Stamped concrete cost in the District of Columbia

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$3,500 – $8,600
Per sq ft
$8.60 – $20.50
before permit
Versus US midpoint
+8%
US $5,600
Metros covered
1

District of Columbia prices for stamped concrete: $3,500 to $8,600 for 400 sq ft, or $8.60 to $20.50 per sq ft without the permit. The state midpoint is 8% above the national one. Local wages for cement masons and concrete finishers are $29.65 an hour.

District of Columbia has one metro in our dataset, Washington, so the statewide and metro figures are close. The state figure uses BLS statewide wages, which include rural areas.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in District of Columbia (statewide), standard level

$5,050 to $7,050

About $12 to $17 per sq ft before permits. Labor is about 49% of the bill.

Cost breakdown
PartLowHigh
Materials$2,500$3,250
Labor$2,400$3,500
Permits and fees$150$290
Total$5,050$7,050
Save and get a PDF report

Cost breakdown for 400 sq ft in District of Columbia

Part of the jobLowMidpointHighShare
Materials$1,900$2,900$3,85048%
Labor$1,550$2,950$4,35049%
Permits and fees$55$220$3804%
Total$3,500$6,050$8,600100%

Other District of Columbia jobs that often go with stamped concrete

The table prices neighboring jobs at their usual sizes using statewide District of Columbia wages and prices. Against national midpoints, asphalt driveway comes out highest (+19%) and concrete slab lowest (+8%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,350 – $4,300+8%
Concrete driveway600 sq ft$3,950 – $9,950+8%
Paver patio300 sq ft$3,250 – $5,900+8%
Concrete slab400 sq ft$2,650 – $5,600+8%
Asphalt driveway600 sq ft$3,550 – $8,900+19%
Gravel driveway1,000 sq ft$2,800 – $11,300+11%

Add-ons priced for District of Columbia

Extras are quoted nationally and then scaled to District of Columbia by the average of the local wage index (1.09) and goods index (1.07), a factor of 1.08. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add a vapor barrier$220 – $430

District of Columbia labor market for stamped concrete

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 3 trades drive the labor line for this job, and the weighted ratio against the national wage level is 1.09 for the District of Columbia.

For cement masons and concrete finishers (47-2051, weighted 60%) the local median is $29.65 an hour, which is 8% above the national $27.41. The middle half of them earn between $27.67 and $34.00 an hour. BLS counts 320 of them working in the state, 4.6 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $24.05 an hour, 6% above the US median of $22.66. The middle half of them earn between $20.80 and $28.41 an hour. About 2,090 work in the state. That is 29.8 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $35.87 an hour, which is 25% above the national $28.78. The middle half of them earn between $31.47 and $41.48 an hour. BLS counts 620 of them working in the state, 8.8 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

A crew paid at the 75th percentile for cement masons and concrete finishers ($34.00 an hour) would add about $260 to the statewide midpoint; one at the 25th percentile ($27.67) would take off about $120. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 701,920 jobs across the District of Columbia (May 2025), which is 0.5% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$27.67$29.65$34.00$27.411.08state
Construction laborers (47-2061)30%$20.80$24.05$28.41$22.661.06state
Operating engineers and other construction equipment operators (47-2073)10%$31.47$35.87$41.48$28.781.25state
Blended100%1.09

How District of Columbia compares with nearby states

District of Columbia ranks 11 of 51 (the 50 states plus DC) for stamped concrete, where 1 is the most expensive. The costliest is Hawaii at $7,800 and the cheapest Arkansas at $4,850, both for 400 sq ft at the midpoint. District of Columbia sits at $6,050. The five states closest by workforce center are listed below.

States near the District of Columbia, same project and size
StateDistanceRangeMidpointvs. here
Maryland50 miles away$3,250 – $7,850$5,550−8%
Virginia110 miles away$3,150 – $7,600$5,350−11%
Pennsylvania110 miles away$3,350 – $8,150$5,750−5%
Delaware110 miles away$3,150 – $7,750$5,450−10%
New Jersey160 miles away$3,650 – $9,050$6,350+5%

District of Columbia seasons and stamped concrete

Season matters for stamped concrete. For each District of Columbia metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.

Washington has 7 comfortable months (April through June and August through November), with about 42 inches of precipitation a year.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Washington3090427: April through June and August through November

Quality levels and sizes in the District of Columbia

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide District of Columbia wages and prices. The grid prices the same bands at 3 common sizes.

Basic

$3,500 to $5,550

Basic pattern, one integral color

Standard

$5,050 to $7,050

Two-tone color release and a border

Premium

$6,550 to $8,600

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,800 – $2,850$2,600 – $3,650$3,400 – $4,500
20x20 patio (400 sq ft)$3,500 – $5,550$5,050 – $7,050$6,550 – $8,600
2-car driveway (600 sq ft)$5,200 – $8,200$7,450 – $10,400$9,700 – $12,700

Stamped concrete: what moves the price in the District of Columbia

  • Pattern and color

    Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

  • Sealing and vapor barrier

    Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

District of Columbia metro-by-metro prices

District of Columbia has one metro in our dataset, Washington, so the statewide and metro figures are close. The state figure uses BLS statewide wages, which include rural areas. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Washington, DC$3,350 – $8,250$5,800−4%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,050 to $7,050 for District of Columbia is attached.

A detailed PDF report of this estimate, $9

Multi-page report for District of Columbia: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in the District of Columbia: your questions

+How much does it cost to pour stamped concrete in the District of Columbia?

$3,500 to $8,600 for 400 sq ft, using statewide wages and prices. Metro areas inside the District of Columbia can sit above or below that.

+Which city in the District of Columbia is cheapest for stamped concrete?

Washington at about $5,800 (midpoint, 400 sq ft).

+Is stamped concrete cheaper in the District of Columbia than the US average?

It is 8% more expensive: $6,050 against $5,600 for 400 sq ft at the midpoint.

+What share of the price is labor in the District of Columbia?

About 49% ($2,950). Materials are 48%. Statewide labor for this job is weighted 1.09x the national wage level.

+What do cement masons and concrete finishers earn in the District of Columbia?

The BLS statewide median is $29.65 an hour, against $27.41 for the US. The 25th to 75th percentile range is $27.67 to $34.00.

+Where does District of Columbia rank for stamped concrete costs?

11th most expensive of 51 (the 50 states plus DC) at the midpoint, $6,050 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium stamped concrete work cost in the District of Columbia?

For 400 sq ft, basic work runs $3,500 to $5,550 and premium work $6,550 to $8,600. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+Does the season matter for stamped concrete in the District of Columbia?

Yes where winters or summers are hard. Of the District of Columbia metros we cover, Washington has the most comfortable months (7 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add a vapor barrier" add in the District of Columbia?

$220 to $430 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Stamped concrete by city in the District of Columbia

Stamped concrete: all pricesDistrict of Columbia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.