Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$12,200 – $24,500
Per sq ft
$40.50 – $81.50
before permit
Versus US midpoint
+2%
US $18,100
Rank of 300 metros
#88
1 = most expensive

Local price for a composite deck in the Sheboygan area: $12,200 to $24,500 for 300 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint lands close to the US figure. Carpenters earn a median of $30.17 an hour in the Sheboygan area, 4% above the US median of $29.12.

Estimate your composite deck cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Mid-grade capped boards with railing and stairs

Add-ons

Estimated cost for 300 sq ft in Sheboygan, WI, standard level

$15,900 to $20,800

About $53 to $69 per sq ft before permits. Labor is about 63% of the bill.

Cost breakdown
PartLowHigh
Materials$5,850$7,650
Labor$10,000$13,100
Permits and fees$75$110
Total$15,900$20,800
Save and get a PDF report

Cost breakdown for 300 sq ft in Sheboygan, WI

Part of the jobLowMidpointHighShare
Materials$4,500$6,750$9,00037%
Labor$7,700$11,500$15,40063%
Permits and fees$45$95$1401%
Total$12,200$18,400$24,500100%

What is behind the Sheboygan number

The wage side of the estimate leans on carpenters, who do 80% of the hours on a typical job. Their local median is $30.17 an hour. Add the other trades involved and the blended wage index for Sheboygan is 1.07 (US = 1.00), which puts labor at 63% of the total.

Materials are scaled with BEA's regional price parity for goods. Sheboygan is at 93.8 against 100 for the US, so a materials line of $7,200 nationally becomes $6,750 here (midpoint, 300 sq ft). Permits follow the all-items index of 94.0: $45 to $140.

Sheboygan: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Sheboygan. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x12 (120 sq ft) to 20x20 (400 sq ft).

Basic

$12,200 to $17,200

Entry-level composite boards, low deck, simple shape

Standard

$15,900 to $20,800

Mid-grade capped boards with railing and stairs

Premium

$19,600 to $24,500

Premium capped or PVC boards, multi-level, hidden fasteners

Cost by size and quality level
SizeBasicStandardPremium
10x12 (120 sq ft)$4,900 – $6,900$6,400 – $8,400$7,900 – $9,900
12x12 (144 sq ft)$5,900 – $8,300$7,700 – $10,100$9,450 – $11,800
16x20 (320 sq ft)$13,100 – $18,300$17,000 – $22,200$20,900 – $26,200
20x20 (400 sq ft)$16,300 – $22,800$21,200 – $27,800$26,100 – $32,700

Specs and site conditions that change a Sheboygan bid

  • Engineering

    Large or complex decks may need a structural engineer at $100-$220 an hour to get a permit.

  • Board grade

    Composite materials run $16-$32 per sq ft and the installed price is $40-$80 per sq ft, including the substructure (HomeGuide).

  • Labor

    Labor for composite is $24-$48 per sq ft, higher than wood because the boards need extra parts and more careful assembly.

The best months for composite deck in Sheboygan

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Sheboygan (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.

For exterior installation, the comfortable months in Sheboygan are April through November: 8 of 12. Outside them, January, February, March and December have an average daytime high under 45°F.

In January, February, March and December the average high stays below 45°F. Sealants, adhesives and some materials, such as vinyl, are harder to install well in the cold, and short daylight cuts the working day.

Sheboygan gets about 35 inches of precipitation in a normal year. The wettest months are May, June and August (4.0 inches in August). Inside the workable window, September and November are the driest, at 2.7 and 2.4 inches. The station averages about 9 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Sheboygan (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan30152.1Cold
Feb33171.7Cold
Mar42262.1Cold
Apr52363.5Workable
May63463.7Workable
Jun74564.0Workable
Jul82633.2Workable
Aug80624.0Workable
Sep72552.7Workable
Oct59423.2Workable
Nov47312.4Workable
Dec36222.1Cold

Who does the work: Sheboygan trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 2 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Sheboygan the blend is 1.07.

Carpenters (47-2031), 80% of the weighting: a median of $30.17 an hour, 4% above the US median of $29.12. The middle half of them earn between $24.39 and $40.68 an hour. About 230 work in the metro. That is 37.9 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.

For construction laborers (47-2061, weighted 20%) the local median is $27.14 an hour, which is 20% above the national $22.66. The middle half of them earn between $21.69 and $31.93 an hour. BLS counts 310 of them working in the area, 51.1 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

A quick sensitivity check: moving the lead trade (carpenters) from the median to the 75th percentile wage adds about $3,100 to the midpoint estimate; the 25th percentile takes off about $1,700. That is a swing of roughly 9.3% to 17.0% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Sheboygan has 60,630 jobs in total (BLS, May 2025), ranking 285th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Carpenters (47-2031)80%$24.39$30.17$40.68$29.121.04metro
Construction laborers (47-2061)20%$21.69$27.14$31.93$22.661.20metro
Blended100%1.07

Is Sheboygan cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 300 sq ft range from $18,000 to $21,200 across Sheboygan and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Sheboygan, WIthis page$12,200 – $24,500$18,400
Appleton, WI50 miles$12,300 – $24,600$18,500level
Oshkosh, WI50 miles$14,100 – $28,300$21,200+16%
Green Bay, WI50 miles$12,000 – $24,000$18,000−2%
Milwaukee, WI55 miles$12,400 – $24,800$18,600+1%
Racine, WI65 miles$12,000 – $24,100$18,000−2%
Wisconsin (statewide)$12,200 – $24,400$18,300−1%
United States$12,100 – $24,200$18,100−2%

Out of the 300 metros we cover, Sheboygan ranks #88 for the cost of this job (#1 is the most expensive). Statewide, Sheboygan is 1% above the Wisconsin figure.

Elsewhere in Wisconsin

Wisconsin metros compared with Sheboygan
MetroSizeRangeMidpointvs. here
Milwaukee, WI820,780 jobs$12,400 – $24,800$18,600+1%
Madison, WI408,070 jobs$12,300 – $24,700$18,500+1%
Green Bay, WI174,550 jobs$12,000 – $24,000$18,000−2%
Appleton, WI124,230 jobs$12,300 – $24,600$18,500level
Oshkosh, WI93,750 jobs$14,100 – $28,300$21,200+16%
Eau Claire, WI86,060 jobs$11,900 – $23,900$17,900−2%

Metros of a similar size

Big cities and small ones price differently, so here is Sheboygan against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Dothan, AL60,720 jobs$9,700 – $19,500$14,600−21%
Jonesboro, AR60,620 jobs$9,850 – $19,800$14,800−19%
Decatur, AL61,240 jobs$10,700 – $21,400$16,000−13%
Chambersburg, PA60,280 jobs$10,900 – $21,900$16,400−11%

Related projects, priced for Sheboygan

Jobs that often go together with composite deck are priced below at their usual sizes, using the same Sheboygan wage and price inputs. Compared with national midpoints, paver patio comes out highest (+9%) and wood deck lowest (−1%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Wood deck300 sq ft$7,500 – $15,100−1%
Concrete patio300 sq ft$1,250 – $4,250+5%
Paver patio300 sq ft$3,300 – $5,950+9%
Gutters160 linear ft$1,400 – $4,350+4%

Optional extras in Sheboygan

Add-ons start from national price ranges and are scaled by 1.00 for Sheboygan, which is the average of the area's wage index (1.07) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a deck railing (approx. 0.3 ft per sq ft)$1,800 – $5,400

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $15,900 to $20,800 for Sheboygan, WI is attached.

Detailed composite deck report for Sheboygan, WI, $9

Multi-page report for Sheboygan, WI: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Composite deck in Sheboygan: your questions

+How much does it cost to build a composite deck in Sheboygan?

For 300 sq ft, expect $12,200 to $24,500 in the Sheboygan area. A standard-spec job lands at $15,900 to $20,800. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for composite deck in Sheboygan?

About $40.50 to $81.50 per sq ft for materials and labor, plus $45 to $140 for the permit if one is needed. The US range is $40 to $80.

+Is composite deck cheaper in Sheboygan or Appleton?

Appleton is 50 miles away. The midpoint for 300 sq ft there is $18,500, which is 0% more than Sheboygan ($18,400). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Sheboygan?

About 63% at the midpoint, or $11,500 out of $18,400. Materials are 37% and permits 1%. Nationally, labor is 60%.

+What would 16x20 (320 sq ft) cost in Sheboygan?

$13,100 to $26,200. Pick a different size in the estimator above to get your own number.

+Does composite deck need a permit in Sheboygan?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $140 for fees in the Sheboygan area (our national range of $50 to $150 scaled by the local price level).

+Is Sheboygan expensive for composite deck compared with the rest of Wisconsin?

Sheboygan is 1% above the Wisconsin statewide estimate ($18,300 at the midpoint). We cover 12 metros in Wisconsin; see the state page to compare them.

+What do carpenters earn in Sheboygan?

The BLS median is $30.17 an hour in the Sheboygan area, compared with $29.12 nationally. The 25th to 75th percentile range is $24.39 to $40.68.

+What do basic and premium composite deck work cost in Sheboygan?

For 300 sq ft, basic work runs $12,200 to $17,200 and premium work $19,600 to $24,500. Basic means: entry-level composite boards, low deck, simple shape. Premium means: premium capped or PVC boards, multi-level, hidden fasteners.

+When is the best time to build a composite deck in Sheboygan?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through November. September and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a deck railing" add in Sheboygan?

$1,800 to $5,400 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Composite deck near Sheboygan

Composite deck: all pricesComposite deck in WisconsinAll projects in SheboyganWisconsin cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.