Concrete slab cost in Cape Coral, FL

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,250 – $4,850
Per sq ft
$5.50 – $11
before permit
Versus US midpoint
−8%
US $3,850
Rank of 300 metros
#204
1 = most expensive

Local price for a concrete slab in the Cape Coral area: $2,250 to $4,850 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 8% lower than the US figure. Cement masons and concrete finishers earn a median of $23.24 an hour in the Cape Coral area, 15% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Cape Coral, FL, standard level

$3,000 to $4,050

About $7.15 to $9.40 per sq ft before permits. Labor is about 39% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,250
Labor$1,250$1,500
Permits and fees$160$300
Total$3,000$4,050
Save and get a PDF report

Cost breakdown for 400 sq ft in Cape Coral, FL

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,70054%
Labor$1,050$1,400$1,75039%
Permits and fees$50$230$4107%
Total$2,250$3,550$4,850100%

What is behind the Cape Coral number

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Cape Coral wages are 0.86 times the national level. Labor makes up about 39% of the midpoint estimate (42% at national prices).

Materials are scaled with BEA's regional price parity for goods. Cape Coral is at 96.2 against 100 for the US, so a materials line of $2,000 nationally becomes $1,900 here (midpoint, 400 sq ft). Permits follow the all-items index of 102.3: $50 to $410.

Who does the work: Cape Coral trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Cape Coral the blend is 0.86.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $23.24 an hour, 15% below the US median of $27.41. The middle half of them earn between $22.14 and $27.40 an hour. About 960 work in the metro. That is 31.5 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $20.81 an hour, which is 8% below the national $22.66. The middle half of them earn between $17.90 and $22.80 an hour. BLS counts 5,230 of them working in the area, 171.6 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $23.72 an hour, 18% below the US median of $28.78. The middle half of them earn between $22.54 and $28.41 an hour. About 1,160 work in the metro. That is 38.1 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.

Carpenters (47-2031), 10% of the weighting: a median of $23.66 an hour, 19% below the US median of $29.12. The middle half of them earn between $21.73 and $28.72 an hour. About 2,640 work in the metro. That is 86.6 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $120 to the midpoint estimate; the 25th percentile takes off about $30. That is a swing of roughly 0.9% to 3.4% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Cape Coral-Fort Myers has 304,790 jobs in total (BLS, May 2025), ranking 83rd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$22.14$23.24$27.40$27.410.85metro
Construction laborers (47-2061)30%$17.90$20.81$22.80$22.660.92metro
Operating engineers and other construction equipment operators (47-2073)10%$22.54$23.72$28.41$28.780.82metro
Carpenters (47-2031)10%$21.73$23.66$28.72$29.120.81metro
Blended100%0.86

Cost by quality level and size in Cape Coral

The cited range is split into basic, standard and premium bands, then scaled to Cape Coral. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 pad (100 sq ft) to 30x40 foundation (1,200 sq ft).

Basic

$2,250 to $3,300

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,000 to $4,050

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,800 to $4,850

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$600 – $970$870 – $1,250$1,150 – $1,500
12x12 (144 sq ft)$840 – $1,300$1,200 – $1,650$1,550 – $2,000
20x20 (400 sq ft)$2,250 – $3,300$3,000 – $4,050$3,800 – $4,850
24x24 garage floor (576 sq ft)$3,200 – $4,650$4,300 – $5,700$5,350 – $6,800
30x40 foundation (1,200 sq ft)$6,600 – $9,450$8,750 – $11,600$10,900 – $13,700

Cape Coral against nearby metros and the rest of Florida

Of the five closest metros, 2 are cheaper than Cape Coral. Lakeland is the lowest at about $3,450 (midpoint, 400 sq ft), 100 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Cape Coral, FLthis page$2,250 – $4,850$3,550
Punta Gorda, FL25 miles$2,250 – $4,850$3,550level
Naples, FL45 miles$2,300 – $4,900$3,600+2%
North Port, FL60 miles$2,300 – $4,900$3,600+1%
Lakeland, FL100 miles$2,200 – $4,750$3,450−2%
Miami, FL100 miles$2,350 – $5,150$3,750+6%
Florida (statewide)$2,250 – $4,900$3,600+1%
United States$2,450 – $5,200$3,850+8%

Out of the 300 metros we cover, Cape Coral ranks #204 for the cost of this job (#1 is the most expensive). Statewide, Cape Coral is 1% below the Florida figure.

Elsewhere in Florida

Florida metros compared with Cape Coral
MetroSizeRangeMidpointvs. here
Miami, FL2,819,940 jobs$2,350 – $5,150$3,750+6%
Tampa, FL1,447,120 jobs$2,250 – $4,850$3,550level
Orlando, FL1,411,730 jobs$2,200 – $4,800$3,500−1%
Jacksonville, FL765,930 jobs$2,250 – $4,850$3,550level
North Port, FL339,940 jobs$2,300 – $4,900$3,600+1%
Lakeland, FL265,280 jobs$2,200 – $4,750$3,450−2%

Metros of a similar size

Big cities and small ones price differently, so here is Cape Coral against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Wichita, KS308,570 jobs$2,200 – $4,700$3,450−2%
Provo, UT304,660 jobs$2,350 – $4,950$3,650+3%
Colorado Springs, CO316,060 jobs$2,400 – $5,150$3,800+7%
Syracuse, NY300,130 jobs$2,500 – $5,300$3,900+11%

Planning more than one job in Cape Coral?

Jobs that often go together with concrete slab are priced below at their usual sizes, using the same Cape Coral wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−7%) and concrete driveway lowest (−10%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,300 – $8,200−10%
Concrete patio300 sq ft$1,150 – $3,650−8%
Detached garage576 sq ft$26,300 – $52,800−9%
Stamped concrete400 sq ft$3,000 – $7,300−8%
Asphalt driveway600 sq ft$2,850 – $6,850−7%
Gravel driveway1,000 sq ft$2,300 – $9,350−8%

Concrete slab: what moves the price in Cape Coral

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

  • Base and reinforcement

    A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.

Optional extras in Cape Coral

Add-ons start from national price ranges and are scaled by 0.91 for Cape Coral, which is the average of the area's wage index (0.86) and goods price index (0.96). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add rebar reinforcement$370 – $1,100
Remove old concrete first$730 – $2,200

The best months for concrete slab in Cape Coral

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Ft Myers Page Fld Ap (10 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Cape Coral are October through April: 7 of 12. Outside them, May, June, July, August and September have an average daytime high of 90°F or more.

Heat matters for concrete as well. With average highs of 90°F or more in May, June, July, August and September, crews often start early, wet the base and plan for faster set times.

Cape Coral gets about 57 inches of precipitation in a normal year. The wettest months are June, July and August (10.4 inches in August). Inside the workable window, February and November are the driest, at 1.8 and 1.8 inches. The station averages about 120 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Ft Myers Page Fld Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan75542.4Workable
Feb78571.8Workable
Mar81602.1Workable
Apr85642.4Workable
May90693.5Hot
Jun91749.7Hot
Jul92759.4Hot
Aug927510.4Hot
Sep90749.0Hot
Oct87693.1Workable
Nov81621.8Workable
Dec77571.9Workable

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,000 to $4,050 for Cape Coral, FL is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Cape Coral, FL: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Cape Coral: your questions

+How much does it cost to pour a concrete slab in Cape Coral?

For 400 sq ft, expect $2,250 to $4,850 in the Cape Coral area. A standard-spec job lands at $3,000 to $4,050. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Cape Coral?

About $5.50 to $11 per sq ft for materials and labor, plus $50 to $410 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Cape Coral or Punta Gorda?

Punta Gorda is 25 miles away. The midpoint for 400 sq ft there is $3,550, which is 0% less than Cape Coral ($3,550). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Cape Coral?

About 39% at the midpoint, or $1,400 out of $3,550. Materials are 54% and permits 7%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Cape Coral?

$2,250 to $4,850. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Cape Coral?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $410 for fees in the Cape Coral area (our national range of $50 to $400 scaled by the local price level).

+Is Cape Coral expensive for concrete slab compared with the rest of Florida?

Cape Coral is 1% below the Florida statewide estimate ($3,600 at the midpoint). We cover 19 metros in Florida; see the state page to compare them.

+What do cement masons and concrete finishers earn in Cape Coral?

The BLS median is $23.24 an hour in the Cape Coral area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.14 to $27.40.

+What do basic and premium concrete slab work cost in Cape Coral?

For 400 sq ft, basic work runs $2,250 to $3,300 and premium work $3,800 to $4,850. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Cape Coral?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are October through April. February and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Cape Coral?

$370 to $1,100 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Cape Coral

Concrete slab: all pricesConcrete slab in FloridaAll projects in Cape CoralFlorida cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.