Skip to content
CostLocal

Concrete driveway cost in North Port, FL

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (600 sq ft)
$3,350 – $8,400
Per sq ft
$5.50 – $13.50
before permit
Versus US midpoint
−9%
US $6,450
Rank of 300 metros
#187
1 = most expensive

North Port homeowners pay roughly $3,350 to $8,400 to pour a concrete driveway at 600 sq ft, or $5.50 to $13.50 per sq ft (permit not included). Against the US midpoint, North Port is 9% lower. Cement masons and concrete finishers earn a median of $23.77 an hour in the North Port area, 13% below the US median of $27.41.

Estimate your concrete driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

5-inch with rebar and saw-cut joints, a border or one color

Add-ons

Estimated cost for 600 sq ft in North Port, FL, standard level

$4,850 to $6,900

About $7.95 to $11 per sq ft before permits. Labor is about 67% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,000
Labor$3,150$4,700
Permits and fees$95$160
Total$4,850$6,900
Save and get a PDF report

Cost breakdown for 600 sq ft in North Port, FL

Part of the jobLowMidpointHighShare
Materials$1,350$1,800$2,30031%
Labor$2,000$3,950$5,90067%
Permits and fees$50$130$2002%
Total$3,350$5,900$8,400100%

Where the North Port price comes from

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, North Port wages are 0.89 times the national level. Labor makes up about 67% of the midpoint estimate (69% at national prices).

On the materials line, the BEA goods price index for the North Port metro is 96.2 (US = 100). The midpoint materials bill for 600 sq ft comes to $1,800, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (102.4) and land at $50 to $200.

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for North Port is 0.89 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $23.77 an hour, which is 13% below the national $27.41. The middle half of them earn between $22.03 and $28.99 an hour. BLS counts 720 of them working in the area, 21.2 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $21.82 an hour, 4% below the US median of $22.66. The middle half of them earn between $18.18 and $23.55 an hour. About 4,260 work in the metro. That is 125.3 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $23.78 an hour, which is 17% below the national $28.78. The middle half of them earn between $22.90 and $27.52 an hour. BLS counts 1,090 of them working in the area, 32.1 for every 10,000 jobs (US: 30.7), so the local bench is about average.

For carpenters (47-2031, weighted 10%) the local median is $25.00 an hour, which is 14% below the national $29.12. The middle half of them earn between $22.52 and $29.78 an hour. BLS counts 1,870 of them working in the area, 55.0 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($28.99 an hour) instead of the median, the labor line grows by about $420. At the 25th percentile ($22.03) it shrinks by about $140. The total moves by 7.1% or 2.4%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 339,940 jobs in the North Port-Bradenton-Sarasota area. That makes it the 75th largest of the 300 metros we cover, with 0.22% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$22.03$23.77$28.99$27.410.87metro
Construction laborers (47-2061)30%$18.18$21.82$23.55$22.660.96metro
Operating engineers and other construction equipment operators (47-2073)10%$22.90$23.78$27.52$28.780.83metro
Carpenters (47-2031)10%$22.52$25.00$29.78$29.120.86metro
Blended100%0.89

Planning more than one job in North Port?

Because every project leans on different trades, North Port's wage level does not move all prices equally. Against the US midpoint, paver patio runs −6% and gravel driveway −7%.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$2,850 – $6,950−6%
Gravel driveway1,000 sq ft$2,300 – $9,500−7%
Concrete slab400 sq ft$2,300 – $4,900−6%
Stamped concrete400 sq ft$3,050 – $7,400−7%
Paver patio300 sq ft$2,800 – $5,150−6%
Concrete patio300 sq ft$1,150 – $3,700−7%

Specs and site conditions that change a North Port bid

  • Permits and the apron

    A driveway permit is typically $50-$200 and is often required for new work. The apron where the driveway meets the street can need a separate right-of-way permit.

  • Thickness

    HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.

  • Old driveway removal

    Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.

When to schedule concrete driveway in North Port

We use NOAA's 1991-2020 climate normals for Punta Gorda Charlotte Co Ap (15 miles from the city center). These are 30-year monthly averages, not forecasts.

October through April is the stretch where pouring concrete runs into the fewest weather problems in North Port (7 of 12 months). May, June, July, August and September have an average daytime high of 90°F or more.

Heat matters for concrete as well. With average highs of 90°F or more in May, June, July, August and September, crews often start early, wet the base and plan for faster set times.

North Port gets about 53 inches of precipitation in a normal year. The wettest months are June, July and August (9.2 inches in June). Inside the workable window, November and December are the driest, at 2.1 and 2.0 inches. The station averages about 124 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Punta Gorda Charlotte Co Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan75512.3Workable
Feb78532.5Workable
Mar81562.3Workable
Apr86612.2Workable
May90663.3Hot
Jun92729.2Hot
Jul93748.1Hot
Aug93759.1Hot
Sep91736.9Hot
Oct87673.0Workable
Nov82592.1Workable
Dec78542.0Workable

How North Port compares

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 600 sq ft range from $5,550 to $5,900 across North Port and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
North Port, FLthis page$3,350 – $8,400$5,900
Punta Gorda, FL40 miles$3,300 – $8,200$5,750−2%
Tampa, FL55 miles$3,350 – $8,300$5,850−1%
Cape Coral, FL60 miles$3,300 – $8,200$5,750−2%
Lakeland, FL60 miles$3,200 – $7,950$5,550−5%
Orlando, FL100 miles$3,250 – $8,100$5,700−3%
Florida (statewide)$3,350 – $8,300$5,850−1%
United States$3,650 – $9,200$6,450+9%

Across 300 US metros, North Port comes in at #187 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, North Port is 1% above the Florida figure.

Other Florida metros

Florida metros compared with North Port
MetroSizeRangeMidpointvs. here
Miami, FL2,819,940 jobs$3,450 – $8,600$6,000+3%
Tampa, FL1,447,120 jobs$3,350 – $8,300$5,850−1%
Orlando, FL1,411,730 jobs$3,250 – $8,100$5,700−3%
Jacksonville, FL765,930 jobs$3,300 – $8,300$5,800−1%
Cape Coral, FL304,790 jobs$3,300 – $8,200$5,750−2%
Lakeland, FL265,280 jobs$3,200 – $7,950$5,550−5%

Cities with a workforce like North Port's

Big cities and small ones price differently, so here is North Port against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Durham, NC344,020 jobs$3,300 – $8,150$5,700−3%
El Paso, TX339,120 jobs$3,000 – $7,300$5,150−12%
Worcester, MA349,880 jobs$4,050 – $10,500$7,250+23%
Bakersfield, CA338,230 jobs$3,950 – $10,100$7,000+19%

North Port: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for North Port wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$3,350 to $5,350

Plain gray, 4-inch broom finish, flat site

Standard

$4,850 to $6,900

5-inch with rebar and saw-cut joints, a border or one color

Premium

$6,400 to $8,400

6-inch for heavy vehicles, stamped or colored, grading needed

Cost by size and quality level
SizeBasicStandardPremium
1-car (12x20), 240 sq ft$1,350 – $2,200$2,000 – $2,850$2,650 – $3,500
2-car (20x24), 480 sq ft$2,700 – $4,300$3,900 – $5,550$5,150 – $6,750
2-car + apron (600 sq ft)$3,350 – $5,350$4,850 – $6,900$6,400 – $8,400
3-car (900 sq ft)$5,000 – $8,000$7,250 – $10,200$9,500 – $12,500

Optional extras in North Port

Extras are quoted nationally and then scaled to North Port by the average of the local wage index (0.89) and goods index (0.96), a factor of 0.93. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$560 – $1,650
Remove the old driveway$1,100 – $3,350

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,850 to $6,900 for North Port, FL is attached.

A detailed PDF report of this estimate, $9

The report lays out the concrete driveway numbers for North Port, FL line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete driveway in North Port: your questions

+How much does it cost to pour a concrete driveway in North Port?

For 600 sq ft, expect $3,350 to $8,400 in the North Port area. A standard-spec job lands at $4,850 to $6,900. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete driveway in North Port?

About $5.50 to $13.50 per sq ft for materials and labor, plus $50 to $200 for the permit if one is needed. The US range is $6 to $15.

+Is concrete driveway cheaper in North Port or Punta Gorda?

Punta Gorda is 40 miles away. The midpoint for 600 sq ft there is $5,750, which is 2% less than North Port ($5,900). Wage and materials indexes both feed that gap.

+How much of the bill is labor in North Port?

About 67% at the midpoint, or $3,950 out of $5,900. Materials are 31% and permits 2%. Nationally, labor is 69%.

+What would 2-car + apron (600 sq ft) cost in North Port?

$3,350 to $8,400. Pick a different size in the estimator above to get your own number.

+Does concrete driveway need a permit in North Port?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $200 for fees in the North Port area (our national range of $50 to $200 scaled by the local price level).

+Is North Port expensive for concrete driveway compared with the rest of Florida?

North Port is 1% above the Florida statewide estimate ($5,850 at the midpoint). We cover 19 metros in Florida; see the state page to compare them.

+What do cement masons and concrete finishers earn in North Port?

The BLS median is $23.77 an hour in the North Port area, compared with $27.41 nationally. The 25th to 75th percentile range is $22.03 to $28.99.

+What do basic and premium concrete driveway work cost in North Port?

For 600 sq ft, basic work runs $3,350 to $5,350 and premium work $6,400 to $8,400. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.

+When is the best time to pour a concrete driveway in North Port?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are October through April. November and December are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in North Port?

$560 to $1,650 for 600 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete driveway near North Port

Concrete driveway: all pricesConcrete driveway in FloridaAll projects in North PortFlorida cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.