Stamped concrete cost in Baltimore, MD
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $3,200 – $7,850
- Per sq ft
- $7.90 – $18.50
- before permit
- Versus US midpoint
- −1%
- US $5,600
- Rank of 300 metros
- #144
- 1 = most expensive
If you want to pour stamped concrete in Baltimore, plan on $3,200 to $7,850 for 400 sq ft, all in. Per sq ft, that is $7.90 to $18.50 for materials and labor, with the permit on top. The local midpoint lands close to the national one. Cement masons and concrete finishers earn a median of $24.98 an hour in the Baltimore area, 9% below the US median of $27.41.
Estimate your stamped concrete cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Baltimore, MD, standard level
$4,600 to $6,450
About $11 to $15.50 per sq ft before permits. Labor is about 46% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $2,400 | $3,150 |
| Labor | $2,050 | $3,050 |
| Permits and fees | $150 | $270 |
| Total | $4,600 | $6,450 |
Cost breakdown for 400 sq ft in Baltimore, MD
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,850 | $2,750 | $3,700 | 50% |
| Labor | $1,300 | $2,550 | $3,800 | 46% |
| Permits and fees | $50 | $210 | $370 | 4% |
| Total | $3,200 | $5,500 | $7,850 | 100% |
Where the Baltimore price comes from
The wage side of the estimate leans on cement masons and concrete finishers, who do 60% of the hours on a typical job. Their local median is $24.98 an hour. Add the other trades involved and the blended wage index for Baltimore is 0.94 (US = 1.00), which puts labor at 46% of the total.
On the materials line, the BEA goods price index for the Baltimore metro is 102.4 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,750, compared with $2,700 at national prices. Permit and inspection fees are scaled by the broader index (104.5) and land at $50 to $370.
Planning more than one job in Baltimore?
Because every project leans on different trades, Baltimore's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs +3% and concrete driveway −2%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete patio | 300 sq ft | $1,250 – $3,950 | −1% |
| Concrete driveway | 600 sq ft | $3,600 – $8,950 | −2% |
| Paver patio | 300 sq ft | $3,000 – $5,450 | level |
| Concrete slab | 400 sq ft | $2,450 – $5,200 | level |
| Asphalt driveway | 600 sq ft | $3,150 – $7,650 | +3% |
| Gravel driveway | 1,000 sq ft | $2,550 – $10,300 | +1% |
Climate in Baltimore: timing your stamped concrete job
We use NOAA's 1991-2020 climate normals for Md Sci Ctr Baltimore (in the city). These are 30-year monthly averages, not forecasts.
April through June and August through November are the stretches where pouring concrete runs into the fewest weather problems in Baltimore (7 of 12 months). January, February, March and December have an average overnight low of 40°F or below; July has an average daytime high of 90°F or more.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Heat matters for concrete as well. With average highs of 90°F or more in July, crews often start early, wet the base and plan for faster set times.
Baltimore gets about 44 inches of precipitation in a normal year. The wettest months are July, August and September (4.7 inches in July). Inside the workable window, June and November are the driest, at 3.4 and 3.0 inches. The station averages about 43 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 44 | 30 | 3.1 | Cold |
| Feb | 47 | 32 | 2.8 | Cold |
| Mar | 55 | 39 | 3.9 | Cold |
| Apr | 67 | 48 | 3.5 | Workable |
| May | 76 | 58 | 3.4 | Workable |
| Jun | 85 | 68 | 3.4 | Workable |
| Jul | 90 | 73 | 4.7 | Hot |
| Aug | 87 | 71 | 4.3 | Workable |
| Sep | 80 | 65 | 4.5 | Workable |
| Oct | 69 | 53 | 3.5 | Workable |
| Nov | 58 | 43 | 3.0 | Workable |
| Dec | 48 | 35 | 3.7 | Cold |
Optional extras in Baltimore
Extras are quoted nationally and then scaled to Baltimore by the average of the local wage index (0.94) and goods index (1.02), a factor of 0.98. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add a vapor barrier | $200 – $390 |
Specs and site conditions that change a Baltimore bid
Specialist labor
Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.
Sealing and vapor barrier
Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).
Not included
These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.
Is Baltimore cheap or dear? The local comparison
Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $5,300 to $5,800 across Baltimore and its five closest metros.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Baltimore, MDthis page | $3,200 – $7,850 | $5,500 | |
| York, PA45 miles | $3,350 – $8,150 | $5,750 | +4% |
| Lancaster, PA55 miles | $3,300 – $8,150 | $5,750 | +4% |
| Dover, DE60 miles | $3,100 – $7,500 | $5,300 | −4% |
| Washington, DC60 miles | $3,350 – $8,250 | $5,800 | +5% |
| Lexington Park, MD70 miles | $3,150 – $7,700 | $5,450 | −2% |
| Maryland (statewide) | $3,250 – $7,850 | $5,550 | level |
| United States | $3,250 – $7,950 | $5,600 | +1% |
Across 300 US metros, Baltimore comes in at #144 from the top. The priciest is Kahului, HI at $8,150; the cheapest is McAllen, TX at $4,550 (midpoints, 400 sq ft). Statewide, Baltimore is 0% below the Maryland figure.
Other Maryland metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Hagerstown, MD | 107,170 jobs | $3,000 – $7,250 | $5,100 | −7% |
| Lexington Park, MD | 70,650 jobs | $3,150 – $7,700 | $5,450 | −2% |
Cities with a workforce like Baltimore's
Big cities and small ones price differently, so here is Baltimore against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Charlotte, NC | 1,358,370 jobs | $3,000 – $7,350 | $5,200 | −6% |
| St. Louis, MO | 1,341,320 jobs | $3,550 – $8,850 | $6,200 | +12% |
| Orlando, FL | 1,411,730 jobs | $2,950 – $7,200 | $5,100 | −8% |
| Austin, TX | 1,293,690 jobs | $3,000 – $7,250 | $5,100 | −7% |
Baltimore: what basic, standard and premium work costs
Three bands are cut from the same cited range and localized for Baltimore wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.
Basic
$3,200 to $5,050
Basic pattern, one integral color
Standard
$4,600 to $6,450
Two-tone color release and a border
Premium
$6,000 to $7,850
Multi-color, hand-detailed, sealed to a high finish
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x20 patio (200 sq ft) | $1,650 – $2,600 | $2,350 – $3,350 | $3,100 – $4,100 |
| 20x20 patio (400 sq ft) | $3,200 – $5,050 | $4,600 – $6,450 | $6,000 – $7,850 |
| 2-car driveway (600 sq ft) | $4,800 – $7,500 | $6,850 – $9,550 | $8,850 – $11,600 |
Baltimore labor market for stamped concrete
Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Baltimore is 0.94 times the national level.
For cement masons and concrete finishers (47-2051, weighted 60%) the local median is $24.98 an hour, which is 9% below the national $27.41. The middle half of them earn between $22.75 and $28.44 an hour. BLS counts 1,390 of them working in the area, 10.2 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.
Construction laborers (47-2061), 30% of the weighting: a median of $22.34 an hour, in line with the US median of $22.66. The middle half of them earn between $18.72 and $26.66 an hour. About 10,520 work in the metro. That is 77.5 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $29.20 an hour, which is in line with the national $28.78. The middle half of them earn between $23.67 and $32.50 an hour. BLS counts 3,350 of them working in the area, 24.7 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($28.44 an hour) instead of the median, the labor line grows by about $200. At the 25th percentile ($22.75) it shrinks by about $130. The total moves by 3.7% or 2.4%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 1,356,680 jobs in the Baltimore-Columbia-Towson area. That makes it the 22nd largest of the 300 metros we cover, with 0.87% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 60% | $22.75 | $24.98 | $28.44 | $27.41 | 0.91 | metro |
| Construction laborers (47-2061) | 30% | $18.72 | $22.34 | $26.66 | $22.66 | 0.99 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $23.67 | $29.20 | $32.50 | $28.78 | 1.01 | metro |
| Blended | 100% | 0.94 | |||||
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,600 to $6,450 for Baltimore, MD is attached.
Detailed stamped concrete report for Baltimore, MD, $9
The report lays out the stamped concrete numbers for Baltimore, MD line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Stamped concrete in Baltimore: your questions
+How much does it cost to pour stamped concrete in Baltimore?
For 400 sq ft, expect $3,200 to $7,850 in the Baltimore area. A standard-spec job lands at $4,600 to $6,450. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for stamped concrete in Baltimore?
About $7.90 to $18.50 per sq ft for materials and labor, plus $50 to $370 for the permit if one is needed. The US range is $8 to $19.
+Is stamped concrete cheaper in Baltimore or York?
York is 45 miles away. The midpoint for 400 sq ft there is $5,750, which is 4% more than Baltimore ($5,500). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Baltimore?
About 46% at the midpoint, or $2,550 out of $5,500. Materials are 50% and permits 4%. Nationally, labor is 48%.
+What would 20x20 patio (400 sq ft) cost in Baltimore?
$3,200 to $7,850. Pick a different size in the estimator above to get your own number.
+Does stamped concrete need a permit in Baltimore?
Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $370 for fees in the Baltimore area (our national range of $50 to $350 scaled by the local price level).
+Is Baltimore expensive for stamped concrete compared with the rest of Maryland?
Baltimore is 0% below the Maryland statewide estimate ($5,550 at the midpoint). We cover 3 metros in Maryland; see the state page to compare them.
+What do cement masons and concrete finishers earn in Baltimore?
The BLS median is $24.98 an hour in the Baltimore area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.75 to $28.44.
+What do basic and premium stamped concrete work cost in Baltimore?
For 400 sq ft, basic work runs $3,200 to $5,050 and premium work $6,000 to $7,850. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.
+When is the best time to pour stamped concrete in Baltimore?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through June and August through November. June and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add a vapor barrier" add in Baltimore?
$200 to $390 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Stamped concrete near Baltimore
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.