Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$2,650 – $5,600
Per sq ft
$6.45 – $13
before permit
Versus US midpoint
+8%
US $3,850
Metros covered
1

District of Columbia prices for concrete slab: $2,650 to $5,600 for 400 sq ft, or $6.45 to $13 per sq ft without the permit. The state midpoint is 8% above the national one. Local wages for cement masons and concrete finishers are $29.65 an hour.

District of Columbia has one metro in our dataset, Washington, so the statewide and metro figures are close. The state figure uses BLS statewide wages, which include rural areas.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in District of Columbia (statewide), standard level

$3,500 to $4,700

About $8.40 to $11 per sq ft before permits. Labor is about 42% of the bill.

Cost breakdown
PartLowHigh
Materials$1,800$2,450
Labor$1,550$1,900
Permits and fees$170$320
Total$3,500$4,700
Save and get a PDF report

Cost breakdown for 400 sq ft in District of Columbia

Part of the jobLowMidpointHighShare
Materials$1,300$2,150$3,00052%
Labor$1,300$1,750$2,15042%
Permits and fees$55$250$4406%
Total$2,650$4,100$5,600100%

District of Columbia metro-by-metro prices

District of Columbia has one metro in our dataset, Washington, so the statewide and metro figures are close. The state figure uses BLS statewide wages, which include rural areas. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Washington, DC$2,550 – $5,400$3,950−4%

Related projects, priced for the District of Columbia

The table prices neighboring jobs at their usual sizes using statewide District of Columbia wages and prices. Against national midpoints, asphalt driveway comes out highest (+19%) and detached garage lowest (+7%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,950 – $9,950+8%
Concrete patio300 sq ft$1,350 – $4,300+8%
Detached garage576 sq ft$30,900 – $62,000+7%
Stamped concrete400 sq ft$3,500 – $8,600+8%
Asphalt driveway600 sq ft$3,550 – $8,900+19%
Gravel driveway1,000 sq ft$2,800 – $11,300+11%

Quality levels and sizes in the District of Columbia

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide District of Columbia wages and prices. The grid prices the same bands at 5 common sizes.

Basic

$2,650 to $3,800

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,500 to $4,700

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,400 to $5,600

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$700 – $1,100$1,000 – $1,400$1,300 – $1,750
12x12 (144 sq ft)$980 – $1,500$1,400 – $1,900$1,750 – $2,300
20x20 (400 sq ft)$2,650 – $3,800$3,500 – $4,700$4,400 – $5,600
24x24 garage floor (576 sq ft)$3,750 – $5,400$5,000 – $6,650$6,250 – $7,850
30x40 foundation (1,200 sq ft)$7,800 – $11,000$10,200 – $13,500$12,700 – $15,900

Add-ons priced for District of Columbia

Extras are quoted nationally and then scaled to District of Columbia by the average of the local wage index (1.09) and goods index (1.07), a factor of 1.08. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$430 – $1,300
Remove old concrete first$860 – $2,600

What cement masons and concrete finishers and the other trades earn in the District of Columbia

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 4 trades drive the labor line for this job, and the weighted ratio against the national wage level is 1.09 for the District of Columbia.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $29.65 an hour, which is 8% above the national $27.41. The middle half of them earn between $27.67 and $34.00 an hour. BLS counts 320 of them working in the state, 4.6 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $24.05 an hour, 6% above the US median of $22.66. The middle half of them earn between $20.80 and $28.41 an hour. About 2,090 work in the state. That is 29.8 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $35.87 an hour, which is 25% above the national $28.78. The middle half of them earn between $31.47 and $41.48 an hour. BLS counts 620 of them working in the state, 8.8 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

For carpenters (47-2031, weighted 10%) the local median is $29.67 an hour, which is in line with the national $29.12. The middle half of them earn between $27.48 and $36.18 an hour. BLS counts 1,540 of them working in the state, 21.9 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

A crew paid at the 75th percentile for cement masons and concrete finishers ($34.00 an hour) would add about $130 to the statewide midpoint; one at the 25th percentile ($27.67) would take off about $60. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 701,920 jobs across the District of Columbia (May 2025), which is 0.5% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$27.67$29.65$34.00$27.411.08state
Construction laborers (47-2061)30%$20.80$24.05$28.41$22.661.06state
Operating engineers and other construction equipment operators (47-2073)10%$31.47$35.87$41.48$28.781.25state
Carpenters (47-2031)10%$27.48$29.67$36.18$29.121.02state
Blended100%1.09

Concrete slab: what moves the price in the District of Columbia

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

District of Columbia seasons and concrete slab

Season matters for concrete slab. For each District of Columbia metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.

Washington has 7 comfortable months (April through June and August through November), with about 42 inches of precipitation a year.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Washington3090427: April through June and August through November

District of Columbia against its neighbors

District of Columbia ranks 11 of 51 (the 50 states plus DC) for concrete slab, where 1 is the most expensive. The costliest is Hawaii at $5,150 and the cheapest Arkansas at $3,350, both for 400 sq ft at the midpoint. District of Columbia sits at $4,100. The five states closest by workforce center are listed below.

States near the District of Columbia, same project and size
StateDistanceRangeMidpointvs. here
Maryland50 miles away$2,450 – $5,200$3,800−7%
Virginia110 miles away$2,350 – $5,050$3,700−10%
Pennsylvania110 miles away$2,500 – $5,300$3,900−5%
Delaware110 miles away$2,400 – $5,050$3,700−10%
New Jersey160 miles away$2,800 – $5,850$4,300+5%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,500 to $4,700 for District of Columbia is attached.

Detailed concrete slab report for District of Columbia, $9

Multi-page report for District of Columbia: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in the District of Columbia: your questions

+How much does it cost to pour a concrete slab in the District of Columbia?

$2,650 to $5,600 for 400 sq ft, using statewide wages and prices. Metro areas inside the District of Columbia can sit above or below that.

+Which city in the District of Columbia is cheapest for concrete slab?

Washington at about $3,950 (midpoint, 400 sq ft).

+Is concrete slab cheaper in the District of Columbia than the US average?

It is 8% more expensive: $4,100 against $3,850 for 400 sq ft at the midpoint.

+What share of the price is labor in the District of Columbia?

About 42% ($1,750). Materials are 52%. Statewide labor for this job is weighted 1.09x the national wage level.

+Does a concrete slab need a permit?

Often yes if it's structural (a garage floor or foundation) and often no for a small at-grade pad. Permit fees run $50-$400 depending on the city (HomeGuide).

+What do cement masons and concrete finishers earn in the District of Columbia?

The BLS statewide median is $29.65 an hour, against $27.41 for the US. The 25th to 75th percentile range is $27.67 to $34.00.

+Where does District of Columbia rank for concrete slab costs?

11th most expensive of 51 (the 50 states plus DC) at the midpoint, $4,100 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete slab work cost in the District of Columbia?

For 400 sq ft, basic work runs $2,650 to $3,800 and premium work $4,400 to $5,600. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+Does the season matter for concrete slab in the District of Columbia?

Yes where winters or summers are hard. Of the District of Columbia metros we cover, Washington has the most comfortable months (7 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add rebar reinforcement" add in the District of Columbia?

$430 to $1,300 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete slab by city in the District of Columbia

Concrete slab: all pricesDistrict of Columbia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.