Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (300 sq ft)
$1,400 – $4,600
Per sq ft
$4.45 – $14
before permit
Versus US midpoint
+14%
US $2,650
Metros covered
23

What does it cost to pour a concrete patio in California? Plan on $1,400 to $4,600 for 300 sq ft. Wages (1.20x the US blend), materials (price index 106.1) and permit costs (110.7) put the state above the national midpoint by 14%.

Inside California, the metros we cover range from $2,700 (Visalia) to $3,400 (San Francisco) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in California (statewide), standard level

$2,350 to $3,650

About $7.25 to $11 per sq ft before permits. Labor is about 54% of the bill.

Cost breakdown
PartLowHigh
Materials$990$1,250
Labor$1,200$2,050
Permits and fees$170$330
Total$2,350$3,650
Save and get a PDF report

Cost breakdown for 300 sq ft in California

Part of the jobLowMidpointHighShare
Materials$800$1,100$1,45037%
Labor$540$1,650$2,70054%
Permits and fees$55$250$4408%
Total$1,400$3,000$4,600100%

Concrete patio: what moves the price in California

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

How California compares with nearby states

California ranks 6 of 51 (the 50 states plus DC) for concrete patio, where 1 is the most expensive. The costliest is Hawaii at $3,650 and the cheapest Arkansas at $2,250, both for 300 sq ft at the midpoint. California sits at $3,000. The five states closest by workforce center are listed below.

States near California, same project and size
StateDistanceRangeMidpointvs. here
Nevada210 miles away$1,250 – $4,100$2,700−10%
Arizona430 miles away$1,200 – $3,950$2,600−13%
Utah490 miles away$1,200 – $3,900$2,550−14%
Idaho600 miles away$1,200 – $3,900$2,550−15%
Oregon690 miles away$1,350 – $4,400$2,900−3%

California seasons and concrete patio

Season matters for concrete patio. For each California metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.

Los Angeles has the longest comfortable season of the metros we cover in California at 12 months; Redding has the shortest at 5 (March through May and October through November). Rainfall runs from 3 inches a year in El Centro to 34 inches in Redding.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Los Angeles48781412: all year
San Francisco47662312: all year
Riverside4395109: October through June
San Diego46801112: all year
San Jose42811312: all year
Sacramento41941910: September through June
Fresno4198117: January through May and October through November
Bakersfield419867: January through May and October through November
Oxnard46731312: all year
Stockton3995176: February through May and October through November
Santa Rosa3882329: March through November
Santa Maria41731311: January through November
Modesto3995127: February through May and September through November
Salinas42711312: all year
Visalia3894108: February through June and September through November
Vallejo3879208: March through October
San Luis Obispo41781811: January through November
Santa Cruz41743112: all year
Merced3796125: March through May and October through November
Chico3695275: March through June and October
Napa40832710: February through November
Redding38100345: March through May and October through November
El Centro4310736: November through April

Quality levels and sizes in California

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide California wages and prices. The grid prices the same bands at 3 common sizes.

Basic

$1,400 to $2,650

Plain gray slab, broom finish, flat yard

Standard

$2,350 to $3,650

Colored or stained, saw-cut joints, minor grading

Premium

$3,300 to $4,600

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$500 – $1,050$900 – $1,450$1,300 – $1,800
12x16 (192 sq ft)$910 – $1,800$1,550 – $2,450$2,200 – $3,100
20x20 (400 sq ft)$1,850 – $3,500$3,100 – $4,750$4,300 – $5,950

California labor market for concrete patio

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 4 trades drive the labor line for this job, and the weighted ratio against the national wage level is 1.20 for California.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $30.15 an hour, which is 10% above the national $27.41. The middle half of them earn between $24.73 and $40.42 an hour. BLS counts 28,700 of them working in the state, 15.8 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $28.98 an hour, 28% above the US median of $22.66. The middle half of them earn between $23.15 and $37.75 an hour. About 88,240 work in the state. That is 48.4 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

For carpenters (47-2031, weighted 10%) the local median is $36.50 an hour, which is 25% above the national $29.12. The middle half of them earn between $28.72 and $46.07 an hour. BLS counts 100,750 of them working in the state, 55.3 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $41.90 an hour, which is 46% above the national $28.78. The middle half of them earn between $31.36 and $60.37 an hour. BLS counts 36,020 of them working in the state, 19.8 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

A crew paid at the 75th percentile for cement masons and concrete finishers ($40.42 an hour) would add about $250 to the statewide midpoint; one at the 25th percentile ($24.73) would take off about $130. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 18,213,700 jobs across California (May 2025), which is 11.7% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$24.73$30.15$40.42$27.411.10state
Construction laborers (47-2061)30%$23.15$28.98$37.75$22.661.28state
Carpenters (47-2031)10%$28.72$36.50$46.07$29.121.25state
Operating engineers and other construction equipment operators (47-2073)10%$31.36$41.90$60.37$28.781.46state
Blended100%1.20

Extras that change the California total

Extras are quoted nationally and then scaled to California by the average of the local wage index (1.20) and goods index (1.06), a factor of 1.13. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$1,000 – $3,400

Concrete patio cost by metro in California

8 of the 23 metros sit above the statewide midpoint of $3,000, and the top-to-bottom gap is 26%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (300 sq ft)Midpointvs. state
San Francisco, CA$1,550 – $5,250$3,400+14%
San Jose, CA$1,500 – $5,100$3,300+10%
Modesto, CA$1,450 – $4,850$3,150+5%
Napa, CA$1,450 – $4,800$3,150+5%
Salinas, CA$1,400 – $4,650$3,000+1%
San Diego, CA$1,400 – $4,600$3,000+1%
Santa Rosa, CA$1,400 – $4,650$3,000+1%
Los Angeles, CA$1,400 – $4,650$3,000+1%
Vallejo, CA$1,400 – $4,600$3,000level
Oxnard, CA$1,400 – $4,550$2,950−1%
Sacramento, CA$1,400 – $4,500$2,950−1%
San Luis Obispo, CA$1,350 – $4,500$2,950−2%
Santa Cruz, CA$1,350 – $4,450$2,900−3%
Santa Maria, CA$1,350 – $4,400$2,900−3%
Redding, CA$1,350 – $4,400$2,850−4%
Riverside, CA$1,350 – $4,400$2,850−4%
Chico, CA$1,350 – $4,350$2,850−5%
Stockton, CA$1,350 – $4,350$2,850−5%
Bakersfield, CA$1,350 – $4,300$2,850−5%
Fresno, CA$1,350 – $4,300$2,800−6%
Merced, CA$1,300 – $4,200$2,750−8%
El Centro, CA$1,300 – $4,150$2,750−9%
Visalia, CA$1,300 – $4,100$2,700−10%

Related projects, priced for California

The table prices neighboring jobs at their usual sizes using statewide California wages and prices. Against national midpoints, asphalt driveway comes out highest (+22%) and concrete slab lowest (+12%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,750 – $5,800+12%
Stamped concrete400 sq ft$3,650 – $8,950+12%
Paver patio300 sq ft$3,450 – $6,300+15%
Wood deck300 sq ft$8,650 – $17,400+15%
Concrete driveway600 sq ft$4,200 – $10,700+16%
Asphalt driveway600 sq ft$3,650 – $9,100+22%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,350 to $3,650 for California is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete patio numbers for California line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in California: your questions

+How much does it cost to pour a concrete patio in California?

$1,400 to $4,600 for 300 sq ft, using statewide wages and prices. Metro areas inside California can sit above or below that.

+Which city in California is cheapest for concrete patio?

Visalia at about $2,700 (midpoint, 300 sq ft). The priciest is San Francisco at $3,400.

+Is concrete patio cheaper in California than the US average?

It is 14% more expensive: $3,000 against $2,650 for 300 sq ft at the midpoint.

+What share of the price is labor in California?

About 54% ($1,650). Materials are 37%. Statewide labor for this job is weighted 1.20x the national wage level.

+What do cement masons and concrete finishers earn in California?

The BLS statewide median is $30.15 an hour, against $27.41 for the US. The 25th to 75th percentile range is $24.73 to $40.42.

+Where does California rank for concrete patio costs?

6th most expensive of 51 (the 50 states plus DC) at the midpoint, $3,000 for 300 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete patio work cost in California?

For 300 sq ft, basic work runs $1,400 to $2,650 and premium work $3,300 to $4,600. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+Does the season matter for concrete patio in California?

Yes where winters or summers are hard. Of the California metros we cover, Los Angeles has the most comfortable months (12 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add an acid or water-based stain" add in California?

$1,000 to $3,400 for 300 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete patio by city in California

Concrete patio: all pricesCalifornia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.