Home project costs in Sheboygan, WI
Every project we cover, priced for the Sheboygan metro with local BLS wages and BEA price levels.
Sheboygan sits 161st of 300 metros on BEA's regional price index, at 94.0 where the US is 100. Goods, the index that drives materials, is 93.8 (239th). The metro has about 60,630 jobs in BLS's May 2025 survey.
Not every job moves the same way here: 26 of the 38 projects price above the national midpoint and 9 below, and 3 are level with it. Shower pan (+13%), French drain (+11%) and sprinkler system (+11%) sit highest, and laminate flooring (−4%), hardwood flooring (−3%) and front door (−3%) sit lowest. Labor-heavy work tracks local wages; materials-heavy work tracks the goods index.
Weather: the nearest NOAA station (Sheboygan, 1 miles away) shows a January average low of 15°F, a July average high of 82°F and 35 inches of precipitation a year (1991-2020 normals). For concrete pours, the workable months are May through October; for exterior installation, they are April through November.
What local trades earn in Sheboygan
| Trade | Projects using it | 25th pct | Median | 75th pct | US median | Ratio |
|---|---|---|---|---|---|---|
| Construction laborers (47-2061) | 25 | $21.69 | $27.14 | $31.93 | $22.66 | 1.20 |
| Carpenters (47-2031) | 23 | $24.39 | $30.17 | $40.68 | $29.12 | 1.04 |
| Operating engineers and other construction equipment operators (47-2073) | 10 | $30.16 | $30.91 | $41.78 | $28.78 | 1.07 |
| Plumbers, pipefitters and steamfitters (47-2152) | 7 | $29.77 | $44.01 | $50.42 | $30.67 | 1.43 |
| Cement masons and concrete finishers (47-2051) | 6 | $28.76 | $32.37 | $33.85 | $27.41 | 1.18 |
| Electricians (47-2111) | 6 | $28.40 | $37.92 | $45.18 | $30.38 | 1.25 |
| Tile and stone setters (47-2044) | 5 | n/a | n/a | n/a | $26.77 | n/a |
| Roofers (47-2181) | 5 | $22.97 | $28.00 | $30.53 | $26.65 | 1.05 |
Concrete & paving in Sheboygan
The 7 jobs here average +6% versus the US in Sheboygan, from +3% (concrete slab) to +9% (paver patio).
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| Concrete slab cost in Sheboygan | 400 sq ft | $2,550 – $5,300 | +3% |
| Concrete driveway cost in Sheboygan | 600 sq ft | $3,900 – $10,100 | +9% |
| Asphalt driveway cost in Sheboygan | 600 sq ft | $3,150 – $7,800 | +4% |
| Gravel driveway cost in Sheboygan | 1,000 sq ft | $2,600 – $10,600 | +4% |
| Paver patio cost in Sheboygan | 300 sq ft | $3,300 – $5,950 | +9% |
| Concrete patio cost in Sheboygan | 300 sq ft | $1,250 – $4,250 | +5% |
| Stamped concrete cost in Sheboygan | 400 sq ft | $3,400 – $8,400 | +5% |
Decks & outdoor in Sheboygan
The 2 jobs here average +1% versus the US in Sheboygan, from −1% (wood deck) to +2% (composite deck).
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| Wood deck cost in Sheboygan | 300 sq ft | $7,500 – $15,100 | −1% |
| Composite deck cost in Sheboygan | 300 sq ft | $12,200 – $24,500 | +2% |
Building & additions in Sheboygan
Across these 2 projects, Sheboygan averages +4% against national midpoints. Home addition is highest at +5% and detached garage lowest at +2%.
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| Detached garage cost in Sheboygan | 576 sq ft | $29,700 – $59,500 | +2% |
| Home addition cost in Sheboygan | 300 sq ft | $40,100 – $81,100 | +5% |
Doors & windows in Sheboygan
The 5 jobs here average −1% versus the US in Sheboygan, from −3% (front door) to level (patio door).
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| Garage door cost in Sheboygan | 1 door | $710 – $3,650 | −1% |
| Storm door cost in Sheboygan | 1 door | $350 – $940 | level |
| Front door cost in Sheboygan | 1 door | $510 – $2,400 | −3% |
| Window replacement cost in Sheboygan | 10 windows | $4,450 – $14,600 | −2% |
| Patio door cost in Sheboygan | 1 door | $590 – $6,050 | level |
Fencing in Sheboygan
The 4 jobs here average +1% versus the US in Sheboygan, from −2% (vinyl fence) to +6% (chain-link fence).
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| Wood fence cost in Sheboygan | 150 linear ft | $3,100 – $7,650 | +1% |
| Vinyl fence cost in Sheboygan | 150 linear ft | $4,400 – $9,000 | −2% |
| Chain-link fence cost in Sheboygan | 150 linear ft | $1,550 – $6,550 | +6% |
| Aluminum fence cost in Sheboygan | 150 linear ft | $3,900 – $11,500 | +2% |
Roofing & exterior in Sheboygan
The 5 jobs here average +2% versus the US in Sheboygan, from −2% (attic insulation) to +4% (metal roof).
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| Roof replacement cost in Sheboygan | 2,000 sq ft of roof | $6,300 – $12,700 | +2% |
| Metal roof cost in Sheboygan | 2,000 sq ft of roof | $11,000 – $33,500 | +4% |
| Gutters cost in Sheboygan | 160 linear ft | $1,400 – $4,350 | +4% |
| Vinyl siding cost in Sheboygan | 2,100 sq ft of wall | $8,600 – $25,900 | +3% |
| Attic insulation cost in Sheboygan | 1,000 sq ft | $990 – $3,900 | −2% |
Kitchen & bath in Sheboygan
Across these 5 projects, Sheboygan averages +4% against national midpoints. Shower pan is highest at +13% and kitchen remodel lowest at −2%.
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| Kitchen cabinets cost in Sheboygan | 25 linear ft | $4,200 – $14,300 | +1% |
| Shower pan cost in Sheboygan | 1 pan | $1,150 – $3,100 | +13% |
| Kitchen remodel cost in Sheboygan | 120 sq ft | $18,100 – $30,800 | −2% |
| Bathroom remodel cost in Sheboygan | 45 sq ft | $5,000 – $24,800 | +6% |
| Kitchen backsplash cost in Sheboygan | 30 sq ft | $310 – $1,500 | +1% |
Landscaping & drainage in Sheboygan
Across these 5 projects, Sheboygan averages +7% against national midpoints. French drain is highest at +11% and sod installation lowest at level.
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| French drain cost in Sheboygan | 60 linear ft | $670 – $2,350 | +11% |
| Retaining wall cost in Sheboygan | 200 sq ft of wall face | $7,800 – $14,100 | +7% |
| Sod installation cost in Sheboygan | 1,500 sq ft | $1,500 – $3,300 | level |
| Sprinkler system cost in Sheboygan | 4,000 sq ft of lawn | $4,450 – $11,100 | +11% |
| Inground pool cost in Sheboygan | 450 sq ft | $38,900 – $121,500 | +8% |
Flooring & interior in Sheboygan
The 3 jobs here average −2% versus the US in Sheboygan, from −4% (laminate flooring) to +2% (tile flooring).
| Project | Size | Sheboygan range | vs. US |
|---|---|---|---|
| Hardwood flooring cost in Sheboygan | 500 sq ft | $5,350 – $12,100 | −3% |
| Laminate flooring cost in Sheboygan | 500 sq ft | $1,950 – $6,700 | −4% |
| Tile flooring cost in Sheboygan | 200 sq ft | $2,650 – $10,000 | +2% |
Sheboygan against its nearest metros
Taking every project together, Sheboygan comes out +3% versus the national midpoint. Of the 6 closest metros, 3 price higher and 3 lower. Muskegon is the lowest at −6% (70 miles) and Oshkosh the highest at +7% (50 miles). These are unweighted averages of the midpoints, a rough guide to overall price level rather than a number for any one job.
| Metro | Distance | Price index | Goods index | All projects vs. US |
|---|---|---|---|---|
| Sheboygan, WIthis page | 94.0 | 93.8 | +3% | |
| Appleton, WI | 50 miles | 92.4 | 93.8 | +5% |
| Oshkosh, WI | 50 miles | 92.9 | 93.8 | +7% |
| Green Bay, WI | 50 miles | 93.1 | 93.8 | +2% |
| Milwaukee, WI | 55 miles | 96.9 | 93.8 | +5% |
| Racine, WI | 65 miles | 96.0 | 93.8 | +2% |
| Muskegon, MI | 70 miles | 92.5 | 93.7 | −6% |