Skip to content
CostLocal

Concrete slab cost in Green Bay, WI

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,550 – $5,300
Per sq ft
$6.25 – $12.50
before permit
Versus US midpoint
+2%
US $3,850
Rank of 300 metros
#90
1 = most expensive

Green Bay homeowners pay roughly $2,550 to $5,300 to pour a concrete slab at 400 sq ft, or $6.25 to $12.50 per sq ft (permit not included). Against the US midpoint, Green Bay is almost level. Cement masons and concrete finishers earn a median of $30.89 an hour in the Green Bay area, 13% above the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Green Bay, WI, standard level

$3,350 to $4,450

About $8.05 to $10.50 per sq ft before permits. Labor is about 47% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,200
Labor$1,650$2,000
Permits and fees$140$270
Total$3,350$4,450
Save and get a PDF report

Cost breakdown for 400 sq ft in Green Bay, WI

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,65048%
Labor$1,350$1,800$2,30047%
Permits and fees$45$210$3705%
Total$2,550$3,900$5,300100%

Where the Green Bay price comes from

Labor is 47% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Green Bay the blended ratio comes out at 1.14.

On the materials line, the BEA goods price index for the Green Bay metro is 93.8 (US = 100). The midpoint materials bill for 400 sq ft comes to $1,900, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (93.1) and land at $45 to $370.

Concrete slab: what moves the price in Green Bay

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Is Green Bay cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $3,650 to $4,100 across Green Bay and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Green Bay, WIthis page$2,550 – $5,300$3,900
Appleton, WI20 miles$2,650 – $5,450$4,050+3%
Oshkosh, WI45 miles$2,650 – $5,500$4,100+4%
Sheboygan, WI50 miles$2,550 – $5,300$3,950+1%
Wausau, WI90 miles$2,500 – $5,200$3,850−1%
Muskegon, MI105 miles$2,350 – $4,950$3,650−7%
Wisconsin (statewide)$2,550 – $5,300$3,950+1%
United States$2,450 – $5,200$3,850−2%

Across 300 US metros, Green Bay comes in at #90 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Green Bay is 1% below the Wisconsin figure.

Other Wisconsin metros

Wisconsin metros compared with Green Bay
MetroSizeRangeMidpointvs. here
Milwaukee, WI820,780 jobs$2,700 – $5,550$4,100+5%
Madison, WI408,070 jobs$2,600 – $5,400$4,000+2%
Appleton, WI124,230 jobs$2,650 – $5,450$4,050+3%
Oshkosh, WI93,750 jobs$2,650 – $5,500$4,100+4%
Eau Claire, WI86,060 jobs$2,550 – $5,250$3,900level
La Crosse, WI84,380 jobs$2,500 – $5,250$3,900−1%

Cities with a workforce like Green Bay's

Big cities and small ones price differently, so here is Green Bay against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Reading, PA174,670 jobs$2,500 – $5,250$3,900−1%
Naples, FL173,880 jobs$2,300 – $4,900$3,600−8%
Anchorage, AK177,050 jobs$3,050 – $6,250$4,650+19%
Mobile, AL172,550 jobs$2,150 – $4,650$3,400−13%

When to schedule concrete slab in Green Bay

We use NOAA's 1991-2020 climate normals for Green Bay (5 miles from the city center). These are 30-year monthly averages, not forecasts.

May through September is the stretch where pouring concrete runs into the fewest weather problems in Green Bay (5 of 12 months). January, February, March, April, October, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Green Bay gets about 32 inches of precipitation in a normal year, including roughly 56 inches of snow. The wettest months are June, July and August (4.1 inches in June). Inside the workable window, May and September are the driest, at 3.4 and 3.2 inches. The station averages about 6 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Green Bay (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan26111.4Cold
Feb29131.2Cold
Mar40242.0Cold
Apr54353.0Cold
May67463.4Workable
Jun77564.1Workable
Jul81603.6Workable
Aug79583.4Workable
Sep72503.2Workable
Oct58402.7Cold
Nov44292.0Cold
Dec31181.8Cold

Related projects, priced for Green Bay

Because every project leans on different trades, Green Bay's wage level does not move all prices equally. Against the US midpoint, gravel driveway runs +8% and asphalt driveway +1%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,850 – $9,950+8%
Concrete patio300 sq ft$1,250 – $4,200+4%
Detached garage576 sq ft$29,200 – $58,600+1%
Stamped concrete400 sq ft$3,350 – $8,300+4%
Asphalt driveway600 sq ft$3,050 – $7,500+1%
Gravel driveway1,000 sq ft$2,700 – $11,000+8%

Extras that change the Green Bay total

Extras are quoted nationally and then scaled to Green Bay by the average of the local wage index (1.14) and goods index (0.94), a factor of 1.04. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$420 – $1,250
Remove old concrete first$830 – $2,500

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Green Bay is 1.14 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $30.89 an hour, which is 13% above the national $27.41. The middle half of them earn between $28.37 and $37.30 an hour. BLS counts 310 of them working in the area, 17.8 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $26.39 an hour, 16% above the US median of $22.66. The middle half of them earn between $22.53 and $31.63 an hour. About 1,160 work in the metro. That is 66.5 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $36.68 an hour, which is 27% above the national $28.78. The middle half of them earn between $29.32 and $45.65 an hour. BLS counts 420 of them working in the area, 24.1 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

For carpenters (47-2031, weighted 10%) the local median is $29.00 an hour, which is in line with the national $29.12. The middle half of them earn between $23.46 and $36.01 an hour. BLS counts 860 of them working in the area, 49.3 for every 10,000 jobs (US: 43.1), so the local bench is about average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($37.30 an hour) instead of the median, the labor line grows by about $190. At the 25th percentile ($28.37) it shrinks by about $75. The total moves by 4.8% or 1.9%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 174,550 jobs in the Green Bay area. That makes it the 133rd largest of the 300 metros we cover, with 0.11% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$28.37$30.89$37.30$27.411.13metro
Construction laborers (47-2061)30%$22.53$26.39$31.63$22.661.16metro
Operating engineers and other construction equipment operators (47-2073)10%$29.32$36.68$45.65$28.781.27metro
Carpenters (47-2031)10%$23.46$29.00$36.01$29.121.00metro
Blended100%1.14

Green Bay: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Green Bay wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,550 to $3,650

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,350 to $4,450

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,200 to $5,300

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$670 – $1,050$950 – $1,300$1,250 – $1,600
12x12 (144 sq ft)$940 – $1,400$1,300 – $1,800$1,650 – $2,150
20x20 (400 sq ft)$2,550 – $3,650$3,350 – $4,450$4,200 – $5,300
24x24 garage floor (576 sq ft)$3,650 – $5,150$4,800 – $6,300$5,900 – $7,450
30x40 foundation (1,200 sq ft)$7,550 – $10,600$9,800 – $12,800$12,100 – $15,100

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,350 to $4,450 for Green Bay, WI is attached.

Detailed concrete slab report for Green Bay, WI, $9

Multi-page report for Green Bay, WI: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Green Bay: your questions

+How much does it cost to pour a concrete slab in Green Bay?

For 400 sq ft, expect $2,550 to $5,300 in the Green Bay area. A standard-spec job lands at $3,350 to $4,450. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Green Bay?

About $6.25 to $12.50 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Green Bay or Appleton?

Appleton is 20 miles away. The midpoint for 400 sq ft there is $4,050, which is 3% more than Green Bay ($3,900). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Green Bay?

About 47% at the midpoint, or $1,800 out of $3,900. Materials are 48% and permits 5%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Green Bay?

$2,550 to $5,300. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Green Bay?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the Green Bay area (our national range of $50 to $400 scaled by the local price level).

+Is Green Bay expensive for concrete slab compared with the rest of Wisconsin?

Green Bay is 1% below the Wisconsin statewide estimate ($3,950 at the midpoint). We cover 12 metros in Wisconsin; see the state page to compare them.

+What do cement masons and concrete finishers earn in Green Bay?

The BLS median is $30.89 an hour in the Green Bay area, compared with $27.41 nationally. The 25th to 75th percentile range is $28.37 to $37.30.

+What do basic and premium concrete slab work cost in Green Bay?

For 400 sq ft, basic work runs $2,550 to $3,650 and premium work $4,200 to $5,300. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Green Bay?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through September. May and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Green Bay?

$420 to $1,250 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Green Bay

Concrete slab: all pricesConcrete slab in WisconsinAll projects in Green BayWisconsin cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.