Concrete slab cost in Tampa, FL

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,250 – $4,850
Per sq ft
$5.50 – $11
before permit
Versus US midpoint
−7%
US $3,850
Rank of 300 metros
#199
1 = most expensive

A concrete slab in Tampa, FL usually costs $2,250 to $4,850 for 400 sq ft. That works out to about $5.50 to $11 per sq ft before permits. Compared with the national midpoint that is $270 less. Cement masons and concrete finishers earn a median of $23.84 an hour in the Tampa area, 13% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Tampa, FL, standard level

$3,050 to $4,050

About $7.20 to $9.40 per sq ft before permits. Labor is about 40% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,200
Labor$1,250$1,550
Permits and fees$160$300
Total$3,050$4,050
Save and get a PDF report

Cost breakdown for 400 sq ft in Tampa, FL

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,65054%
Labor$1,050$1,400$1,75040%
Permits and fees$50$230$4006%
Total$2,250$3,550$4,850100%

Where the Tampa price comes from

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Tampa wages are 0.88 times the national level. Labor makes up about 40% of the midpoint estimate (42% at national prices).

Materials are scaled with BEA's regional price parity for goods. Tampa is at 95.5 against 100 for the US, so a materials line of $2,000 nationally becomes $1,900 here (midpoint, 400 sq ft). Permits follow the all-items index of 100.9: $50 to $400.

Cost by quality level and size in Tampa

The cited range is split into basic, standard and premium bands, then scaled to Tampa. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,250 to $3,300

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,050 to $4,050

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,800 to $4,850

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$600 – $970$880 – $1,250$1,150 – $1,500
12x12 (144 sq ft)$840 – $1,300$1,200 – $1,650$1,550 – $2,000
20x20 (400 sq ft)$2,250 – $3,300$3,050 – $4,050$3,800 – $4,850
24x24 garage floor (576 sq ft)$3,250 – $4,650$4,300 – $5,750$5,350 – $6,800
30x40 foundation (1,200 sq ft)$6,650 – $9,500$8,800 – $11,600$10,900 – $13,700

Extras that change the Tampa total

Add-ons start from national price ranges and are scaled by 0.92 for Tampa, which is the average of the area's wage index (0.88) and goods price index (0.95). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$370 – $1,100
Remove old concrete first$740 – $2,200

Tampa weather and the concrete slab calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Tampa Intl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Tampa are October through May: 8 of 12. Outside them, June, July, August and September have an average daytime high of 90°F or more.

Heat matters for concrete as well. With average highs of 90°F or more in June, July, August and September, crews often start early, wet the base and plan for faster set times.

Tampa gets about 49 inches of precipitation in a normal year. The wettest months are June, July and August (9.0 inches in August). Inside the workable window, October and November are the driest, at 2.3 and 1.4 inches. The station averages about 94 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Tampa Intl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan71532.6Workable
Feb74562.6Workable
Mar78592.5Workable
Apr83652.5Workable
May88712.6Workable
Jun91757.4Hot
Jul91777.8Hot
Aug91779.0Hot
Sep90756.1Hot
Oct86692.3Workable
Nov79611.4Workable
Dec74562.6Workable

Planning more than one job in Tampa?

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Tampa wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−7%) and concrete driveway lowest (−9%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,350 – $8,300−9%
Concrete patio300 sq ft$1,150 – $3,700−8%
Detached garage576 sq ft$26,600 – $53,300−8%
Stamped concrete400 sq ft$3,000 – $7,350−8%
Asphalt driveway600 sq ft$2,850 – $6,850−7%
Gravel driveway1,000 sq ft$2,300 – $9,400−8%

What local crews earn in Tampa

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Tampa the blend is 0.88.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $23.84 an hour, 13% below the US median of $27.41. The middle half of them earn between $22.01 and $28.88 an hour. About 1,780 work in the metro. That is 12.3 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.

For construction laborers (47-2061, weighted 30%) the local median is $21.04 an hour, which is 7% below the national $22.66. The middle half of them earn between $17.87 and $22.81 an hour. BLS counts 12,860 of them working in the area, 88.9 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $24.18 an hour, 16% below the US median of $28.78. The middle half of them earn between $22.69 and $28.27 an hour. About 3,980 work in the metro. That is 27.5 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

Carpenters (47-2031), 10% of the weighting: a median of $25.06 an hour, 14% below the US median of $29.12. The middle half of them earn between $22.58 and $29.31 an hour. About 6,010 work in the metro. That is 41.5 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $150 to the midpoint estimate; the 25th percentile takes off about $55. That is a swing of roughly 1.5% to 4.1% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Tampa-St. Petersburg-Clearwater has 1,447,120 jobs in total (BLS, May 2025), ranking 19th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$22.01$23.84$28.88$27.410.87metro
Construction laborers (47-2061)30%$17.87$21.04$22.81$22.660.93metro
Operating engineers and other construction equipment operators (47-2073)10%$22.69$24.18$28.27$28.780.84metro
Carpenters (47-2031)10%$22.58$25.06$29.31$29.120.86metro
Blended100%0.88

Specs and site conditions that change a Tampa bid

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Is Tampa cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $3,450 to $3,600 across Tampa and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Tampa, FLthis page$2,250 – $4,850$3,550
Lakeland, FL50 miles$2,200 – $4,750$3,450−3%
North Port, FL55 miles$2,300 – $4,900$3,600+1%
Orlando, FL75 miles$2,200 – $4,800$3,500−1%
Ocala, FL80 miles$2,150 – $4,700$3,450−3%
Punta Gorda, FL90 miles$2,250 – $4,850$3,550level
Florida (statewide)$2,250 – $4,900$3,600+1%
United States$2,450 – $5,200$3,850+8%

Out of the 300 metros we cover, Tampa ranks #199 for the cost of this job (#1 is the most expensive). Statewide, Tampa is 1% below the Florida figure.

Elsewhere in Florida

Florida metros compared with Tampa
MetroSizeRangeMidpointvs. here
Miami, FL2,819,940 jobs$2,350 – $5,150$3,750+6%
Orlando, FL1,411,730 jobs$2,200 – $4,800$3,500−1%
Jacksonville, FL765,930 jobs$2,250 – $4,850$3,550level
North Port, FL339,940 jobs$2,300 – $4,900$3,600+1%
Cape Coral, FL304,790 jobs$2,250 – $4,850$3,550level
Lakeland, FL265,280 jobs$2,200 – $4,750$3,450−3%

Metros of a similar size

Big cities and small ones price differently, so here is Tampa against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
San Diego, CA1,538,060 jobs$2,800 – $5,900$4,350+22%
Orlando, FL1,411,730 jobs$2,200 – $4,800$3,500−1%
Denver, CO1,609,350 jobs$2,550 – $5,400$3,950+12%
Charlotte, NC1,358,370 jobs$2,250 – $4,850$3,550level

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,050 to $4,050 for Tampa, FL is attached.

Detailed concrete slab report for Tampa, FL, $9

The report lays out the concrete slab numbers for Tampa, FL line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Tampa: your questions

+How much does it cost to pour a concrete slab in Tampa?

For 400 sq ft, expect $2,250 to $4,850 in the Tampa area. A standard-spec job lands at $3,050 to $4,050. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Tampa?

About $5.50 to $11 per sq ft for materials and labor, plus $50 to $400 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Tampa or Lakeland?

Lakeland is 50 miles away. The midpoint for 400 sq ft there is $3,450, which is 3% less than Tampa ($3,550). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Tampa?

About 40% at the midpoint, or $1,400 out of $3,550. Materials are 54% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Tampa?

$2,250 to $4,850. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Tampa?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $400 for fees in the Tampa area (our national range of $50 to $400 scaled by the local price level).

+Is Tampa expensive for concrete slab compared with the rest of Florida?

Tampa is 1% below the Florida statewide estimate ($3,600 at the midpoint). We cover 19 metros in Florida; see the state page to compare them.

+What do cement masons and concrete finishers earn in Tampa?

The BLS median is $23.84 an hour in the Tampa area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.01 to $28.88.

+What do basic and premium concrete slab work cost in Tampa?

For 400 sq ft, basic work runs $2,250 to $3,300 and premium work $3,800 to $4,850. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Tampa?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are October through May. October and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Tampa?

$370 to $1,100 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Tampa

Concrete slab: all pricesConcrete slab in FloridaAll projects in TampaFlorida cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.