Stamped concrete cost in Hagerstown, MD
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $3,000 – $7,250
- Per sq ft
- $7.35 – $17.50
- before permit
- Versus US midpoint
- −9%
- US $5,600
- Rank of 300 metros
- #215
- 1 = most expensive
Local price for stamped concrete in the Hagerstown area: $3,000 to $7,250 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 9% lower than the US figure. Cement masons and concrete finishers earn a median of $22.95 an hour in the Hagerstown area, 16% below the US median of $27.41.
Estimate your stamped concrete cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Hagerstown, MD, standard level
$4,250 to $5,950
About $10.50 to $14.50 per sq ft before permits. Labor is about 45% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $2,250 | $2,950 |
| Labor | $1,850 | $2,750 |
| Permits and fees | $130 | $240 |
| Total | $4,250 | $5,950 |
Cost breakdown for 400 sq ft in Hagerstown, MD
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,750 | $2,600 | $3,450 | 51% |
| Labor | $1,200 | $2,300 | $3,450 | 45% |
| Permits and fees | $45 | $190 | $330 | 4% |
| Total | $3,000 | $5,100 | $7,250 | 100% |
What is behind the Hagerstown number
Labor is 45% of the midpoint bill here, against 48% nationally. The mix of trades behind this job is cement masons and concrete finishers (60%), construction laborers (30%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Hagerstown the blended ratio comes out at 0.86.
Materials are scaled with BEA's regional price parity for goods. Hagerstown is at 96.4 against 100 for the US, so a materials line of $2,700 nationally becomes $2,600 here (midpoint, 400 sq ft). Permits follow the all-items index of 94.2: $45 to $330.
Add-ons priced for Hagerstown
Add-ons start from national price ranges and are scaled by 0.91 for Hagerstown, which is the average of the area's wage index (0.86) and goods price index (0.96). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add a vapor barrier | $180 – $360 |
What nearby projects cost in Hagerstown
Jobs that often go together with stamped concrete are priced below at their usual sizes, using the same Hagerstown wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−4%) and concrete driveway lowest (−10%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete patio | 300 sq ft | $1,150 – $3,650 | −9% |
| Concrete driveway | 600 sq ft | $3,300 – $8,250 | −10% |
| Paver patio | 300 sq ft | $2,800 – $5,100 | −7% |
| Concrete slab | 400 sq ft | $2,250 – $4,800 | −8% |
| Asphalt driveway | 600 sq ft | $2,950 – $7,100 | −4% |
| Gravel driveway | 1,000 sq ft | $2,300 – $9,400 | −8% |
Why two Hagerstown quotes can differ
Sealing and vapor barrier
Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).
Not included
These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.
Pattern and color
Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.
Pick a size, pick a tier: stamped concrete pricing in Hagerstown
The cited range is split into basic, standard and premium bands, then scaled to Hagerstown. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).
Basic
$3,000 to $4,700
Basic pattern, one integral color
Standard
$4,250 to $5,950
Two-tone color release and a border
Premium
$5,550 to $7,250
Multi-color, hand-detailed, sealed to a high finish
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x20 patio (200 sq ft) | $1,500 – $2,400 | $2,200 – $3,100 | $2,900 – $3,800 |
| 20x20 patio (400 sq ft) | $3,000 – $4,700 | $4,250 – $5,950 | $5,550 – $7,250 |
| 2-car driveway (600 sq ft) | $4,450 – $6,950 | $6,350 – $8,800 | $8,200 – $10,700 |
Who does the work: Hagerstown trade wages
The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Hagerstown the blend is 0.86.
Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $22.95 an hour, 16% below the US median of $27.41. The middle half of them earn between $20.15 and $26.16 an hour. About 80 work in the metro. That is 7.5 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.
For construction laborers (47-2061, weighted 30%) the local median is $20.59 an hour, which is 9% below the national $22.66. The middle half of them earn between $17.55 and $23.61 an hour. BLS counts 560 of them working in the area, 52.3 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $24.43 an hour, 15% below the US median of $28.78. The middle half of them earn between $21.90 and $29.53 an hour. About 380 work in the metro. That is 35.5 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.
A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $190 to the midpoint estimate; the 25th percentile takes off about $170. That is a swing of roughly 3.2% to 3.7% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Hagerstown-Martinsburg has 107,170 jobs in total (BLS, May 2025), ranking 195th by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 60% | $20.15 | $22.95 | $26.16 | $27.41 | 0.84 | metro |
| Construction laborers (47-2061) | 30% | $17.55 | $20.59 | $23.61 | $22.66 | 0.91 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $21.90 | $24.43 | $29.53 | $28.78 | 0.85 | metro |
| Blended | 100% | 0.86 | |||||
Is Hagerstown cheap or dear? The local comparison
Same job, same size (400 sq ft), priced for the nearest metros. Washington is the priciest of the group at $5,800. Winchester is the cheapest at $5,100.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Hagerstown, MDthis page | $3,000 – $7,250 | $5,100 | |
| Chambersburg, PA30 miles | $3,150 – $7,700 | $5,450 | +6% |
| Winchester, VA30 miles | $3,000 – $7,250 | $5,100 | level |
| Washington, DC55 miles | $3,350 – $8,250 | $5,800 | +13% |
| Altoona, PA65 miles | $3,150 – $7,650 | $5,400 | +6% |
| York, PA70 miles | $3,350 – $8,150 | $5,750 | +12% |
| Maryland (statewide) | $3,250 – $7,850 | $5,550 | +8% |
| United States | $3,250 – $7,950 | $5,600 | +10% |
Out of the 300 metros we cover, Hagerstown ranks #215 for the cost of this job (#1 is the most expensive). Statewide, Hagerstown is 8% below the Maryland figure.
Elsewhere in Maryland
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Baltimore, MD | 1,356,680 jobs | $3,200 – $7,850 | $5,500 | +8% |
| Lexington Park, MD | 70,650 jobs | $3,150 – $7,700 | $5,450 | +6% |
Metros of a similar size
Big cities and small ones price differently, so here is Hagerstown against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Columbia, MO | 107,680 jobs | $3,250 – $8,000 | $5,650 | +10% |
| Champaign, IL | 105,500 jobs | $3,600 – $8,950 | $6,300 | +23% |
| Bend, OR | 108,240 jobs | $3,550 – $8,700 | $6,150 | +20% |
| St. Cloud, MN | 103,920 jobs | $3,350 – $8,300 | $5,850 | +14% |
The best months for stamped concrete in Hagerstown
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Hagerstown 1 E (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.
For pouring concrete, the comfortable months in Hagerstown are April through October: 7 of 12. Outside them, January, February, March, November and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Hagerstown gets about 44 inches of precipitation in a normal year. The wettest months are March, May and September (4.8 inches in September). Inside the workable window, June and October are the driest, at 3.4 and 3.4 inches. The station averages about 32 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 40 | 22 | 3.2 | Cold |
| Feb | 44 | 25 | 2.7 | Cold |
| Mar | 53 | 32 | 3.9 | Cold |
| Apr | 65 | 41 | 3.9 | Workable |
| May | 74 | 53 | 4.3 | Workable |
| Jun | 83 | 62 | 3.4 | Workable |
| Jul | 86 | 66 | 3.7 | Workable |
| Aug | 85 | 65 | 3.7 | Workable |
| Sep | 78 | 56 | 4.8 | Workable |
| Oct | 66 | 45 | 3.4 | Workable |
| Nov | 54 | 34 | 2.9 | Cold |
| Dec | 44 | 27 | 3.7 | Cold |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,250 to $5,950 for Hagerstown, MD is attached.
Detailed stamped concrete report for Hagerstown, MD, $9
The report lays out the stamped concrete numbers for Hagerstown, MD line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Stamped concrete in Hagerstown: your questions
+How much does it cost to pour stamped concrete in Hagerstown?
For 400 sq ft, expect $3,000 to $7,250 in the Hagerstown area. A standard-spec job lands at $4,250 to $5,950. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for stamped concrete in Hagerstown?
About $7.35 to $17.50 per sq ft for materials and labor, plus $45 to $330 for the permit if one is needed. The US range is $8 to $19.
+Is stamped concrete cheaper in Hagerstown or Chambersburg?
Chambersburg is 30 miles away. The midpoint for 400 sq ft there is $5,450, which is 6% more than Hagerstown ($5,100). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Hagerstown?
About 45% at the midpoint, or $2,300 out of $5,100. Materials are 51% and permits 4%. Nationally, labor is 48%.
+What would 20x20 patio (400 sq ft) cost in Hagerstown?
$3,000 to $7,250. Pick a different size in the estimator above to get your own number.
+Does stamped concrete need a permit in Hagerstown?
Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $330 for fees in the Hagerstown area (our national range of $50 to $350 scaled by the local price level).
+Is Hagerstown expensive for stamped concrete compared with the rest of Maryland?
Hagerstown is 8% below the Maryland statewide estimate ($5,550 at the midpoint). We cover 3 metros in Maryland; see the state page to compare them.
+What do cement masons and concrete finishers earn in Hagerstown?
The BLS median is $22.95 an hour in the Hagerstown area, compared with $27.41 nationally. The 25th to 75th percentile range is $20.15 to $26.16.
+What do basic and premium stamped concrete work cost in Hagerstown?
For 400 sq ft, basic work runs $3,000 to $4,700 and premium work $5,550 to $7,250. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.
+When is the best time to pour stamped concrete in Hagerstown?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. June and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add a vapor barrier" add in Hagerstown?
$180 to $360 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Stamped concrete near Hagerstown
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.