estimator above to get your own number.

+Does stamped concrete need a permit in Oshkosh?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $330 for fees in the Oshkosh area (our national range of $50 to $350 scaled by the local price level).

+Is Oshkosh expensive for stamped concrete compared with the rest of Wisconsin?

Oshkosh is 3% above the Wisconsin statewide estimate ($5,850 at the midpoint). We cover 12 metros in Wisconsin; see the state page to compare them.

+What do cement masons and concrete finishers earn in Oshkosh?

The BLS median is $35.72 an hour in the Oshkosh area, compared with $27.41 nationally. The 25th to 75th percentile range is $27.34 to $44.45.

+What do basic and premium stamped concrete work cost in Oshkosh?

For 400 sq ft, basic work runs $3,450 to $5,550 and premium work $6,600 to $8,650. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+When is the best time to pour stamped concrete in Oshkosh?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a vapor barrier" add in Oshkosh?

$220 to $430 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Stamped concrete near Oshkosh

Stamped concrete: all pricesStamped concrete in WisconsinAll projects in OshkoshWisconsin cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.