Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $2,400 – $5,100
- Per sq ft
- $5.85 – $11.50
- before permit
- Versus US midpoint
- −2%
- US $3,850
- Rank of 300 metros
- #144
- 1 = most expensive
If you want to pour a concrete slab in Lexington Park, plan on $2,400 to $5,100 for 400 sq ft, all in. Per sq ft, that is $5.85 to $11.50 for materials and labor, with the permit on top. The local midpoint lands close to the national one. Cement masons and concrete finishers earn a median of $24.98 an hour in the Lexington Park area, 9% below the US median of $27.41.
Estimate your concrete slab cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Lexington Park, MD, standard level
$3,200 to $4,300
About $7.60 to $9.95 per sq ft before permits. Labor is about 41% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,650 | $2,300 |
| Labor | $1,350 | $1,650 |
| Permits and fees | $160 | $300 |
| Total | $3,200 | $4,300 |
Cost breakdown for 400 sq ft in Lexington Park, MD
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,200 | $2,000 | $2,800 | 53% |
| Labor | $1,150 | $1,500 | $1,900 | 41% |
| Permits and fees | $50 | $230 | $400 | 6% |
| Total | $2,400 | $3,750 | $5,100 | 100% |
What is behind the Lexington Park number
Labor is 41% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Lexington Park the blended ratio comes out at 0.95. BLS does not publish this trade for the metro, so we used the Maryland statewide median.
On the materials line, the BEA goods price index for the Lexington Park metro is 99.7 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,000, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (100.8) and land at $50 to $400.
Data note: 50% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in Lexington Park. The wage table below marks each row.
Lexington Park labor market for concrete slab
Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Lexington Park is 0.95 times the national level.
Cement masons and concrete finishers (47-2051) carry 50% of the labor weighting. BLS does not publish this trade for the Lexington Park metro, so we used the Maryland statewide median: $24.98 an hour against $27.41 for the US. The middle half of them earn between $22.75 and $28.44 an hour.
Construction laborers (47-2061), 30% of the weighting: a median of $21.88 an hour, 3% below the US median of $22.66. The middle half of them earn between $18.05 and $23.85 an hour. About 450 work in the metro. That is 63.7 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $29.29 an hour, which is in line with the national $28.78. The middle half of them earn between $24.94 and $30.23 an hour. BLS counts 230 of them working in the area, 32.6 for every 10,000 jobs (US: 30.7), so the local bench is about average.
For carpenters (47-2031, weighted 10%) the local median is $30.23 an hour, which is 4% above the national $29.12. The middle half of them earn between $26.36 and $35.38 an hour. BLS counts 210 of them working in the area, 29.7 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($28.44 an hour) instead of the median, the labor line grows by about $100. At the 25th percentile ($22.75) it shrinks by about $65. The total moves by 2.7% or 1.7%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 70,650 jobs in the Lexington Park area. That makes it the 259th largest of the 300 metros we cover, with 0.05% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $22.75 | $24.98 | $28.44 | $27.41 | 0.91 | state |
| Construction laborers (47-2061) | 30% | $18.05 | $21.88 | $23.85 | $22.66 | 0.97 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $24.94 | $29.29 | $30.23 | $28.78 | 1.02 | metro |
| Carpenters (47-2031) | 10% | $26.36 | $30.23 | $35.38 | $29.12 | 1.04 | metro |
| Blended | 100% | 0.95 | |||||
Specs and site conditions that change a Lexington Park bid
Small-job minimums
Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.
Finish
A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.
Thickness and mix
A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).
Extras that change the Lexington Park total
Extras are quoted nationally and then scaled to Lexington Park by the average of the local wage index (0.95) and goods index (1.00), a factor of 0.97. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $390 – $1,150 |
| Remove old concrete first | $780 – $2,350 |
Lexington Park: what basic, standard and premium work costs
Three bands are cut from the same cited range and localized for Lexington Park wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.
Basic
$2,400 to $3,450
4-inch broom-finish slab, light mesh, easy truck access
Standard
$3,200 to $4,300
4-5 inch slab with rebar or heavier mesh and standard base prep
Premium
$4,000 to $5,100
6-inch slab, heavy reinforcement, thick base, pump truck or tight access
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 pad (100 sq ft) | $630 – $1,000 | $920 – $1,300 | $1,200 – $1,600 |
| 12x12 (144 sq ft) | $890 – $1,350 | $1,250 – $1,750 | $1,600 – $2,100 |
| 20x20 (400 sq ft) | $2,400 – $3,450 | $3,200 – $4,300 | $4,000 – $5,100 |
| 24x24 garage floor (576 sq ft) | $3,400 – $4,900 | $4,550 – $6,050 | $5,650 – $7,150 |
| 30x40 foundation (1,200 sq ft) | $7,050 – $10,000 | $9,300 – $12,300 | $11,500 – $14,500 |
Climate in Lexington Park: timing your concrete slab job
We use NOAA's 1991-2020 climate normals for Patuxent River Nas (5 miles from the city center). These are 30-year monthly averages, not forecasts.
April through November is the stretch where pouring concrete runs into the fewest weather problems in Lexington Park (8 of 12 months). January, February, March and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Lexington Park gets about 45 inches of precipitation in a normal year, including roughly 13 inches of snow. The wettest months are June, July and August (4.7 inches in August). Inside the workable window, May and November are the driest, at 3.7 and 3.1 inches. The station averages about 26 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 45 | 30 | 2.9 | Cold |
| Feb | 48 | 31 | 2.8 | Cold |
| Mar | 55 | 37 | 4.0 | Cold |
| Apr | 66 | 47 | 3.7 | Workable |
| May | 75 | 57 | 3.7 | Workable |
| Jun | 83 | 66 | 4.3 | Workable |
| Jul | 87 | 71 | 4.5 | Workable |
| Aug | 85 | 69 | 4.7 | Workable |
| Sep | 79 | 63 | 4.2 | Workable |
| Oct | 69 | 52 | 4.0 | Workable |
| Nov | 58 | 41 | 3.1 | Workable |
| Dec | 50 | 34 | 3.5 | Cold |
How Lexington Park compares
Same job, same size (400 sq ft), priced for the nearest metros. Washington is the priciest of the group at $3,950. Richmond is the cheapest at $3,500.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Lexington Park, MDthis page | $2,400 – $5,100 | $3,750 | |
| Washington, DC65 miles | $2,550 – $5,400 | $3,950 | +6% |
| Baltimore, MD70 miles | $2,450 – $5,200 | $3,800 | +2% |
| Dover, DE75 miles | $2,300 – $4,950 | $3,600 | −3% |
| Richmond, VA80 miles | $2,250 – $4,800 | $3,500 | −6% |
| Virginia Beach, VA100 miles | $2,250 – $4,800 | $3,500 | −6% |
| Maryland (statewide) | $2,450 – $5,200 | $3,800 | +2% |
| United States | $2,450 – $5,200 | $3,850 | +2% |
Across 300 US metros, Lexington Park comes in at #144 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Lexington Park is 2% below the Maryland figure.
Other Maryland metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Baltimore, MD | 1,356,680 jobs | $2,450 – $5,200 | $3,800 | +2% |
| Hagerstown, MD | 107,170 jobs | $2,250 – $4,800 | $3,550 | −6% |
Cities with a workforce like Lexington Park's
Big cities and small ones price differently, so here is Lexington Park against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Bismarck, ND | 71,270 jobs | $2,400 – $5,050 | $3,750 | level |
| Janesville, WI | 69,870 jobs | $2,700 – $5,550 | $4,100 | +10% |
| Redding, CA | 71,550 jobs | $2,700 – $5,650 | $4,150 | +11% |
| Wausau, WI | 69,530 jobs | $2,500 – $5,200 | $3,850 | +3% |
What nearby projects cost in Lexington Park
Because every project leans on different trades, Lexington Park's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs +2% and concrete driveway −3%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $3,550 – $8,850 | −3% |
| Concrete patio | 300 sq ft | $1,250 – $3,900 | −3% |
| Detached garage | 576 sq ft | $28,900 – $58,100 | level |
| Stamped concrete | 400 sq ft | $3,150 – $7,700 | −3% |
| Asphalt driveway | 600 sq ft | $3,100 – $7,550 | +2% |
| Gravel driveway | 1,000 sq ft | $2,500 – $10,100 | −1% |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,200 to $4,300 for Lexington Park, MD is attached.
Take this estimate with you: PDF report, $9
Multi-page report for Lexington Park, MD: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete slab in Lexington Park: your questions
+How much does it cost to pour a concrete slab in Lexington Park?
For 400 sq ft, expect $2,400 to $5,100 in the Lexington Park area. A standard-spec job lands at $3,200 to $4,300. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete slab in Lexington Park?
About $5.85 to $11.50 per sq ft for materials and labor, plus $50 to $400 for the permit if one is needed. The US range is $6 to $12.
+Is concrete slab cheaper in Lexington Park or Washington?
Washington is 65 miles away. The midpoint for 400 sq ft there is $3,950, which is 6% more than Lexington Park ($3,750). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Lexington Park?
About 41% at the midpoint, or $1,500 out of $3,750. Materials are 53% and permits 6%. Nationally, labor is 42%.
+What would 20x20 (400 sq ft) cost in Lexington Park?
$2,400 to $5,100. Pick a different size in the estimator above to get your own number.
+Does concrete slab need a permit in Lexington Park?
Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $400 for fees in the Lexington Park area (our national range of $50 to $400 scaled by the local price level).
+Is Lexington Park expensive for concrete slab compared with the rest of Maryland?
Lexington Park is 2% below the Maryland statewide estimate ($3,800 at the midpoint). We cover 3 metros in Maryland; see the state page to compare them.
+What do cement masons and concrete finishers earn in Lexington Park?
BLS has no published metro figure here, so we use the statewide median of $24.98 an hour, compared with $27.41 nationally. The 25th to 75th percentile range is $22.75 to $28.44.
+What do basic and premium concrete slab work cost in Lexington Park?
For 400 sq ft, basic work runs $2,400 to $3,450 and premium work $4,000 to $5,100. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.
+When is the best time to pour a concrete slab in Lexington Park?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through November. May and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Lexington Park?
$390 to $1,150 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete slab near Lexington Park
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Slab Cost? (2026) (accessed November 4, 2026)
- Estimators.us: Concrete Slab Cost in 2026 | $6-$12/Sq Ft Guide (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024