Skip to content
CostLocal

Concrete slab cost in St. Louis, MO

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,750 – $5,650
Per sq ft
$6.70 – $13
before permit
Versus US midpoint
+9%
US $3,850
Rank of 300 metros
#32
1 = most expensive

St. Louis homeowners pay roughly $2,750 to $5,650 to pour a concrete slab at 400 sq ft, or $6.70 to $13 per sq ft (permit not included). Against the US midpoint, St. Louis is 9% higher. Cement masons and concrete finishers earn a median of $31.09 an hour in the St. Louis area, 13% above the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in St. Louis, MO, standard level

$3,600 to $4,750

About $8.65 to $11 per sq ft before permits. Labor is about 47% of the bill.

Cost breakdown
PartLowHigh
Materials$1,700$2,300
Labor$1,750$2,150
Permits and fees$150$280
Total$3,600$4,750
Save and get a PDF report

Cost breakdown for 400 sq ft in St. Louis, MO

Part of the jobLowMidpointHighShare
Materials$1,200$2,000$2,80048%
Labor$1,500$1,950$2,45047%
Permits and fees$50$210$3805%
Total$2,750$4,200$5,650100%

Why St. Louis prices look the way they do

Labor is 47% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In St. Louis the blended ratio comes out at 1.23.

On the materials line, the BEA goods price index for the St. Louis metro is 100.0 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,000, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (95.1) and land at $50 to $380.

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for St. Louis is 1.23 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $31.09 an hour, which is 13% above the national $27.41. The middle half of them earn between $27.37 and $39.47 an hour. BLS counts 2,550 of them working in the area, 19.0 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $31.01 an hour, 37% above the US median of $22.66. The middle half of them earn between $23.00 and $39.22 an hour. About 8,670 work in the metro. That is 64.6 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $39.56 an hour, which is 37% above the national $28.78. The middle half of them earn between $28.17 and $45.31 an hour. BLS counts 4,190 of them working in the area, 31.2 for every 10,000 jobs (US: 30.7), so the local bench is about average.

For carpenters (47-2031, weighted 10%) the local median is $34.13 an hour, which is 17% above the national $29.12. The middle half of them earn between $25.32 and $44.28 an hour. BLS counts 7,210 of them working in the area, 53.8 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($39.47 an hour) instead of the median, the labor line grows by about $240. At the 25th percentile ($27.37) it shrinks by about $110. The total moves by 5.8% or 2.6%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 1,341,320 jobs in the St. Louis area. That makes it the 23rd largest of the 300 metros we cover, with 0.86% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$27.37$31.09$39.47$27.411.13metro
Construction laborers (47-2061)30%$23.00$31.01$39.22$22.661.37metro
Operating engineers and other construction equipment operators (47-2073)10%$28.17$39.56$45.31$28.781.37metro
Carpenters (47-2031)10%$25.32$34.13$44.28$29.121.17metro
Blended100%1.23

Concrete slab: what moves the price in St. Louis

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

What nearby projects cost in St. Louis

Because every project leans on different trades, St. Louis's wage level does not move all prices equally. Against the US midpoint, gravel driveway runs +18% and detached garage +10%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$4,150 – $10,700+16%
Concrete patio300 sq ft$1,350 – $4,500+12%
Detached garage576 sq ft$31,800 – $63,800+10%
Stamped concrete400 sq ft$3,550 – $8,850+11%
Asphalt driveway600 sq ft$3,450 – $8,700+16%
Gravel driveway1,000 sq ft$3,000 – $12,000+18%

When to schedule concrete slab in St. Louis

We use NOAA's 1991-2020 climate normals for St Louis Sci Ctr (in the city). These are 30-year monthly averages, not forecasts.

April through June and August through October are the stretches where pouring concrete runs into the fewest weather problems in St. Louis (6 of 12 months). January, February, March, November and December have an average overnight low of 40°F or below; July has an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July, crews often start early, wet the base and plan for faster set times.

St. Louis gets about 44 inches of precipitation in a normal year. The wettest months are April, May and June (4.9 inches in May). Inside the workable window, September and October are the driest, at 3.4 and 3.2 inches. The station averages about 47 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, St Louis Sci Ctr (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan41252.7Cold
Feb46282.3Cold
Mar56383.6Cold
Apr68484.8Workable
May77594.9Workable
Jun86674.7Workable
Jul90724.2Hot
Aug89703.8Workable
Sep82623.4Workable
Oct70503.2Workable
Nov56393.7Cold
Dec45302.6Cold

How St. Louis compares

Same job, same size (400 sq ft), priced for the nearest metros. St. Louis is the priciest of the group. Columbia is the cheapest at $3,800.

Comparison with nearby areas
AreaRangeMidpointvs. here
St. Louis, MOthis page$2,750 – $5,650$4,200
Springfield, IL85 miles$2,650 – $5,450$4,050−3%
Jefferson City, MO95 miles$2,500 – $5,200$3,850−8%
Columbia, MO120 miles$2,450 – $5,150$3,800−9%
Bloomington, IL145 miles$2,600 – $5,400$4,000−4%
Peoria, IL150 miles$2,750 – $5,600$4,150level
Missouri (statewide)$2,500 – $5,250$3,900−7%
United States$2,450 – $5,200$3,850−9%

Across 300 US metros, St. Louis comes in at #32 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, St. Louis is 8% above the Missouri figure.

Other Missouri metros

Missouri metros compared with St. Louis
MetroSizeRangeMidpointvs. here
Kansas City, MO1,096,110 jobs$2,450 – $5,150$3,800−9%
Springfield, MO223,030 jobs$2,350 – $5,000$3,650−12%
Columbia, MO107,680 jobs$2,450 – $5,150$3,800−9%
Joplin, MO87,190 jobs$2,350 – $4,950$3,650−13%
Jefferson City, MO80,220 jobs$2,500 – $5,200$3,850−8%

Cities with a workforce like St. Louis's

Big cities and small ones price differently, so here is St. Louis against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Baltimore, MD1,356,680 jobs$2,450 – $5,200$3,800−9%
Austin, TX1,293,690 jobs$2,250 – $4,800$3,500−16%
Charlotte, NC1,358,370 jobs$2,250 – $4,850$3,550−15%
Portland, OR1,208,410 jobs$2,800 – $5,900$4,350+4%

Cost by quality level and size in St. Louis

Three bands are cut from the same cited range and localized for St. Louis wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,750 to $3,900

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,600 to $4,750

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,500 to $5,650

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$720 – $1,100$1,000 – $1,400$1,300 – $1,700
12x12 (144 sq ft)$1,000 – $1,500$1,400 – $1,900$1,750 – $2,300
20x20 (400 sq ft)$2,750 – $3,900$3,600 – $4,750$4,500 – $5,650
24x24 garage floor (576 sq ft)$3,900 – $5,550$5,100 – $6,750$6,350 – $7,950
30x40 foundation (1,200 sq ft)$8,100 – $11,300$10,500 – $13,700$12,900 – $16,200

Add-ons priced for St. Louis

Extras are quoted nationally and then scaled to St. Louis by the average of the local wage index (1.23) and goods index (1.00), a factor of 1.12. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$450 – $1,350
Remove old concrete first$890 – $2,700

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,600 to $4,750 for St. Louis, MO is attached.

A detailed PDF report of this estimate, $9

Multi-page report for St. Louis, MO: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in St. Louis: your questions

+How much does it cost to pour a concrete slab in St. Louis?

For 400 sq ft, expect $2,750 to $5,650 in the St. Louis area. A standard-spec job lands at $3,600 to $4,750. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in St. Louis?

About $6.70 to $13 per sq ft for materials and labor, plus $50 to $380 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in St. Louis or Springfield?

Springfield is 85 miles away. The midpoint for 400 sq ft there is $4,050, which is 3% less than St. Louis ($4,200). Wage and materials indexes both feed that gap.

+How much of the bill is labor in St. Louis?

About 47% at the midpoint, or $1,950 out of $4,200. Materials are 48% and permits 5%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in St. Louis?

$2,750 to $5,650. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in St. Louis?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $380 for fees in the St. Louis area (our national range of $50 to $400 scaled by the local price level).

+Is St. Louis expensive for concrete slab compared with the rest of Missouri?

St. Louis is 8% above the Missouri statewide estimate ($3,900 at the midpoint). We cover 6 metros in Missouri; see the state page to compare them.

+What do cement masons and concrete finishers earn in St. Louis?

The BLS median is $31.09 an hour in the St. Louis area, compared with $27.41 nationally. The 25th to 75th percentile range is $27.37 to $39.47.

+What do basic and premium concrete slab work cost in St. Louis?

For 400 sq ft, basic work runs $2,750 to $3,900 and premium work $4,500 to $5,650. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in St. Louis?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through June and August through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in St. Louis?

$450 to $1,350 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near St. Louis

Concrete slab: all pricesConcrete slab in MissouriAll projects in St. LouisMissouri cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.