Concrete slab cost in Oshkosh, WI
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $2,650 – $5,500
- Per sq ft
- $6.55 – $13
- before permit
- Versus US midpoint
- +7%
- US $3,850
- Rank of 300 metros
- #50
- 1 = most expensive
A concrete slab in Oshkosh, WI usually costs $2,650 to $5,500 for 400 sq ft. That works out to about $6.55 to $13 per sq ft before permits. Compared with the national midpoint that is $250 more. Cement masons and concrete finishers earn a median of $35.72 an hour in the Oshkosh area, 30% above the US median of $27.41.
Estimate your concrete slab cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Oshkosh, WI, standard level
$3,500 to $4,650
About $8.40 to $11 per sq ft before permits. Labor is about 49% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,600 | $2,200 |
| Labor | $1,800 | $2,200 |
| Permits and fees | $140 | $270 |
| Total | $3,500 | $4,650 |
Cost breakdown for 400 sq ft in Oshkosh, WI
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,150 | $1,900 | $2,650 | 46% |
| Labor | $1,500 | $2,000 | $2,500 | 49% |
| Permits and fees | $45 | $210 | $370 | 5% |
| Total | $2,650 | $4,100 | $5,500 | 100% |
What is behind the Oshkosh number
We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Oshkosh wages are 1.25 times the national level. Labor makes up about 49% of the midpoint estimate (42% at national prices).
Materials are scaled with BEA's regional price parity for goods. Oshkosh is at 93.8 against 100 for the US, so a materials line of $2,000 nationally becomes $1,900 here (midpoint, 400 sq ft). Permits follow the all-items index of 92.9: $45 to $370.
Why two Oshkosh quotes can differ
Truck and pump access
If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.
Small-job minimums
Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.
Finish
A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.
Oshkosh weather and the concrete slab calendar
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Oshkosh (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.
For pouring concrete, the comfortable months in Oshkosh are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Oshkosh gets about 33 inches of precipitation in a normal year, including roughly 39 inches of snow. The wettest months are May, June and July (4.8 inches in June). Inside the workable window, September and October are the driest, at 3.3 and 2.9 inches. The station averages about 8 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 26 | 10 | 1.3 | Cold |
| Feb | 30 | 13 | 1.1 | Cold |
| Mar | 41 | 24 | 1.9 | Cold |
| Apr | 54 | 36 | 3.2 | Cold |
| May | 67 | 48 | 3.9 | Workable |
| Jun | 77 | 59 | 4.8 | Workable |
| Jul | 82 | 63 | 3.8 | Workable |
| Aug | 80 | 61 | 3.4 | Workable |
| Sep | 73 | 53 | 3.3 | Workable |
| Oct | 59 | 41 | 2.9 | Workable |
| Nov | 44 | 29 | 2.0 | Cold |
| Dec | 32 | 18 | 1.6 | Cold |
Optional extras in Oshkosh
Add-ons start from national price ranges and are scaled by 1.09 for Oshkosh, which is the average of the area's wage index (1.25) and goods price index (0.94). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $440 – $1,300 |
| Remove old concrete first | $870 – $2,600 |
Related projects, priced for Oshkosh
Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Oshkosh wage and price inputs. Compared with national midpoints, concrete driveway comes out highest (+15%) and asphalt driveway lowest (+6%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $4,100 – $10,700 | +15% |
| Concrete patio | 300 sq ft | $1,300 – $4,450 | +10% |
| Detached garage | 576 sq ft | $31,900 – $64,000 | +10% |
| Stamped concrete | 400 sq ft | $3,450 – $8,650 | +8% |
| Asphalt driveway | 600 sq ft | $3,150 – $7,900 | +6% |
| Gravel driveway | 1,000 sq ft | $2,650 – $10,800 | +6% |
Pick a size, pick a tier: concrete slab pricing in Oshkosh
The cited range is split into basic, standard and premium bands, then scaled to Oshkosh. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).
Basic
$2,650 to $3,800
4-inch broom-finish slab, light mesh, easy truck access
Standard
$3,500 to $4,650
4-5 inch slab with rebar or heavier mesh and standard base prep
Premium
$4,350 to $5,500
6-inch slab, heavy reinforcement, thick base, pump truck or tight access
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 pad (100 sq ft) | $700 – $1,100 | $990 – $1,350 | $1,250 – $1,650 |
| 12x12 (144 sq ft) | $990 – $1,500 | $1,350 – $1,850 | $1,700 – $2,200 |
| 20x20 (400 sq ft) | $2,650 – $3,800 | $3,500 – $4,650 | $4,350 – $5,500 |
| 24x24 garage floor (576 sq ft) | $3,800 – $5,400 | $5,000 – $6,550 | $6,150 – $7,750 |
| 30x40 foundation (1,200 sq ft) | $7,900 – $11,000 | $10,300 – $13,400 | $12,600 – $15,700 |
What local crews earn in Oshkosh
The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Oshkosh the blend is 1.25.
Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $35.72 an hour, 30% above the US median of $27.41. The middle half of them earn between $27.34 and $44.45 an hour. About 110 work in the metro. That is 11.7 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.
For construction laborers (47-2061, weighted 30%) the local median is $24.65 an hour, which is 9% above the national $22.66. The middle half of them earn between $21.00 and $34.81 an hour. BLS counts 560 of them working in the area, 59.7 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $37.03 an hour, 29% above the US median of $28.78. The middle half of them earn between $29.76 and $44.71 an hour. About 150 work in the metro. That is 16.0 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.
Carpenters (47-2031), 10% of the weighting: a median of $40.59 an hour, 39% above the US median of $29.12. The middle half of them earn between $29.01 and $41.48 an hour. About 650 work in the metro. That is 69.3 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.
A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $250 to the midpoint estimate; the 25th percentile takes off about $240. That is a swing of roughly 6.0% to 6.2% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Oshkosh-Neenah has 93,750 jobs in total (BLS, May 2025), ranking 215th by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $27.34 | $35.72 | $44.45 | $27.41 | 1.30 | metro |
| Construction laborers (47-2061) | 30% | $21.00 | $24.65 | $34.81 | $22.66 | 1.09 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $29.76 | $37.03 | $44.71 | $28.78 | 1.29 | metro |
| Carpenters (47-2031) | 10% | $29.01 | $40.59 | $41.48 | $29.12 | 1.39 | metro |
| Blended | 100% | 1.25 | |||||
Oshkosh against nearby metros and the rest of Wisconsin
Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $3,850 to $4,100 across Oshkosh and its five closest metros.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Oshkosh, WIthis page | $2,650 – $5,500 | $4,100 | |
| Appleton, WI20 miles | $2,650 – $5,450 | $4,050 | −1% |
| Green Bay, WI45 miles | $2,550 – $5,300 | $3,900 | −4% |
| Sheboygan, WI50 miles | $2,550 – $5,300 | $3,950 | −3% |
| Wausau, WI80 miles | $2,500 – $5,200 | $3,850 | −5% |
| Madison, WI85 miles | $2,600 – $5,400 | $4,000 | −2% |
| Wisconsin (statewide) | $2,550 – $5,300 | $3,950 | −4% |
| United States | $2,450 – $5,200 | $3,850 | −6% |
Out of the 300 metros we cover, Oshkosh ranks #50 for the cost of this job (#1 is the most expensive). Statewide, Oshkosh is 4% above the Wisconsin figure.
Elsewhere in Wisconsin
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Milwaukee, WI | 820,780 jobs | $2,700 – $5,550 | $4,100 | +1% |
| Madison, WI | 408,070 jobs | $2,600 – $5,400 | $4,000 | −2% |
| Green Bay, WI | 174,550 jobs | $2,550 – $5,300 | $3,900 | −4% |
| Appleton, WI | 124,230 jobs | $2,650 – $5,450 | $4,050 | −1% |
| Eau Claire, WI | 86,060 jobs | $2,550 – $5,250 | $3,900 | −5% |
| La Crosse, WI | 84,380 jobs | $2,500 – $5,250 | $3,900 | −5% |
Metros of a similar size
Big cities and small ones price differently, so here is Oshkosh against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Iowa City, IA | 93,760 jobs | $2,350 – $5,000 | $3,700 | −10% |
| Bremerton, WA | 93,740 jobs | $2,850 – $5,900 | $4,350 | +7% |
| Billings, MT | 93,800 jobs | $2,500 – $5,200 | $3,850 | −6% |
| Bellingham, WA | 91,390 jobs | $2,900 – $6,000 | $4,450 | +9% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,500 to $4,650 for Oshkosh, WI is attached.
Detailed concrete slab report for Oshkosh, WI, $9
The report lays out the concrete slab numbers for Oshkosh, WI line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete slab in Oshkosh: your questions
+How much does it cost to pour a concrete slab in Oshkosh?
For 400 sq ft, expect $2,650 to $5,500 in the Oshkosh area. A standard-spec job lands at $3,500 to $4,650. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete slab in Oshkosh?
About $6.55 to $13 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $6 to $12.
+Is concrete slab cheaper in Oshkosh or Appleton?
Appleton is 20 miles away. The midpoint for 400 sq ft there is $4,050, which is 1% less than Oshkosh ($4,100). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Oshkosh?
About 49% at the midpoint, or $2,000 out of $4,100. Materials are 46% and permits 5%. Nationally, labor is 42%.
+What would 20x20 (400 sq ft) cost in Oshkosh?
$2,650 to $5,500. Pick a different size in the estimator above to get your own number.
+Does concrete slab need a permit in Oshkosh?
Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the Oshkosh area (our national range of $50 to $400 scaled by the local price level).
+Is Oshkosh expensive for concrete slab compared with the rest of Wisconsin?
Oshkosh is 4% above the Wisconsin statewide estimate ($3,950 at the midpoint). We cover 12 metros in Wisconsin; see the state page to compare them.
+What do cement masons and concrete finishers earn in Oshkosh?
The BLS median is $35.72 an hour in the Oshkosh area, compared with $27.41 nationally. The 25th to 75th percentile range is $27.34 to $44.45.
+What do basic and premium concrete slab work cost in Oshkosh?
For 400 sq ft, basic work runs $2,650 to $3,800 and premium work $4,350 to $5,500. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.
+When is the best time to pour a concrete slab in Oshkosh?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Oshkosh?
$440 to $1,300 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete slab near Oshkosh
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Slab Cost? (2026) (accessed November 4, 2026)
- Estimators.us: Concrete Slab Cost in 2026 | $6-$12/Sq Ft Guide (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020