Concrete driveway cost in Cape Coral, FL
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (600 sq ft)
- $3,300 – $8,200
- Per sq ft
- $5.40 – $13.50
- before permit
- Versus US midpoint
- −10%
- US $6,450
- Rank of 300 metros
- #209
- 1 = most expensive
If you want to pour a concrete driveway in Cape Coral, plan on $3,300 to $8,200 for 600 sq ft, all in. Per sq ft, that is $5.40 to $13.50 for materials and labor, with the permit on top. The local midpoint runs 10% lower than the national one. Cement masons and concrete finishers earn a median of $23.24 an hour in the Cape Coral area, 15% below the US median of $27.41.
Estimate your concrete driveway cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 600 sq ft in Cape Coral, FL, standard level
$4,750 to $6,750
About $7.80 to $11 per sq ft before permits. Labor is about 66% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,600 | $2,000 |
| Labor | $3,050 | $4,550 |
| Permits and fees | $95 | $160 |
| Total | $4,750 | $6,750 |
Cost breakdown for 600 sq ft in Cape Coral, FL
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,350 | $1,800 | $2,300 | 32% |
| Labor | $1,900 | $3,800 | $5,700 | 66% |
| Permits and fees | $50 | $130 | $200 | 2% |
| Total | $3,300 | $5,750 | $8,200 | 100% |
Why Cape Coral prices look the way they do
We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Cape Coral wages are 0.86 times the national level. Labor makes up about 66% of the midpoint estimate (69% at national prices).
On the materials line, the BEA goods price index for the Cape Coral metro is 96.2 (US = 100). The midpoint materials bill for 600 sq ft comes to $1,800, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (102.3) and land at $50 to $200.
Climate in Cape Coral: timing your concrete driveway job
We use NOAA's 1991-2020 climate normals for Ft Myers Page Fld Ap (10 miles from the city center). These are 30-year monthly averages, not forecasts.
October through April is the stretch where pouring concrete runs into the fewest weather problems in Cape Coral (7 of 12 months). May, June, July, August and September have an average daytime high of 90°F or more.
Heat matters for concrete as well. With average highs of 90°F or more in May, June, July, August and September, crews often start early, wet the base and plan for faster set times.
Cape Coral gets about 57 inches of precipitation in a normal year. The wettest months are June, July and August (10.4 inches in August). Inside the workable window, February and November are the driest, at 1.8 and 1.8 inches. The station averages about 120 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 75 | 54 | 2.4 | Workable |
| Feb | 78 | 57 | 1.8 | Workable |
| Mar | 81 | 60 | 2.1 | Workable |
| Apr | 85 | 64 | 2.4 | Workable |
| May | 90 | 69 | 3.5 | Hot |
| Jun | 91 | 74 | 9.7 | Hot |
| Jul | 92 | 75 | 9.4 | Hot |
| Aug | 92 | 75 | 10.4 | Hot |
| Sep | 90 | 74 | 9.0 | Hot |
| Oct | 87 | 69 | 3.1 | Workable |
| Nov | 81 | 62 | 1.8 | Workable |
| Dec | 77 | 57 | 1.9 | Workable |
Related projects, priced for Cape Coral
Because every project leans on different trades, Cape Coral's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs −7% and concrete patio −8%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Asphalt driveway | 600 sq ft | $2,850 – $6,850 | −7% |
| Gravel driveway | 1,000 sq ft | $2,300 – $9,350 | −8% |
| Concrete slab | 400 sq ft | $2,250 – $4,850 | −8% |
| Stamped concrete | 400 sq ft | $3,000 – $7,300 | −8% |
| Paver patio | 300 sq ft | $2,750 – $5,000 | −8% |
| Concrete patio | 300 sq ft | $1,150 – $3,650 | −8% |
Pick a size, pick a tier: concrete driveway pricing in Cape Coral
Three bands are cut from the same cited range and localized for Cape Coral wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$3,300 to $5,250
Plain gray, 4-inch broom finish, flat site
Standard
$4,750 to $6,750
5-inch with rebar and saw-cut joints, a border or one color
Premium
$6,250 to $8,200
6-inch for heavy vehicles, stamped or colored, grading needed
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $1,350 – $2,150 | $1,950 – $2,800 | $2,600 – $3,400 |
| 2-car (20x24), 480 sq ft | $2,650 – $4,250 | $3,850 – $5,400 | $5,000 – $6,600 |
| 2-car + apron (600 sq ft) | $3,300 – $5,250 | $4,750 – $6,750 | $6,250 – $8,200 |
| 3-car (900 sq ft) | $4,900 – $7,850 | $7,100 – $10,000 | $9,300 – $12,200 |
Optional extras in Cape Coral
Extras are quoted nationally and then scaled to Cape Coral by the average of the local wage index (0.86) and goods index (0.96), a factor of 0.91. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $550 – $1,650 |
| Remove the old driveway | $1,100 – $3,300 |
Cape Coral labor market for concrete driveway
Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Cape Coral is 0.86 times the national level.
For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $23.24 an hour, which is 15% below the national $27.41. The middle half of them earn between $22.14 and $27.40 an hour. BLS counts 960 of them working in the area, 31.5 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.
Construction laborers (47-2061), 30% of the weighting: a median of $20.81 an hour, 8% below the US median of $22.66. The middle half of them earn between $17.90 and $22.80 an hour. About 5,230 work in the metro. That is 171.6 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $23.72 an hour, which is 18% below the national $28.78. The middle half of them earn between $22.54 and $28.41 an hour. BLS counts 1,160 of them working in the area, 38.1 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.
For carpenters (47-2031, weighted 10%) the local median is $23.66 an hour, which is 19% below the national $29.12. The middle half of them earn between $21.73 and $28.72 an hour. BLS counts 2,640 of them working in the area, 86.6 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($27.40 an hour) instead of the median, the labor line grows by about $330. At the 25th percentile ($22.14) it shrinks by about $90. The total moves by 5.8% or 1.5%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 304,790 jobs in the Cape Coral-Fort Myers area. That makes it the 83rd largest of the 300 metros we cover, with 0.20% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $22.14 | $23.24 | $27.40 | $27.41 | 0.85 | metro |
| Construction laborers (47-2061) | 30% | $17.90 | $20.81 | $22.80 | $22.66 | 0.92 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $22.54 | $23.72 | $28.41 | $28.78 | 0.82 | metro |
| Carpenters (47-2031) | 10% | $21.73 | $23.66 | $28.72 | $29.12 | 0.81 | metro |
| Blended | 100% | 0.86 | |||||
Is Cape Coral cheap or dear? The local comparison
Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 600 sq ft range from $5,550 to $6,000 across Cape Coral and its five closest metros.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Cape Coral, FLthis page | $3,300 – $8,200 | $5,750 | |
| Punta Gorda, FL25 miles | $3,300 – $8,200 | $5,750 | level |
| Naples, FL45 miles | $3,350 – $8,450 | $5,900 | +3% |
| North Port, FL60 miles | $3,350 – $8,400 | $5,900 | +2% |
| Lakeland, FL100 miles | $3,200 – $7,950 | $5,550 | −3% |
| Miami, FL100 miles | $3,450 – $8,600 | $6,000 | +5% |
| Florida (statewide) | $3,350 – $8,300 | $5,850 | +1% |
| United States | $3,650 – $9,200 | $6,450 | +12% |
Across 300 US metros, Cape Coral comes in at #209 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, Cape Coral is 1% below the Florida figure.
Other Florida metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Miami, FL | 2,819,940 jobs | $3,450 – $8,600 | $6,000 | +5% |
| Tampa, FL | 1,447,120 jobs | $3,350 – $8,300 | $5,850 | +1% |
| Orlando, FL | 1,411,730 jobs | $3,250 – $8,100 | $5,700 | −1% |
| Jacksonville, FL | 765,930 jobs | $3,300 – $8,300 | $5,800 | +1% |
| North Port, FL | 339,940 jobs | $3,350 – $8,400 | $5,900 | +2% |
| Lakeland, FL | 265,280 jobs | $3,200 – $7,950 | $5,550 | −3% |
Cities with a workforce like Cape Coral's
Big cities and small ones price differently, so here is Cape Coral against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Wichita, KS | 308,570 jobs | $3,250 – $8,100 | $5,650 | −1% |
| Provo, UT | 304,660 jobs | $3,450 – $8,650 | $6,050 | +5% |
| Colorado Springs, CO | 316,060 jobs | $3,650 – $9,200 | $6,450 | +12% |
| Syracuse, NY | 300,130 jobs | $3,800 – $9,600 | $6,700 | +16% |
Specs and site conditions that change a Cape Coral bid
Thickness
HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.
Old driveway removal
Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.
Grading and drainage
Professional grading runs $3-$8 per sq ft or $700-$2,500 for a typical job. A sloped lot or poor soil raises it.
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,750 to $6,750 for Cape Coral, FL is attached.
A detailed PDF report of this estimate, $9
The report lays out the concrete driveway numbers for Cape Coral, FL line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete driveway in Cape Coral: your questions
+How much does it cost to pour a concrete driveway in Cape Coral?
For 600 sq ft, expect $3,300 to $8,200 in the Cape Coral area. A standard-spec job lands at $4,750 to $6,750. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete driveway in Cape Coral?
About $5.40 to $13.50 per sq ft for materials and labor, plus $50 to $200 for the permit if one is needed. The US range is $6 to $15.
+Is concrete driveway cheaper in Cape Coral or Punta Gorda?
Punta Gorda is 25 miles away. The midpoint for 600 sq ft there is $5,750, which is 0% more than Cape Coral ($5,750). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Cape Coral?
About 66% at the midpoint, or $3,800 out of $5,750. Materials are 32% and permits 2%. Nationally, labor is 69%.
+What would 2-car + apron (600 sq ft) cost in Cape Coral?
$3,300 to $8,200. Pick a different size in the estimator above to get your own number.
+Does concrete driveway need a permit in Cape Coral?
Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $200 for fees in the Cape Coral area (our national range of $50 to $200 scaled by the local price level).
+Is Cape Coral expensive for concrete driveway compared with the rest of Florida?
Cape Coral is 1% below the Florida statewide estimate ($5,850 at the midpoint). We cover 19 metros in Florida; see the state page to compare them.
+What do cement masons and concrete finishers earn in Cape Coral?
The BLS median is $23.24 an hour in the Cape Coral area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.14 to $27.40.
+What do basic and premium concrete driveway work cost in Cape Coral?
For 600 sq ft, basic work runs $3,300 to $5,250 and premium work $6,250 to $8,200. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.
+When is the best time to pour a concrete driveway in Cape Coral?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are October through April. February and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Cape Coral?
$550 to $1,650 for 600 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete driveway near Cape Coral
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.