Stamped concrete cost in Ohio

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$3,300 – $8,200
Per sq ft
$8.15 – $19.50
before permit
Versus US midpoint
+3%
US $5,600
Metros covered
8

Across Ohio, stamped concrete costs about $3,300 to $8,200 for 400 sq ft. Statewide, that midpoint is 3% above the US figure of $5,600. Cement masons and concrete finishers earn a median $30.28 an hour in Ohio (US: $27.41).

Inside Ohio, the metros we cover range from $5,550 (Youngstown) to $5,950 (Columbus) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in Ohio (statewide), standard level

$4,800 to $6,750

About $11.50 to $16 per sq ft before permits. Labor is about 53% of the bill.

Cost breakdown
PartLowHigh
Materials$2,200$2,850
Labor$2,450$3,650
Permits and fees$130$240
Total$4,800$6,750
Save and get a PDF report

Cost breakdown for 400 sq ft in Ohio

Part of the jobLowMidpointHighShare
Materials$1,700$2,550$3,35044%
Labor$1,600$3,050$4,50053%
Permits and fees$45$190$3203%
Total$3,300$5,750$8,200100%

If you are planning more than one job in Ohio

The table prices neighboring jobs at their usual sizes using statewide Ohio wages and prices. Against national midpoints, concrete driveway comes out highest (+6%) and concrete slab lowest (+1%), because each job leans on different trades.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,250 – $4,150+3%
Concrete driveway600 sq ft$3,800 – $9,800+6%
Paver patio300 sq ft$3,150 – $5,750+5%
Concrete slab400 sq ft$2,500 – $5,250+1%
Asphalt driveway600 sq ft$3,050 – $7,550+2%
Gravel driveway1,000 sq ft$2,600 – $10,600+4%

Quality levels and sizes in Ohio

The cited range is cut into three overlapping bands (basic, standard and premium) and scaled to statewide Ohio wages and prices. The grid prices the same bands at 3 common sizes.

Basic

$3,300 to $5,250

Basic pattern, one integral color

Standard

$4,800 to $6,750

Two-tone color release and a border

Premium

$6,250 to $8,200

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,700 – $2,700$2,450 – $3,500$3,250 – $4,250
20x20 patio (400 sq ft)$3,300 – $5,250$4,800 – $6,750$6,250 – $8,200
2-car driveway (600 sq ft)$4,950 – $7,850$7,100 – $10,000$9,250 – $12,200

Ohio metro-by-metro prices

3 of the 8 metros sit above the statewide midpoint of $5,750, and the top-to-bottom gap is 8%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
Columbus, OH$3,400 – $8,500$5,950+3%
Cleveland, OH$3,400 – $8,400$5,900+2%
Akron, OH$3,350 – $8,300$5,850+1%
Cincinnati, OH$3,300 – $8,200$5,750level
Dayton, OH$3,300 – $8,100$5,700−1%
Canton, OH$3,250 – $8,100$5,700−1%
Toledo, OH$3,250 – $8,050$5,650−2%
Youngstown, OH$3,200 – $7,900$5,550−4%

Stamped concrete: what moves the price in Ohio

  • Pattern and color

    Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

  • Sealing and vapor barrier

    Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

Wages behind the Ohio number

Statewide wages come from BLS's state-level estimates, which blend big cities with small towns and rural areas. 3 trades drive the labor line for this job, and the weighted ratio against the national wage level is 1.13 for Ohio.

For cement masons and concrete finishers (47-2051, weighted 60%) the local median is $30.28 an hour, which is 10% above the national $27.41. The middle half of them earn between $23.64 and $36.86 an hour. BLS counts 6,060 of them working in the state, 10.9 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $26.96 an hour, 19% above the US median of $22.66. The middle half of them earn between $22.09 and $35.76 an hour. About 31,910 work in the state. That is 57.5 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $31.22 an hour, which is 8% above the national $28.78. The middle half of them earn between $26.17 and $44.68 an hour. BLS counts 16,920 of them working in the state, 30.5 for every 10,000 jobs (US: 30.7), so the local bench is about average.

A crew paid at the 75th percentile for cement masons and concrete finishers ($36.86 an hour) would add about $390 to the statewide midpoint; one at the 25th percentile ($23.64) would take off about $390. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 5,550,180 jobs across Ohio (May 2025), which is 3.6% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$23.64$30.28$36.86$27.411.10state
Construction laborers (47-2061)30%$22.09$26.96$35.76$22.661.19state
Operating engineers and other construction equipment operators (47-2073)10%$26.17$31.22$44.68$28.781.08state
Blended100%1.13

How Ohio compares with nearby states

Ohio ranks 16 of 51 (the 50 states plus DC) for stamped concrete, where 1 is the most expensive. The costliest is Hawaii at $7,800 and the cheapest Arkansas at $4,850, both for 400 sq ft at the midpoint. Ohio sits at $5,750. The five states closest by workforce center are listed below.

States near Ohio, same project and size
StateDistanceRangeMidpointvs. here
West Virginia130 miles away$3,050 – $7,400$5,250−9%
Michigan180 miles away$3,250 – $8,000$5,600−2%
Indiana180 miles away$3,300 – $8,150$5,750−1%
Kentucky210 miles away$3,050 – $7,450$5,250−9%
Illinois280 miles away$3,850 – $9,600$6,700+16%

Add-ons priced for Ohio

Extras are quoted nationally and then scaled to Ohio by the average of the local wage index (1.13) and goods index (0.94), a factor of 1.03. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add a vapor barrier$210 – $410

Ohio seasons and stamped concrete

Season matters for stamped concrete. For each Ohio metro below we took NOAA's 1991-2020 monthly normals from the nearest suitable station and counted comfortable months for pouring concrete.

Columbus has the longest comfortable season of the metros we cover in Ohio at 7 months (April through October); Youngstown has the shortest at 6 (May through October). Rainfall runs from 32 inches a year in Toledo to 43 inches in Cincinnati.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Columbus2285427: April through October
Cincinnati2487437: April through October
Cleveland2481337: April through October
Dayton2087427: April through October
Akron2185336: May through October
Toledo2085326: May through October
Canton2084426: May through October
Youngstown1983416: May through October

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,800 to $6,750 for Ohio is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Ohio: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in Ohio: your questions

+How much does it cost to pour stamped concrete in Ohio?

$3,300 to $8,200 for 400 sq ft, using statewide wages and prices. Metro areas inside Ohio can sit above or below that.

+Which city in Ohio is cheapest for stamped concrete?

Youngstown at about $5,550 (midpoint, 400 sq ft). The priciest is Columbus at $5,950.

+Is stamped concrete cheaper in Ohio than the US average?

It is 3% more expensive: $5,750 against $5,600 for 400 sq ft at the midpoint.

+What share of the price is labor in Ohio?

About 53% ($3,050). Materials are 44%. Statewide labor for this job is weighted 1.13x the national wage level.

+What do cement masons and concrete finishers earn in Ohio?

The BLS statewide median is $30.28 an hour, against $27.41 for the US. The 25th to 75th percentile range is $23.64 to $36.86.

+Where does Ohio rank for stamped concrete costs?

16th most expensive of 51 (the 50 states plus DC) at the midpoint, $5,750 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium stamped concrete work cost in Ohio?

For 400 sq ft, basic work runs $3,300 to $5,250 and premium work $6,250 to $8,200. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+Does the season matter for stamped concrete in Ohio?

Yes where winters or summers are hard. Of the Ohio metros we cover, Columbus has the most comfortable months (7 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add a vapor barrier" add in Ohio?

$210 to $410 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Stamped concrete by city in Ohio

Stamped concrete: all pricesOhio cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.