Skip to content
CostLocal

Concrete slab cost in Baltimore, MD

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,450 – $5,200
Per sq ft
$5.95 – $12
before permit
Versus US midpoint
Level
US $3,850
Rank of 300 metros
#124
1 = most expensive

Baltimore homeowners pay roughly $2,450 to $5,200 to pour a concrete slab at 400 sq ft, or $5.95 to $12 per sq ft (permit not included). Against the US midpoint, Baltimore is almost level. Cement masons and concrete finishers earn a median of $24.98 an hour in the Baltimore area, 9% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Baltimore, MD, standard level

$3,250 to $4,350

About $7.75 to $10 per sq ft before permits. Labor is about 40% of the bill.

Cost breakdown
PartLowHigh
Materials$1,700$2,350
Labor$1,400$1,700
Permits and fees$160$310
Total$3,250$4,350
Save and get a PDF report

Cost breakdown for 400 sq ft in Baltimore, MD

Part of the jobLowMidpointHighShare
Materials$1,250$2,050$2,85054%
Labor$1,150$1,550$1,90040%
Permits and fees$50$240$4206%
Total$2,450$3,800$5,200100%

What is behind the Baltimore number

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $24.98 an hour. Add the other trades involved and the blended wage index for Baltimore is 0.96 (US = 1.00), which puts labor at 40% of the total.

On the materials line, the BEA goods price index for the Baltimore metro is 102.4 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,050, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (104.5) and land at $50 to $420.

Cost by quality level and size in Baltimore

Three bands are cut from the same cited range and localized for Baltimore wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,450 to $3,550

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,250 to $4,350

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,100 to $5,200

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$650 – $1,050$940 – $1,300$1,250 – $1,600
12x12 (144 sq ft)$910 – $1,400$1,300 – $1,750$1,650 – $2,150
20x20 (400 sq ft)$2,450 – $3,550$3,250 – $4,350$4,100 – $5,200
24x24 garage floor (576 sq ft)$3,450 – $5,000$4,600 – $6,150$5,750 – $7,300
30x40 foundation (1,200 sq ft)$7,200 – $10,200$9,450 – $12,500$11,700 – $14,800

When to schedule concrete slab in Baltimore

We use NOAA's 1991-2020 climate normals for Md Sci Ctr Baltimore (in the city). These are 30-year monthly averages, not forecasts.

April through June and August through November are the stretches where pouring concrete runs into the fewest weather problems in Baltimore (7 of 12 months). January, February, March and December have an average overnight low of 40°F or below; July has an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July, crews often start early, wet the base and plan for faster set times.

Baltimore gets about 44 inches of precipitation in a normal year. The wettest months are July, August and September (4.7 inches in July). Inside the workable window, June and November are the driest, at 3.4 and 3.0 inches. The station averages about 43 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Md Sci Ctr Baltimore (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan44303.1Cold
Feb47322.8Cold
Mar55393.9Cold
Apr67483.5Workable
May76583.4Workable
Jun85683.4Workable
Jul90734.7Hot
Aug87714.3Workable
Sep80654.5Workable
Oct69533.5Workable
Nov58433.0Workable
Dec48353.7Cold

Why two Baltimore quotes can differ

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

How Baltimore compares

Same job, same size (400 sq ft), priced for the nearest metros. Washington is the priciest of the group at $3,950. Dover is the cheapest at $3,600.

Comparison with nearby areas
AreaRangeMidpointvs. here
Baltimore, MDthis page$2,450 – $5,200$3,800
York, PA45 miles$2,500 – $5,300$3,900+2%
Lancaster, PA55 miles$2,500 – $5,250$3,900+2%
Dover, DE60 miles$2,300 – $4,950$3,600−5%
Washington, DC60 miles$2,550 – $5,400$3,950+4%
Lexington Park, MD70 miles$2,400 – $5,100$3,750−2%
Maryland (statewide)$2,450 – $5,200$3,800level
United States$2,450 – $5,200$3,850level

Across 300 US metros, Baltimore comes in at #124 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Baltimore is 0% below the Maryland figure.

Other Maryland metros

Maryland metros compared with Baltimore
MetroSizeRangeMidpointvs. here
Hagerstown, MD107,170 jobs$2,250 – $4,800$3,550−7%
Lexington Park, MD70,650 jobs$2,400 – $5,100$3,750−2%

Cities with a workforce like Baltimore's

Big cities and small ones price differently, so here is Baltimore against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Charlotte, NC1,358,370 jobs$2,250 – $4,850$3,550−6%
St. Louis, MO1,341,320 jobs$2,750 – $5,650$4,200+10%
Orlando, FL1,411,730 jobs$2,200 – $4,800$3,500−8%
Austin, TX1,293,690 jobs$2,250 – $4,800$3,500−8%

What nearby projects cost in Baltimore

Because every project leans on different trades, Baltimore's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs +3% and concrete driveway −2%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,600 – $8,950−2%
Concrete patio300 sq ft$1,250 – $3,950−1%
Detached garage576 sq ft$29,300 – $58,900+1%
Stamped concrete400 sq ft$3,200 – $7,850−1%
Asphalt driveway600 sq ft$3,150 – $7,650+3%
Gravel driveway1,000 sq ft$2,550 – $10,300+1%

Extras that change the Baltimore total

Extras are quoted nationally and then scaled to Baltimore by the average of the local wage index (0.96) and goods index (1.02), a factor of 0.99. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$400 – $1,200
Remove old concrete first$790 – $2,400

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Baltimore is 0.96 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $24.98 an hour, which is 9% below the national $27.41. The middle half of them earn between $22.75 and $28.44 an hour. BLS counts 1,390 of them working in the area, 10.2 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $22.34 an hour, in line with the US median of $22.66. The middle half of them earn between $18.72 and $26.66 an hour. About 10,520 work in the metro. That is 77.5 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $29.20 an hour, which is in line with the national $28.78. The middle half of them earn between $23.67 and $32.50 an hour. BLS counts 3,350 of them working in the area, 24.7 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

For carpenters (47-2031, weighted 10%) the local median is $29.99 an hour, which is in line with the national $29.12. The middle half of them earn between $24.96 and $36.06 an hour. BLS counts 3,870 of them working in the area, 28.5 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($28.44 an hour) instead of the median, the labor line grows by about $100. At the 25th percentile ($22.75) it shrinks by about $65. The total moves by 2.6% or 1.7%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 1,356,680 jobs in the Baltimore-Columbia-Towson area. That makes it the 22nd largest of the 300 metros we cover, with 0.87% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$22.75$24.98$28.44$27.410.91metro
Construction laborers (47-2061)30%$18.72$22.34$26.66$22.660.99metro
Operating engineers and other construction equipment operators (47-2073)10%$23.67$29.20$32.50$28.781.01metro
Carpenters (47-2031)10%$24.96$29.99$36.06$29.121.03metro
Blended100%0.96

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,250 to $4,350 for Baltimore, MD is attached.

Detailed concrete slab report for Baltimore, MD, $9

The report lays out the concrete slab numbers for Baltimore, MD line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Baltimore: your questions

+How much does it cost to pour a concrete slab in Baltimore?

For 400 sq ft, expect $2,450 to $5,200 in the Baltimore area. A standard-spec job lands at $3,250 to $4,350. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Baltimore?

About $5.95 to $12 per sq ft for materials and labor, plus $50 to $420 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Baltimore or York?

York is 45 miles away. The midpoint for 400 sq ft there is $3,900, which is 2% more than Baltimore ($3,800). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Baltimore?

About 40% at the midpoint, or $1,550 out of $3,800. Materials are 54% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Baltimore?

$2,450 to $5,200. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Baltimore?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $420 for fees in the Baltimore area (our national range of $50 to $400 scaled by the local price level).

+Is Baltimore expensive for concrete slab compared with the rest of Maryland?

Baltimore is 0% below the Maryland statewide estimate ($3,800 at the midpoint). We cover 3 metros in Maryland; see the state page to compare them.

+What do cement masons and concrete finishers earn in Baltimore?

The BLS median is $24.98 an hour in the Baltimore area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.75 to $28.44.

+What do basic and premium concrete slab work cost in Baltimore?

For 400 sq ft, basic work runs $2,450 to $3,550 and premium work $4,100 to $5,200. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Baltimore?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through June and August through November. June and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Baltimore?

$400 to $1,200 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Baltimore

Concrete slab: all pricesConcrete slab in MarylandAll projects in BaltimoreMaryland cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.