Skip to content
CostLocal

Concrete slab cost in Charlotte, NC

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,250 – $4,850
Per sq ft
$5.55 – $11
before permit
Versus US midpoint
−7%
US $3,850
Rank of 300 metros
#190
1 = most expensive

Local price for a concrete slab in the Charlotte area: $2,250 to $4,850 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 7% lower than the US figure. Cement masons and concrete finishers earn a median of $23.17 an hour in the Charlotte area, 15% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Charlotte, NC, standard level

$3,050 to $4,100

About $7.25 to $9.50 per sq ft before permits. Labor is about 40% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,250
Labor$1,250$1,550
Permits and fees$150$290
Total$3,050$4,100
Save and get a PDF report

Cost breakdown for 400 sq ft in Charlotte, NC

Part of the jobLowMidpointHighShare
Materials$1,150$1,950$2,70054%
Labor$1,050$1,400$1,75040%
Permits and fees$50$220$3906%
Total$2,250$3,550$4,850100%

Why Charlotte prices look the way they do

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $23.17 an hour. Add the other trades involved and the blended wage index for Charlotte is 0.88 (US = 1.00), which puts labor at 40% of the total.

Materials are scaled with BEA's regional price parity for goods. Charlotte is at 96.6 against 100 for the US, so a materials line of $2,000 nationally becomes $1,950 here (midpoint, 400 sq ft). Permits follow the all-items index of 97.3: $50 to $390.

The best months for concrete slab in Charlotte

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Charlotte Douglas Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Charlotte are March through June and August through October: 7 of 12. Outside them, January, February, November and December have an average overnight low of 40°F or below, and July has an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July, crews often start early, wet the base and plan for faster set times.

Charlotte gets about 44 inches of precipitation in a normal year, including roughly 4 inches of snow. The wettest months are March, June and August (4.3 inches in August). Inside the workable window, May and October are the driest, at 3.4 and 3.2 inches. The station averages about 49 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Charlotte Douglas Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan52323.5Cold
Feb57353.1Cold
Mar64414.0Workable
Apr73493.8Workable
May80583.4Workable
Jun87664.0Workable
Jul90703.7Hot
Aug89694.3Workable
Sep83633.7Workable
Oct73503.2Workable
Nov63403.3Cold
Dec55353.6Cold

Charlotte: what basic, standard and premium work costs

The cited range is split into basic, standard and premium bands, then scaled to Charlotte. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,250 to $3,300

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,050 to $4,100

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,800 to $4,850

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$600 – $960$870 – $1,250$1,150 – $1,500
12x12 (144 sq ft)$850 – $1,300$1,200 – $1,650$1,550 – $2,000
20x20 (400 sq ft)$2,250 – $3,300$3,050 – $4,100$3,800 – $4,850
24x24 garage floor (576 sq ft)$3,250 – $4,700$4,300 – $5,750$5,400 – $6,850
30x40 foundation (1,200 sq ft)$6,700 – $9,550$8,850 – $11,700$11,000 – $13,800

Is Charlotte cheap or dear? The local comparison

Same job, same size (400 sq ft), priced for the nearest metros. Charlotte is the priciest of the group. Winston is the cheapest at $3,450.

Comparison with nearby areas
AreaRangeMidpointvs. here
Charlotte, NCthis page$2,250 – $4,850$3,550
Hickory, NC60 miles$2,200 – $4,750$3,450−3%
Spartanburg, SC65 miles$2,250 – $4,800$3,500−2%
Winston, NC70 miles$2,200 – $4,700$3,450−3%
Columbia, SC75 miles$2,250 – $4,800$3,550−1%
Greensboro, NC80 miles$2,200 – $4,700$3,450−3%
North Carolina (statewide)$2,250 – $4,800$3,500−1%
United States$2,450 – $5,200$3,850+7%

Out of the 300 metros we cover, Charlotte ranks #190 for the cost of this job (#1 is the most expensive). Statewide, Charlotte is 1% above the North Carolina figure.

Elsewhere in North Carolina

North Carolina metros compared with Charlotte
MetroSizeRangeMidpointvs. here
Raleigh, NC743,120 jobs$2,250 – $4,850$3,550level
Greensboro, NC365,410 jobs$2,200 – $4,700$3,450−3%
Durham, NC344,020 jobs$2,250 – $4,800$3,500−1%
Winston, NC271,980 jobs$2,200 – $4,700$3,450−3%
Wilmington, NC191,280 jobs$2,200 – $4,800$3,500−2%
Asheville, NC180,620 jobs$2,250 – $4,800$3,550−1%

Metros of a similar size

Big cities and small ones price differently, so here is Charlotte against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Orlando, FL1,411,730 jobs$2,200 – $4,800$3,500−2%
Baltimore, MD1,356,680 jobs$2,450 – $5,200$3,800+7%
Tampa, FL1,447,120 jobs$2,250 – $4,850$3,550level
St. Louis, MO1,341,320 jobs$2,750 – $5,650$4,200+17%

Why two Charlotte quotes can differ

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

What nearby projects cost in Charlotte

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Charlotte wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−6%) and concrete driveway lowest (−9%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,350 – $8,350−9%
Concrete patio300 sq ft$1,150 – $3,700−8%
Detached garage576 sq ft$26,700 – $53,700−8%
Stamped concrete400 sq ft$3,000 – $7,350−7%
Asphalt driveway600 sq ft$2,900 – $6,950−6%
Gravel driveway1,000 sq ft$2,350 – $9,600−6%

Add-ons priced for Charlotte

Add-ons start from national price ranges and are scaled by 0.92 for Charlotte, which is the average of the area's wage index (0.88) and goods price index (0.97). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$370 – $1,100
Remove old concrete first$740 – $2,200

Who does the work: Charlotte trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Charlotte the blend is 0.88.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $23.17 an hour, 15% below the US median of $27.41. The middle half of them earn between $21.67 and $27.69 an hour. About 1,390 work in the metro. That is 10.2 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $22.04 an hour, which is in line with the national $22.66. The middle half of them earn between $18.36 and $23.92 an hour. BLS counts 10,840 of them working in the area, 79.8 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $24.46 an hour, 15% below the US median of $28.78. The middle half of them earn between $22.94 and $28.48 an hour. About 4,440 work in the metro. That is 32.7 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

Carpenters (47-2031), 10% of the weighting: a median of $24.50 an hour, 16% below the US median of $29.12. The middle half of them earn between $22.52 and $28.49 an hour. About 3,730 work in the metro. That is 27.5 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $130 to the midpoint estimate; the 25th percentile takes off about $45. That is a swing of roughly 1.2% to 3.7% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Charlotte-Concord-Gastonia has 1,358,370 jobs in total (BLS, May 2025), ranking 21st by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$21.67$23.17$27.69$27.410.85metro
Construction laborers (47-2061)30%$18.36$22.04$23.92$22.660.97metro
Operating engineers and other construction equipment operators (47-2073)10%$22.94$24.46$28.48$28.780.85metro
Carpenters (47-2031)10%$22.52$24.50$28.49$29.120.84metro
Blended100%0.88

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,050 to $4,100 for Charlotte, NC is attached.

Take this estimate with you: PDF report, $9

The report lays out the concrete slab numbers for Charlotte, NC line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Charlotte: your questions

+How much does it cost to pour a concrete slab in Charlotte?

For 400 sq ft, expect $2,250 to $4,850 in the Charlotte area. A standard-spec job lands at $3,050 to $4,100. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Charlotte?

About $5.55 to $11 per sq ft for materials and labor, plus $50 to $390 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Charlotte or Hickory?

Hickory is 60 miles away. The midpoint for 400 sq ft there is $3,450, which is 3% less than Charlotte ($3,550). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Charlotte?

About 40% at the midpoint, or $1,400 out of $3,550. Materials are 54% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Charlotte?

$2,250 to $4,850. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Charlotte?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $390 for fees in the Charlotte area (our national range of $50 to $400 scaled by the local price level).

+Is Charlotte expensive for concrete slab compared with the rest of North Carolina?

Charlotte is 1% above the North Carolina statewide estimate ($3,500 at the midpoint). We cover 11 metros in North Carolina; see the state page to compare them.

+What do cement masons and concrete finishers earn in Charlotte?

The BLS median is $23.17 an hour in the Charlotte area, compared with $27.41 nationally. The 25th to 75th percentile range is $21.67 to $27.69.

+What do basic and premium concrete slab work cost in Charlotte?

For 400 sq ft, basic work runs $2,250 to $3,300 and premium work $3,800 to $4,850. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Charlotte?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through June and August through October. May and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Charlotte?

$370 to $1,100 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Charlotte

Concrete slab: all pricesConcrete slab in North CarolinaAll projects in CharlotteNorth Carolina cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.