Stamped concrete cost in Washington, DC
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $3,350 – $8,250
- Per sq ft
- $8.30 – $19.50
- before permit
- Versus US midpoint
- +4%
- US $5,600
- Rank of 300 metros
- #85
- 1 = most expensive
Stamped concrete in Washington, DC usually costs $3,350 to $8,250 for 400 sq ft. That works out to about $8.30 to $19.50 per sq ft before permits. Compared with the national midpoint that is $200 more. Building materials run about 5% above the US average here (BEA goods price index 104.8).
Estimate your stamped concrete cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Washington, DC, standard level
$4,850 to $6,750
About $11.50 to $16 per sq ft before permits. Labor is about 47% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $2,450 | $3,200 |
| Labor | $2,200 | $3,300 |
| Permits and fees | $150 | $280 |
| Total | $4,850 | $6,750 |
Cost breakdown for 400 sq ft in Washington, DC
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,900 | $2,850 | $3,750 | 49% |
| Labor | $1,450 | $2,750 | $4,100 | 47% |
| Permits and fees | $55 | $220 | $380 | 4% |
| Total | $3,350 | $5,800 | $8,250 | 100% |
Why Washington prices look the way they do
Labor is 47% of the midpoint bill here, against 48% nationally. The mix of trades behind this job is cement masons and concrete finishers (60%), construction laborers (30%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Washington the blended ratio comes out at 1.02.
Materials are scaled with BEA's regional price parity for goods. Washington is at 104.8 against 100 for the US, so a materials line of $2,700 nationally becomes $2,850 here (midpoint, 400 sq ft). Permits follow the all-items index of 108.9: $55 to $380.
Specs and site conditions that change a Washington bid
Pattern and color
Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.
Specialist labor
Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.
Sealing and vapor barrier
Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).
Pick a size, pick a tier: stamped concrete pricing in Washington
The cited range is split into basic, standard and premium bands, then scaled to Washington. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).
Basic
$3,350 to $5,300
Basic pattern, one integral color
Standard
$4,850 to $6,750
Two-tone color release and a border
Premium
$6,300 to $8,250
Multi-color, hand-detailed, sealed to a high finish
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x20 patio (200 sq ft) | $1,700 – $2,750 | $2,500 – $3,550 | $3,250 – $4,300 |
| 20x20 patio (400 sq ft) | $3,350 – $5,300 | $4,850 – $6,750 | $6,300 – $8,250 |
| 2-car driveway (600 sq ft) | $5,000 – $7,900 | $7,150 – $10,000 | $9,300 – $12,200 |
What local crews earn in Washington
The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Washington the blend is 1.02.
Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $28.05 an hour, in line with the US median of $27.41. The middle half of them earn between $23.42 and $30.30 an hour. About 2,810 work in the metro. That is 9.0 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.
For construction laborers (47-2061, weighted 30%) the local median is $22.80 an hour, which is in line with the national $22.66. The middle half of them earn between $20.07 and $27.05 an hour. BLS counts 17,710 of them working in the area, 56.5 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $29.64 an hour, in line with the US median of $28.78. The middle half of them earn between $26.33 and $35.07 an hour. About 6,450 work in the metro. That is 20.6 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.
A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $130 to the midpoint estimate; the 25th percentile takes off about $270. That is a swing of roughly 4.7% to 2.3% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Washington-Arlington-Alexandria has 3,136,190 jobs in total (BLS, May 2025), ranking 6th by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 60% | $23.42 | $28.05 | $30.30 | $27.41 | 1.02 | metro |
| Construction laborers (47-2061) | 30% | $20.07 | $22.80 | $27.05 | $22.66 | 1.01 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $26.33 | $29.64 | $35.07 | $28.78 | 1.03 | metro |
| Blended | 100% | 1.02 | |||||
Washington against nearby metros and the rest of the District of Columbia
Of the five closest metros, all are cheaper than Washington. Winchester is the lowest at about $5,100 (midpoint, 400 sq ft), 60 miles away.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Washington, DCthis page | $3,350 – $8,250 | $5,800 | |
| Hagerstown, MD55 miles | $3,000 – $7,250 | $5,100 | −12% |
| Baltimore, MD60 miles | $3,200 – $7,850 | $5,500 | −5% |
| Winchester, VA60 miles | $3,000 – $7,250 | $5,100 | −12% |
| Lexington Park, MD65 miles | $3,150 – $7,700 | $5,450 | −6% |
| Chambersburg, PA75 miles | $3,150 – $7,700 | $5,450 | −6% |
| District of Columbia (statewide) | $3,500 – $8,600 | $6,050 | +4% |
| United States | $3,250 – $7,950 | $5,600 | −3% |
Out of the 300 metros we cover, Washington ranks #85 for the cost of this job (#1 is the most expensive). Statewide, Washington is 4% below the District of Columbia figure.
Washington is the only District of Columbia metro we cover, so the statewide page is the only in-state comparison. It uses statewide wages, which include rural areas.
Metros of a similar size
Big cities and small ones price differently, so here is Washington against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Houston, TX | 3,289,720 jobs | $3,050 – $7,300 | $5,200 | −11% |
| Philadelphia, PA | 2,897,830 jobs | $3,350 – $8,250 | $5,800 | level |
| Dallas, TX | 4,049,800 jobs | $3,150 – $7,600 | $5,350 | −8% |
| Atlanta, GA | 2,889,670 jobs | $3,050 – $7,350 | $5,200 | −11% |
Planning more than one job in Washington?
Jobs that often go together with stamped concrete are priced below at their usual sizes, using the same Washington wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (+5%) and concrete driveway lowest (+3%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete patio | 300 sq ft | $1,300 – $4,150 | +4% |
| Concrete driveway | 600 sq ft | $3,750 – $9,450 | +3% |
| Paver patio | 300 sq ft | $3,100 – $5,600 | +3% |
| Concrete slab | 400 sq ft | $2,550 – $5,400 | +4% |
| Asphalt driveway | 600 sq ft | $3,200 – $7,800 | +5% |
| Gravel driveway | 1,000 sq ft | $2,600 – $10,600 | +3% |
Washington weather and the stamped concrete calendar
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Washington Reagan Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.
For pouring concrete, the comfortable months in Washington are April through June and August through November: 7 of 12. Outside them, January, February, March and December have an average overnight low of 40°F or below, and July has an average daytime high of 90°F or more.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Heat matters for concrete as well. With average highs of 90°F or more in July, crews often start early, wet the base and plan for faster set times.
Washington gets about 42 inches of precipitation in a normal year, including roughly 14 inches of snow. The wettest months are May, June and July (4.3 inches in July). Inside the workable window, April and November are the driest, at 3.2 and 2.9 inches. The station averages about 40 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 45 | 30 | 2.9 | Cold |
| Feb | 48 | 32 | 2.6 | Cold |
| Mar | 57 | 39 | 3.5 | Cold |
| Apr | 68 | 48 | 3.2 | Workable |
| May | 77 | 58 | 3.9 | Workable |
| Jun | 85 | 68 | 4.2 | Workable |
| Jul | 90 | 72 | 4.3 | Hot |
| Aug | 88 | 71 | 3.3 | Workable |
| Sep | 81 | 64 | 3.9 | Workable |
| Oct | 69 | 52 | 3.7 | Workable |
| Nov | 58 | 42 | 2.9 | Workable |
| Dec | 49 | 35 | 3.4 | Cold |
Add-ons priced for Washington
Add-ons start from national price ranges and are scaled by 1.03 for Washington, which is the average of the area's wage index (1.02) and goods price index (1.05). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add a vapor barrier | $210 – $410 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,850 to $6,750 for Washington, DC is attached.
Detailed stamped concrete report for Washington, DC, $9
The report lays out the stamped concrete numbers for Washington, DC line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Stamped concrete in Washington: your questions
+How much does it cost to pour stamped concrete in Washington?
For 400 sq ft, expect $3,350 to $8,250 in the Washington area. A standard-spec job lands at $4,850 to $6,750. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for stamped concrete in Washington?
About $8.30 to $19.50 per sq ft for materials and labor, plus $55 to $380 for the permit if one is needed. The US range is $8 to $19.
+Is stamped concrete cheaper in Washington or Hagerstown?
Hagerstown is 55 miles away. The midpoint for 400 sq ft there is $5,100, which is 12% less than Washington ($5,800). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Washington?
About 47% at the midpoint, or $2,750 out of $5,800. Materials are 49% and permits 4%. Nationally, labor is 48%.
+What would 20x20 patio (400 sq ft) cost in Washington?
$3,350 to $8,250. Pick a different size in the estimator above to get your own number.
+Does stamped concrete need a permit in Washington?
Often, but rules are set by your city or county building office, so call before you hire. Budget $55 to $380 for fees in the Washington area (our national range of $50 to $350 scaled by the local price level).
+Is Washington expensive for stamped concrete compared with the rest of District of Columbia?
Washington is 4% below the District of Columbia statewide estimate ($6,050 at the midpoint).
+What do cement masons and concrete finishers earn in Washington?
The BLS median is $28.05 an hour in the Washington area, compared with $27.41 nationally. The 25th to 75th percentile range is $23.42 to $30.30.
+What do basic and premium stamped concrete work cost in Washington?
For 400 sq ft, basic work runs $3,350 to $5,300 and premium work $6,300 to $8,250. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.
+When is the best time to pour stamped concrete in Washington?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through June and August through November. April and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add a vapor barrier" add in Washington?
$210 to $410 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Stamped concrete near Washington
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.