Concrete slab cost in Sheboygan, WI
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $2,550 – $5,300
- Per sq ft
- $6.30 – $12.50
- before permit
- Versus US midpoint
- +3%
- US $3,850
- Rank of 300 metros
- #79
- 1 = most expensive
Sheboygan homeowners pay roughly $2,550 to $5,300 to pour a concrete slab at 400 sq ft, or $6.30 to $12.50 per sq ft (permit not included). Against the US midpoint, Sheboygan is 3% higher. Cement masons and concrete finishers earn a median of $32.37 an hour in the Sheboygan area, 18% above the US median of $27.41.
Estimate your concrete slab cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Sheboygan, WI, standard level
$3,400 to $4,500
About $8.10 to $10.50 per sq ft before permits. Labor is about 47% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,600 | $2,200 |
| Labor | $1,650 | $2,050 |
| Permits and fees | $150 | $280 |
| Total | $3,400 | $4,500 |
Cost breakdown for 400 sq ft in Sheboygan, WI
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,150 | $1,900 | $2,650 | 48% |
| Labor | $1,400 | $1,850 | $2,300 | 47% |
| Permits and fees | $45 | $210 | $380 | 5% |
| Total | $2,550 | $3,950 | $5,300 | 100% |
Where the Sheboygan price comes from
The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $32.37 an hour. Add the other trades involved and the blended wage index for Sheboygan is 1.16 (US = 1.00), which puts labor at 47% of the total.
On the materials line, the BEA goods price index for the Sheboygan metro is 93.8 (US = 100). The midpoint materials bill for 400 sq ft comes to $1,900, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (94.0) and land at $45 to $380.
Concrete slab: what moves the price in Sheboygan
Finish
A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.
Thickness and mix
A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).
Base and reinforcement
A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Sheboygan is 1.16 times the national level.
For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $32.37 an hour, which is 18% above the national $27.41. The middle half of them earn between $28.76 and $33.85 an hour. BLS counts 140 of them working in the area, 23.1 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.
Construction laborers (47-2061), 30% of the weighting: a median of $27.14 an hour, 20% above the US median of $22.66. The middle half of them earn between $21.69 and $31.93 an hour. About 310 work in the metro. That is 51.1 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $30.91 an hour, which is 7% above the national $28.78. The middle half of them earn between $30.16 and $41.78 an hour. BLS counts 100 of them working in the area, 16.5 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.
For carpenters (47-2031, weighted 10%) the local median is $30.17 an hour, which is 4% above the national $29.12. The middle half of them earn between $24.39 and $40.68 an hour. BLS counts 230 of them working in the area, 37.9 for every 10,000 jobs (US: 43.1), so the local bench is about average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($33.85 an hour) instead of the median, the labor line grows by about $45. At the 25th percentile ($28.76) it shrinks by about $110. The total moves by 1.1% or 2.7%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 60,630 jobs in the Sheboygan area. That makes it the 285th largest of the 300 metros we cover, with 0.04% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $28.76 | $32.37 | $33.85 | $27.41 | 1.18 | metro |
| Construction laborers (47-2061) | 30% | $21.69 | $27.14 | $31.93 | $22.66 | 1.20 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $30.16 | $30.91 | $41.78 | $28.78 | 1.07 | metro |
| Carpenters (47-2031) | 10% | $24.39 | $30.17 | $40.68 | $29.12 | 1.04 | metro |
| Blended | 100% | 1.16 | |||||
When to schedule concrete slab in Sheboygan
We use NOAA's 1991-2020 climate normals for Sheboygan (in the city). These are 30-year monthly averages, not forecasts.
May through October is the stretch where pouring concrete runs into the fewest weather problems in Sheboygan (6 of 12 months). January, February, March, April, November and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Sheboygan gets about 35 inches of precipitation in a normal year. The wettest months are May, June and August (4.0 inches in August). Inside the workable window, July and September are the driest, at 3.2 and 2.7 inches. The station averages about 9 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 30 | 15 | 2.1 | Cold |
| Feb | 33 | 17 | 1.7 | Cold |
| Mar | 42 | 26 | 2.1 | Cold |
| Apr | 52 | 36 | 3.5 | Cold |
| May | 63 | 46 | 3.7 | Workable |
| Jun | 74 | 56 | 4.0 | Workable |
| Jul | 82 | 63 | 3.2 | Workable |
| Aug | 80 | 62 | 4.0 | Workable |
| Sep | 72 | 55 | 2.7 | Workable |
| Oct | 59 | 42 | 3.2 | Workable |
| Nov | 47 | 31 | 2.4 | Cold |
| Dec | 36 | 22 | 2.1 | Cold |
What nearby projects cost in Sheboygan
Because every project leans on different trades, Sheboygan's wage level does not move all prices equally. Against the US midpoint, concrete driveway runs +9% and detached garage +2%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $3,900 – $10,100 | +9% |
| Concrete patio | 300 sq ft | $1,250 – $4,250 | +5% |
| Detached garage | 576 sq ft | $29,700 – $59,500 | +2% |
| Stamped concrete | 400 sq ft | $3,400 – $8,400 | +5% |
| Asphalt driveway | 600 sq ft | $3,150 – $7,800 | +4% |
| Gravel driveway | 1,000 sq ft | $2,600 – $10,600 | +4% |
Sheboygan against nearby metros and the rest of Wisconsin
Of the five closest metros, 2 are cheaper than Sheboygan. Green Bay is the lowest at about $3,900 (midpoint, 400 sq ft), 50 miles away.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Sheboygan, WIthis page | $2,550 – $5,300 | $3,950 | |
| Appleton, WI50 miles | $2,650 – $5,450 | $4,050 | +2% |
| Oshkosh, WI50 miles | $2,650 – $5,500 | $4,100 | +3% |
| Green Bay, WI50 miles | $2,550 – $5,300 | $3,900 | −1% |
| Milwaukee, WI55 miles | $2,700 – $5,550 | $4,100 | +4% |
| Racine, WI65 miles | $2,550 – $5,300 | $3,950 | level |
| Wisconsin (statewide) | $2,550 – $5,300 | $3,950 | level |
| United States | $2,450 – $5,200 | $3,850 | −3% |
Across 300 US metros, Sheboygan comes in at #79 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Sheboygan is 0% above the Wisconsin figure.
Other Wisconsin metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Milwaukee, WI | 820,780 jobs | $2,700 – $5,550 | $4,100 | +4% |
| Madison, WI | 408,070 jobs | $2,600 – $5,400 | $4,000 | +1% |
| Green Bay, WI | 174,550 jobs | $2,550 – $5,300 | $3,900 | −1% |
| Appleton, WI | 124,230 jobs | $2,650 – $5,450 | $4,050 | +2% |
| Oshkosh, WI | 93,750 jobs | $2,650 – $5,500 | $4,100 | +3% |
| Eau Claire, WI | 86,060 jobs | $2,550 – $5,250 | $3,900 | −1% |
Cities with a workforce like Sheboygan's
Big cities and small ones price differently, so here is Sheboygan against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Dothan, AL | 60,720 jobs | $2,100 – $4,500 | $3,300 | −16% |
| Jonesboro, AR | 60,620 jobs | $2,050 – $4,450 | $3,250 | −18% |
| Decatur, AL | 61,240 jobs | $2,150 – $4,650 | $3,400 | −13% |
| Chambersburg, PA | 60,280 jobs | $2,350 – $5,050 | $3,700 | −6% |
Optional extras in Sheboygan
Extras are quoted nationally and then scaled to Sheboygan by the average of the local wage index (1.16) and goods index (0.94), a factor of 1.05. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $420 – $1,250 |
| Remove old concrete first | $840 – $2,500 |
Pick a size, pick a tier: concrete slab pricing in Sheboygan
Three bands are cut from the same cited range and localized for Sheboygan wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.
Basic
$2,550 to $3,650
4-inch broom-finish slab, light mesh, easy truck access
Standard
$3,400 to $4,500
4-5 inch slab with rebar or heavier mesh and standard base prep
Premium
$4,200 to $5,300
6-inch slab, heavy reinforcement, thick base, pump truck or tight access
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 pad (100 sq ft) | $680 – $1,050 | $960 – $1,350 | $1,250 – $1,600 |
| 12x12 (144 sq ft) | $950 – $1,450 | $1,300 – $1,800 | $1,700 – $2,150 |
| 20x20 (400 sq ft) | $2,550 – $3,650 | $3,400 – $4,500 | $4,200 – $5,300 |
| 24x24 garage floor (576 sq ft) | $3,650 – $5,200 | $4,800 – $6,350 | $5,950 – $7,500 |
| 30x40 foundation (1,200 sq ft) | $7,600 – $10,600 | $9,900 – $12,900 | $12,200 – $15,200 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,400 to $4,500 for Sheboygan, WI is attached.
Detailed concrete slab report for Sheboygan, WI, $9
The report lays out the concrete slab numbers for Sheboygan, WI line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete slab in Sheboygan: your questions
+How much does it cost to pour a concrete slab in Sheboygan?
For 400 sq ft, expect $2,550 to $5,300 in the Sheboygan area. A standard-spec job lands at $3,400 to $4,500. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete slab in Sheboygan?
About $6.30 to $12.50 per sq ft for materials and labor, plus $45 to $380 for the permit if one is needed. The US range is $6 to $12.
+Is concrete slab cheaper in Sheboygan or Appleton?
Appleton is 50 miles away. The midpoint for 400 sq ft there is $4,050, which is 2% more than Sheboygan ($3,950). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Sheboygan?
About 47% at the midpoint, or $1,850 out of $3,950. Materials are 48% and permits 5%. Nationally, labor is 42%.
+What would 20x20 (400 sq ft) cost in Sheboygan?
$2,550 to $5,300. Pick a different size in the estimator above to get your own number.
+Does concrete slab need a permit in Sheboygan?
Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $380 for fees in the Sheboygan area (our national range of $50 to $400 scaled by the local price level).
+Is Sheboygan expensive for concrete slab compared with the rest of Wisconsin?
Sheboygan is 0% above the Wisconsin statewide estimate ($3,950 at the midpoint). We cover 12 metros in Wisconsin; see the state page to compare them.
+What do cement masons and concrete finishers earn in Sheboygan?
The BLS median is $32.37 an hour in the Sheboygan area, compared with $27.41 nationally. The 25th to 75th percentile range is $28.76 to $33.85.
+What do basic and premium concrete slab work cost in Sheboygan?
For 400 sq ft, basic work runs $2,550 to $3,650 and premium work $4,200 to $5,300. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.
+When is the best time to pour a concrete slab in Sheboygan?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. July and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Sheboygan?
$420 to $1,250 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete slab near Sheboygan
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Slab Cost? (2026) (accessed November 4, 2026)
- Estimators.us: Concrete Slab Cost in 2026 | $6-$12/Sq Ft Guide (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020