Concrete driveway cost in San Jose, CA
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (600 sq ft)
- $4,700 – $12,200
- Per sq ft
- $7.75 – $20
- before permit
- Versus US midpoint
- +32%
- US $6,450
- Rank of 300 metros
- #4
- 1 = most expensive
A concrete driveway in San Jose, CA usually costs $4,700 to $12,200 for 600 sq ft. That works out to about $7.75 to $20 per sq ft before permits. Compared with the national midpoint that is $2,050 more. Cement masons and concrete finishers earn a median of $36.31 an hour in the San Jose area, 32% above the US median of $27.41.
Estimate your concrete driveway cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 600 sq ft in San Jose, CA, standard level
$6,950 to $10,000
About $11.50 to $16.50 per sq ft before permits. Labor is about 75% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,750 | $2,200 |
| Labor | $5,100 | $7,600 |
| Permits and fees | $100 | $170 |
| Total | $6,950 | $10,000 |
Cost breakdown for 600 sq ft in San Jose, CA
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,450 | $2,000 | $2,500 | 23% |
| Labor | $3,200 | $6,350 | $9,500 | 75% |
| Permits and fees | $55 | $140 | $220 | 2% |
| Total | $4,700 | $8,450 | $12,200 | 100% |
What is behind the San Jose number
Labor is 75% of the midpoint bill here, against 69% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In San Jose the blended ratio comes out at 1.44.
Materials are scaled with BEA's regional price parity for goods. San Jose is at 105.2 against 100 for the US, so a materials line of $1,900 nationally becomes $2,000 here (midpoint, 600 sq ft). Permits follow the all-items index of 110.4: $55 to $220.
San Jose weather and the concrete driveway calendar
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, San Jose (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.
Weather is not a serious constraint for pouring concrete in San Jose: no month in the averages is cold enough (an average overnight low of 40°F or below) or hot enough (an average daytime high of 90°F or more) to rule it out, so the workable window is all year.
San Jose gets about 13 inches of precipitation in a normal year. The wettest months are January, February and December (2.8 inches in January). The station averages about 16 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 60 | 42 | 2.8 | Workable |
| Feb | 62 | 44 | 2.7 | Workable |
| Mar | 66 | 46 | 2.1 | Workable |
| Apr | 69 | 48 | 1.1 | Workable |
| May | 74 | 52 | 0.4 | Workable |
| Jun | 79 | 56 | 0.2 | Workable |
| Jul | 81 | 58 | 0.0 | Workable |
| Aug | 81 | 59 | 0.1 | Workable |
| Sep | 81 | 57 | 0.1 | Workable |
| Oct | 76 | 53 | 0.5 | Workable |
| Nov | 66 | 46 | 1.3 | Workable |
| Dec | 60 | 42 | 2.3 | Workable |
Extras that change the San Jose total
Add-ons start from national price ranges and are scaled by 1.24 for San Jose, which is the average of the area's wage index (1.44) and goods price index (1.05). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $750 – $2,250 |
| Remove the old driveway | $1,500 – $4,500 |
Related projects, priced for San Jose
Jobs that often go together with concrete driveway are priced below at their usual sizes, using the same San Jose wage and price inputs. Compared with national midpoints, gravel driveway comes out highest (+41%) and concrete slab lowest (+22%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Asphalt driveway | 600 sq ft | $3,850 – $9,850 | +31% |
| Gravel driveway | 1,000 sq ft | $3,550 – $14,300 | +41% |
| Concrete slab | 400 sq ft | $3,050 – $6,250 | +22% |
| Stamped concrete | 400 sq ft | $3,950 – $9,950 | +24% |
| Paver patio | 300 sq ft | $3,650 – $6,700 | +23% |
| Concrete patio | 300 sq ft | $1,500 – $5,100 | +26% |
How San Jose compares
Of the five closest metros, all are cheaper than San Jose. Merced is the lowest at about $6,800 (midpoint, 600 sq ft), 40 miles away.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| San Jose, CAthis page | $4,700 – $12,200 | $8,450 | |
| Santa Cruz, CA35 miles | $4,050 – $10,400 | $7,200 | −15% |
| Merced, CA40 miles | $3,850 – $9,750 | $6,800 | −20% |
| Salinas, CA45 miles | $4,250 – $10,900 | $7,550 | −11% |
| Modesto, CA50 miles | $4,450 – $11,500 | $8,000 | −6% |
| Stockton, CA70 miles | $3,950 – $10,100 | $7,000 | −17% |
| California (statewide) | $4,200 – $10,700 | $7,450 | −12% |
| United States | $3,650 – $9,200 | $6,450 | −24% |
Out of the 300 metros we cover, San Jose ranks #4 for the cost of this job (#1 is the most expensive). Statewide, San Jose is 14% above the California figure.
Elsewhere in California
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Los Angeles, CA | 6,271,560 jobs | $4,200 – $10,800 | $7,500 | −11% |
| San Francisco, CA | 2,373,920 jobs | $4,850 – $12,600 | $8,750 | +3% |
| Riverside, CA | 1,716,760 jobs | $4,000 – $10,200 | $7,100 | −16% |
| San Diego, CA | 1,538,060 jobs | $4,250 – $10,800 | $7,500 | −11% |
| Sacramento, CA | 1,080,590 jobs | $4,150 – $10,600 | $7,350 | −13% |
| Fresno, CA | 476,890 jobs | $3,950 – $9,950 | $6,950 | −18% |
Metros of a similar size
Big cities and small ones price differently, so here is San Jose against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Las Vegas, NV | 1,136,960 jobs | $3,700 – $9,450 | $6,600 | −22% |
| San Antonio, TX | 1,126,880 jobs | $3,150 – $7,900 | $5,550 | −35% |
| Portland, OR | 1,208,410 jobs | $4,300 – $11,000 | $7,650 | −9% |
| Pittsburgh, PA | 1,114,490 jobs | $3,850 – $9,750 | $6,800 | −20% |
Pick a size, pick a tier: concrete driveway pricing in San Jose
The cited range is split into basic, standard and premium bands, then scaled to San Jose. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 1-car (12x20), 240 sq ft to 3-car (900 sq ft).
Basic
$4,700 to $7,700
Plain gray, 4-inch broom finish, flat site
Standard
$6,950 to $10,000
5-inch with rebar and saw-cut joints, a border or one color
Premium
$9,200 to $12,200
6-inch for heavy vehicles, stamped or colored, grading needed
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $1,900 – $3,150 | $2,850 – $4,100 | $3,800 – $5,050 |
| 2-car (20x24), 480 sq ft | $3,750 – $6,200 | $5,600 – $8,000 | $7,400 – $9,850 |
| 2-car + apron (600 sq ft) | $4,700 – $7,700 | $6,950 – $10,000 | $9,200 – $12,200 |
| 3-car (900 sq ft) | $7,000 – $11,500 | $10,400 – $14,900 | $13,800 – $18,200 |
What local crews earn in San Jose
The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For San Jose the blend is 1.44.
Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $36.31 an hour, 32% above the US median of $27.41. The middle half of them earn between $28.55 and $48.06 an hour. About 1,500 work in the metro. That is 13.2 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.
For construction laborers (47-2061, weighted 30%) the local median is $32.92 an hour, which is 45% above the national $22.66. The middle half of them earn between $27.33 and $38.90 an hour. BLS counts 4,420 of them working in the area, 38.9 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $59.78 an hour, 108% above the US median of $28.78. The middle half of them earn between $38.21 and $62.57 an hour. About 1,360 work in the metro. That is 12.0 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.
Carpenters (47-2031), 10% of the weighting: a median of $38.55 an hour, 32% above the US median of $29.12. The middle half of them earn between $30.23 and $49.38 an hour. About 4,460 work in the metro. That is 39.3 per 10,000 jobs, compared with 43.1 nationally, so the supply of crews looks typical.
A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $950 to the midpoint estimate; the 25th percentile takes off about $620. That is a swing of roughly 7.4% to 11.2% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
San Jose-Sunnyvale-Santa Clara has 1,134,970 jobs in total (BLS, May 2025), ranking 27th by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $28.55 | $36.31 | $48.06 | $27.41 | 1.32 | metro |
| Construction laborers (47-2061) | 30% | $27.33 | $32.92 | $38.90 | $22.66 | 1.45 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $38.21 | $59.78 | $62.57 | $28.78 | 2.08 | metro |
| Carpenters (47-2031) | 10% | $30.23 | $38.55 | $49.38 | $29.12 | 1.32 | metro |
| Blended | 100% | 1.44 | |||||
Specs and site conditions that change a San Jose bid
Thickness
HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.
Old driveway removal
Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.
Grading and drainage
Professional grading runs $3-$8 per sq ft or $700-$2,500 for a typical job. A sloped lot or poor soil raises it.
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $6,950 to $10,000 for San Jose, CA is attached.
A detailed PDF report of this estimate, $9
The report lays out the concrete driveway numbers for San Jose, CA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete driveway in San Jose: your questions
+How much does it cost to pour a concrete driveway in San Jose?
For 600 sq ft, expect $4,700 to $12,200 in the San Jose area. A standard-spec job lands at $6,950 to $10,000. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete driveway in San Jose?
About $7.75 to $20 per sq ft for materials and labor, plus $55 to $220 for the permit if one is needed. The US range is $6 to $15.
+Is concrete driveway cheaper in San Jose or Santa Cruz?
Santa Cruz is 35 miles away. The midpoint for 600 sq ft there is $7,200, which is 15% less than San Jose ($8,450). Wage and materials indexes both feed that gap.
+How much of the bill is labor in San Jose?
About 75% at the midpoint, or $6,350 out of $8,450. Materials are 23% and permits 2%. Nationally, labor is 69%.
+What would 2-car + apron (600 sq ft) cost in San Jose?
$4,700 to $12,200. Pick a different size in the estimator above to get your own number.
+Does concrete driveway need a permit in San Jose?
Often, but rules are set by your city or county building office, so call before you hire. Budget $55 to $220 for fees in the San Jose area (our national range of $50 to $200 scaled by the local price level).
+Is San Jose expensive for concrete driveway compared with the rest of California?
San Jose is 14% above the California statewide estimate ($7,450 at the midpoint). We cover 23 metros in California; see the state page to compare them.
+What do cement masons and concrete finishers earn in San Jose?
The BLS median is $36.31 an hour in the San Jose area, compared with $27.41 nationally. The 25th to 75th percentile range is $28.55 to $48.06.
+What do basic and premium concrete driveway work cost in San Jose?
For 600 sq ft, basic work runs $4,700 to $7,700 and premium work $9,200 to $12,200. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.
+Is there a bad season to pour a concrete driveway in San Jose?
Not from a temperature point of view. NOAA's 1991-2020 normals show no month with a freezing-level overnight low or a 90°F-plus average high, so timing is mostly about contractor availability and rain.
+What does "add rebar reinforcement" add in San Jose?
$750 to $2,250 for 600 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete driveway near San Jose
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.