Skip to content
CostLocal

Concrete slab cost in Maryland

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$2,450 – $5,200
Per sq ft
$5.95 – $12
before permit
Versus US midpoint
Level
US $3,850
Metros covered
3

Across Maryland, a concrete slab costs about $2,450 to $5,200 for 400 sq ft. Statewide, that midpoint is 0% below the US figure of $3,850. Cement masons and concrete finishers earn a median $24.98 an hour in Maryland (US: $27.41).

Inside Maryland, the metros we cover range from $3,550 (Hagerstown) to $3,800 (Baltimore) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Maryland (statewide), standard level

$3,250 to $4,400

About $7.75 to $10 per sq ft before permits. Labor is about 40% of the bill.

Cost breakdown
PartLowHigh
Materials$1,700$2,400
Labor$1,400$1,700
Permits and fees$160$310
Total$3,250$4,400
Save and get a PDF report

Cost breakdown for 400 sq ft in Maryland

Part of the jobLowMidpointHighShare
Materials$1,250$2,050$2,85054%
Labor$1,150$1,550$1,90040%
Permits and fees$50$240$4206%
Total$2,450$3,800$5,200100%

Basic, standard or premium: Maryland prices

Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,450 to $3,550

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,250 to $4,400

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,100 to $5,200

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$650 – $1,050$940 – $1,350$1,250 – $1,600
12x12 (144 sq ft)$910 – $1,400$1,300 – $1,750$1,650 – $2,150
20x20 (400 sq ft)$2,450 – $3,550$3,250 – $4,400$4,100 – $5,200
24x24 garage floor (576 sq ft)$3,500 – $5,000$4,650 – $6,150$5,800 – $7,300
30x40 foundation (1,200 sq ft)$7,200 – $10,200$9,500 – $12,500$11,800 – $14,800

Maryland seasons and concrete slab

Weather decides when pouring concrete can happen, and Maryland is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.

Lexington Park has the longest comfortable season of the metros we cover in Maryland at 8 months (April through November); Hagerstown has the shortest at 7 (April through October). Rainfall runs from 44 inches a year in Hagerstown to 45 inches in Lexington Park.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Baltimore3090447: April through June and August through November
Hagerstown2286447: April through October
Lexington Park3087458: April through November

Maryland against its neighbors

Maryland ranks 23 of 51 (the 50 states plus DC) for concrete slab, where 1 is the most expensive. The costliest is Hawaii at $5,150 and the cheapest Arkansas at $3,350, both for 400 sq ft at the midpoint. Maryland sits at $3,800. The five states closest by workforce center are listed below.

States near Maryland, same project and size
StateDistanceRangeMidpointvs. here
District of Columbia50 miles away$2,650 – $5,600$4,100+8%
Delaware60 miles away$2,400 – $5,050$3,700−3%
Pennsylvania70 miles away$2,500 – $5,300$3,900+2%
New Jersey110 miles away$2,800 – $5,850$4,300+13%
Virginia150 miles away$2,350 – $5,050$3,700−3%

Optional extras in Maryland

Add-ons start from national price ranges and are scaled by 0.99 for Maryland, which is the average of the area's wage index (0.96) and goods price index (1.03). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$400 – $1,200
Remove old concrete first$790 – $2,400

If you are planning more than one job in Maryland

Each project weights the trades differently, so Maryland's wage level does not push every price by the same amount. Compared with the US midpoint, asphalt driveway is +4% and concrete driveway −2%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,600 – $9,000−2%
Concrete patio300 sq ft$1,250 – $3,950−1%
Detached garage576 sq ft$29,700 – $59,700+3%
Stamped concrete400 sq ft$3,250 – $7,850−1%
Asphalt driveway600 sq ft$3,150 – $7,700+4%
Gravel driveway1,000 sq ft$2,550 – $10,400+2%

Maryland labor market for concrete slab

Maryland's labor line is priced from 4 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 0.96 times the national level.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $24.98 an hour, 9% below the US median of $27.41. The middle half of them earn between $22.75 and $28.44 an hour. About 2,540 work in the state. That is 9.2 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $22.58 an hour, which is in line with the national $22.66. The middle half of them earn between $18.98 and $26.70 an hour. BLS counts 20,920 of them working in the state, 75.7 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $29.53 an hour, in line with the US median of $28.78. The middle half of them earn between $23.76 and $34.07 an hour. About 6,610 work in the state. That is 23.9 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

Carpenters (47-2031), 10% of the weighting: a median of $30.27 an hour, 4% above the US median of $29.12. The middle half of them earn between $25.11 and $36.93 an hour. About 9,770 work in the state. That is 35.4 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

A crew paid at the 75th percentile for cement masons and concrete finishers ($28.44 an hour) would add about $100 to the statewide midpoint; one at the 25th percentile ($22.75) would take off about $65. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 2,763,030 jobs across Maryland (May 2025), which is 1.8% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$22.75$24.98$28.44$27.410.91state
Construction laborers (47-2061)30%$18.98$22.58$26.70$22.661.00state
Operating engineers and other construction equipment operators (47-2073)10%$23.76$29.53$34.07$28.781.03state
Carpenters (47-2031)10%$25.11$30.27$36.93$29.121.04state
Blended100%0.96

Why two Maryland quotes can differ

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Which Maryland city is cheapest for concrete slab?

0 of the 3 metros sit above the statewide midpoint of $3,800, and the top-to-bottom gap is 8%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Baltimore, MD$2,450 – $5,200$3,800level
Lexington Park, MD$2,400 – $5,100$3,750−2%
Hagerstown, MD$2,250 – $4,800$3,550−8%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,250 to $4,400 for Maryland is attached.

Detailed concrete slab report for Maryland, $9

Multi-page report for Maryland: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Maryland: your questions

+How much does it cost to pour a concrete slab in Maryland?

$2,450 to $5,200 for 400 sq ft, using statewide wages and prices. Metro areas inside Maryland can sit above or below that.

+Which city in Maryland is cheapest for concrete slab?

Hagerstown at about $3,550 (midpoint, 400 sq ft). The priciest is Baltimore at $3,800.

+Is concrete slab cheaper in Maryland than the US average?

It is 0% cheaper: $3,800 against $3,850 for 400 sq ft at the midpoint.

+What share of the price is labor in Maryland?

About 40% ($1,550). Materials are 54%. Statewide labor for this job is weighted 0.96x the national wage level.

+Does a concrete slab need a permit?

Often yes if it's structural (a garage floor or foundation) and often no for a small at-grade pad. Permit fees run $50-$400 depending on the city (HomeGuide).

+What do cement masons and concrete finishers earn in Maryland?

The BLS statewide median is $24.98 an hour, against $27.41 for the US. The 25th to 75th percentile range is $22.75 to $28.44.

+Where does Maryland rank for concrete slab costs?

23rd most expensive of 51 (the 50 states plus DC) at the midpoint, $3,800 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete slab work cost in Maryland?

For 400 sq ft, basic work runs $2,450 to $3,550 and premium work $4,100 to $5,200. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+Does the season matter for concrete slab in Maryland?

Yes where winters or summers are hard. Of the Maryland metros we cover, Lexington Park has the most comfortable months (8 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add rebar reinforcement" add in Maryland?

$400 to $1,200 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete slab by city in Maryland

Concrete slab: all pricesMaryland cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.