Stamped concrete cost in Washington

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$3,800 – $9,400
Per sq ft
$9.30 – $22.50
before permit
Versus US midpoint
+18%
US $5,600
Metros covered
7

Across Washington, stamped concrete costs about $3,800 to $9,400 for 400 sq ft. Statewide, that midpoint is 18% above the US figure of $5,600. Cement masons and concrete finishers earn a median $37.27 an hour in Washington (US: $27.41).

Inside Washington, the metros we cover range from $6,400 (Spokane) to $6,800 (Seattle) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in Washington (statewide), standard level

$5,450 to $7,700

About $13.50 to $18.50 per sq ft before permits. Labor is about 54% of the bill.

Cost breakdown
PartLowHigh
Materials$2,450$3,200
Labor$2,900$4,250
Permits and fees$150$280
Total$5,450$7,700
Save and get a PDF report

Cost breakdown for 400 sq ft in Washington

Part of the jobLowMidpointHighShare
Materials$1,900$2,800$3,75043%
Labor$1,850$3,550$5,30054%
Permits and fees$55$210$3703%
Total$3,800$6,600$9,400100%

Weather windows across Washington

Weather decides when pouring concrete can happen, and Washington is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.

Seattle has the longest comfortable season of the metros we cover in Washington at 8 months (April through November); Kennewick has the shortest at 3 (May through June and September). Rainfall runs from 8 inches a year in Kennewick to 57 inches in Bremerton.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Seattle3777388: April through November
Spokane2687175: May through September
Olympia3378516: May through October
Kennewick289383: May through June and September
Yakima249084: May through June and August through September
Bremerton3677577: April through October
Bellingham3473357: April through October

Stamped concrete cost by metro in Washington

3 of the 7 metros sit above the statewide midpoint of $6,600, and the top-to-bottom gap is 6%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Seattle, WA$3,850 – $9,700$6,800+3%
Yakima, WA$3,850 – $9,550$6,700+1%
Bellingham, WA$3,800 – $9,500$6,650+1%
Olympia, WA$3,750 – $9,400$6,600level
Bremerton, WA$3,750 – $9,350$6,550−1%
Kennewick, WA$3,750 – $9,300$6,550−1%
Spokane, WA$3,700 – $9,100$6,400−3%

Washington versus the states around it

Washington ranks 4 of 51 (the 50 states plus DC) for stamped concrete, where 1 is the most expensive. The costliest is Hawaii at $7,800 and the cheapest Arkansas at $4,850, both for 400 sq ft at the midpoint. Washington sits at $6,600. The five states closest by workforce center are listed below.

States near Washington, same project and size
StateDistanceRangeMidpointvs. here
Oregon170 miles away$3,600 – $8,800$6,200−6%
Idaho380 miles away$3,200 – $7,800$5,500−17%
Montana500 miles away$3,250 – $8,050$5,650−14%
Utah650 miles away$3,150 – $7,800$5,500−17%
Nevada780 miles away$3,300 – $8,100$5,700−14%

Extras that change the Washington total

Add-ons start from national price ranges and are scaled by 1.18 for Washington, which is the average of the area's wage index (1.32) and goods price index (1.04). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a vapor barrier$240 – $470

What cement masons and concrete finishers and the other trades earn in Washington

Washington's labor line is priced from 3 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 1.32 times the national level.

Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $37.27 an hour, 36% above the US median of $27.41. The middle half of them earn between $28.31 and $47.25 an hour. About 4,440 work in the state. That is 12.5 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.

For construction laborers (47-2061, weighted 30%) the local median is $27.75 an hour, which is 22% above the national $22.66. The middle half of them earn between $22.56 and $34.69 an hour. BLS counts 25,060 of them working in the state, 70.6 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $39.28 an hour, 36% above the US median of $28.78. The middle half of them earn between $30.96 and $55.12 an hour. About 10,290 work in the state. That is 29.0 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

A crew paid at the 75th percentile for cement masons and concrete finishers ($47.25 an hour) would add about $590 to the statewide midpoint; one at the 25th percentile ($28.31) would take off about $530. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 3,550,970 jobs across Washington (May 2025), which is 2.3% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$28.31$37.27$47.25$27.411.36state
Construction laborers (47-2061)30%$22.56$27.75$34.69$22.661.22state
Operating engineers and other construction equipment operators (47-2073)10%$30.96$39.28$55.12$28.781.36state
Blended100%1.32

Why two Washington quotes can differ

  • Pattern and color

    Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

  • Sealing and vapor barrier

    Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

Basic, standard or premium: Washington prices

Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).

Basic

$3,800 to $6,050

Basic pattern, one integral color

Standard

$5,450 to $7,700

Two-tone color release and a border

Premium

$7,150 to $9,400

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,900 – $3,100$2,800 – $4,000$3,700 – $4,900
20x20 patio (400 sq ft)$3,800 – $6,050$5,450 – $7,700$7,150 – $9,400
2-car driveway (600 sq ft)$5,650 – $8,950$8,150 – $11,400$10,600 – $13,900

Related projects, priced for Washington

Each project weights the trades differently, so Washington's wage level does not push every price by the same amount. Compared with the US midpoint, concrete driveway is +22% and concrete slab +16%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,400 – $4,800+18%
Concrete driveway600 sq ft$4,400 – $11,300+22%
Paver patio300 sq ft$3,500 – $6,400+17%
Concrete slab400 sq ft$2,850 – $5,950+16%
Asphalt driveway600 sq ft$3,600 – $9,050+21%
Gravel driveway1,000 sq ft$2,950 – $11,900+17%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,450 to $7,700 for Washington is attached.

Detailed stamped concrete report for Washington, $9

Multi-page report for Washington: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in Washington: your questions

+How much does it cost to pour stamped concrete in Washington?

$3,800 to $9,400 for 400 sq ft, using statewide wages and prices. Metro areas inside Washington can sit above or below that.

+Which city in Washington is cheapest for stamped concrete?

Spokane at about $6,400 (midpoint, 400 sq ft). The priciest is Seattle at $6,800.

+Is stamped concrete cheaper in Washington than the US average?

It is 18% more expensive: $6,600 against $5,600 for 400 sq ft at the midpoint.

+What share of the price is labor in Washington?

About 54% ($3,550). Materials are 43%. Statewide labor for this job is weighted 1.32x the national wage level.

+What do cement masons and concrete finishers earn in Washington?

The BLS statewide median is $37.27 an hour, against $27.41 for the US. The 25th to 75th percentile range is $28.31 to $47.25.

+Where does Washington rank for stamped concrete costs?

4th most expensive of 51 (the 50 states plus DC) at the midpoint, $6,600 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium stamped concrete work cost in Washington?

For 400 sq ft, basic work runs $3,800 to $6,050 and premium work $7,150 to $9,400. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+Does the season matter for stamped concrete in Washington?

Yes where winters or summers are hard. Of the Washington metros we cover, Seattle has the most comfortable months (8 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add a vapor barrier" add in Washington?

$240 to $470 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Stamped concrete by city in Washington

Stamped concrete: all pricesWashington cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.