Concrete patio cost in Ohio

Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (300 sq ft)
$1,250 – $4,150
Per sq ft
$4 – $12.50
before permit
Versus US midpoint
+3%
US $2,650
Metros covered
8

Ohio prices for concrete patio: $1,250 to $4,150 for 300 sq ft, or $4 to $12.50 per sq ft without the permit. The state midpoint is 3% above the national one. Local wages for cement masons and concrete finishers are $30.28 an hour.

Inside Ohio, the metros we cover range from $2,600 (Youngstown) to $2,800 (Columbus) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Ohio (statewide), standard level

$2,100 to $3,300

About $6.60 to $10 per sq ft before permits. Labor is about 56% of the bill.

Cost breakdown
PartLowHigh
Materials$870$1,100
Labor$1,100$1,900
Permits and fees$140$270
Total$2,100$3,300
Save and get a PDF report

Cost breakdown for 300 sq ft in Ohio

Part of the jobLowMidpointHighShare
Materials$700$980$1,25036%
Labor$500$1,500$2,50056%
Permits and fees$45$210$3708%
Total$1,250$2,700$4,150100%

Which Ohio city is cheapest for concrete patio?

3 of the 8 metros sit above the statewide midpoint of $2,700, and the top-to-bottom gap is 9%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (300 sq ft)Midpointvs. state
Columbus, OH$1,300 – $4,350$2,800+4%
Cleveland, OH$1,250 – $4,250$2,750+2%
Akron, OH$1,250 – $4,200$2,750+1%
Cincinnati, OH$1,250 – $4,150$2,700level
Dayton, OH$1,250 – $4,100$2,650−1%
Canton, OH$1,250 – $4,050$2,650−2%
Toledo, OH$1,250 – $4,050$2,650−2%
Youngstown, OH$1,200 – $3,950$2,600−4%

Ohio versus the states around it

Ohio ranks 16 of 51 (the 50 states plus DC) for concrete patio, where 1 is the most expensive. The costliest is Hawaii at $3,650 and the cheapest Arkansas at $2,250, both for 300 sq ft at the midpoint. Ohio sits at $2,700. The five states closest by workforce center are listed below.

States near Ohio, same project and size
StateDistanceRangeMidpointvs. here
West Virginia130 miles away$1,150 – $3,650$2,400−10%
Michigan180 miles away$1,250 – $4,050$2,650−2%
Indiana180 miles away$1,250 – $4,100$2,700−1%
Kentucky210 miles away$1,200 – $3,700$2,450−9%
Illinois280 miles away$1,450 – $4,850$3,150+17%

Weather windows across Ohio

Weather decides when pouring concrete can happen, and Ohio is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.

Columbus has the longest comfortable season of the metros we cover in Ohio at 7 months (April through October); Youngstown has the shortest at 6 (May through October). Rainfall runs from 32 inches a year in Toledo to 43 inches in Cincinnati.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Columbus2285427: April through October
Cincinnati2487437: April through October
Cleveland2481337: April through October
Dayton2087427: April through October
Akron2185336: May through October
Toledo2085326: May through October
Canton2084426: May through October
Youngstown1983416: May through October

Ohio labor market for concrete patio

Ohio's labor line is priced from 4 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 1.12 times the national level.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $30.28 an hour, 10% above the US median of $27.41. The middle half of them earn between $23.64 and $36.86 an hour. About 6,060 work in the state. That is 10.9 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $26.96 an hour, which is 19% above the national $22.66. The middle half of them earn between $22.09 and $35.76 an hour. BLS counts 31,910 of them working in the state, 57.5 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Carpenters (47-2031), 10% of the weighting: a median of $29.24 an hour, in line with the US median of $29.12. The middle half of them earn between $23.42 and $36.47 an hour. About 18,450 work in the state. That is 33.2 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $31.22 an hour, 8% above the US median of $28.78. The middle half of them earn between $26.17 and $44.68 an hour. About 16,920 work in the state. That is 30.5 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

A crew paid at the 75th percentile for cement masons and concrete finishers ($36.86 an hour) would add about $160 to the statewide midpoint; one at the 25th percentile ($23.64) would take off about $160. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 5,550,180 jobs across Ohio (May 2025), which is 3.6% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$23.64$30.28$36.86$27.411.10state
Construction laborers (47-2061)30%$22.09$26.96$35.76$22.661.19state
Carpenters (47-2031)10%$23.42$29.24$36.47$29.121.00state
Operating engineers and other construction equipment operators (47-2073)10%$26.17$31.22$44.68$28.781.08state
Blended100%1.12

Add-ons priced for Ohio

Add-ons start from national price ranges and are scaled by 1.03 for Ohio, which is the average of the area's wage index (1.12) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$920 – $3,100

Basic, standard or premium: Ohio prices

Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,250 to $2,400

Plain gray slab, broom finish, flat yard

Standard

$2,100 to $3,300

Colored or stained, saw-cut joints, minor grading

Premium

$3,000 to $4,150

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$450 – $920$800 – $1,300$1,150 – $1,650
12x16 (192 sq ft)$820 – $1,600$1,400 – $2,200$2,000 – $2,800
20x20 (400 sq ft)$1,650 – $3,150$2,800 – $4,300$3,900 – $5,400

Why two Ohio quotes can differ

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

Other Ohio jobs that often go with concrete patio

Each project weights the trades differently, so Ohio's wage level does not push every price by the same amount. Compared with the US midpoint, concrete driveway is +6% and wood deck −2%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,500 – $5,250+1%
Stamped concrete400 sq ft$3,300 – $8,200+3%
Paver patio300 sq ft$3,150 – $5,750+5%
Wood deck300 sq ft$7,400 – $14,900−2%
Concrete driveway600 sq ft$3,800 – $9,800+6%
Asphalt driveway600 sq ft$3,050 – $7,550+2%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,100 to $3,300 for Ohio is attached.

Take this estimate with you: PDF report, $9

The report lays out the concrete patio numbers for Ohio line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Ohio: your questions

+How much does it cost to pour a concrete patio in Ohio?

$1,250 to $4,150 for 300 sq ft, using statewide wages and prices. Metro areas inside Ohio can sit above or below that.

+Which city in Ohio is cheapest for concrete patio?

Youngstown at about $2,600 (midpoint, 300 sq ft). The priciest is Columbus at $2,800.

+Is concrete patio cheaper in Ohio than the US average?

It is 3% more expensive: $2,700 against $2,650 for 300 sq ft at the midpoint.

+What share of the price is labor in Ohio?

About 56% ($1,500). Materials are 36%. Statewide labor for this job is weighted 1.12x the national wage level.

+What do cement masons and concrete finishers earn in Ohio?

The BLS statewide median is $30.28 an hour, against $27.41 for the US. The 25th to 75th percentile range is $23.64 to $36.86.

+Where does Ohio rank for concrete patio costs?

16th most expensive of 51 (the 50 states plus DC) at the midpoint, $2,700 for 300 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete patio work cost in Ohio?

For 300 sq ft, basic work runs $1,250 to $2,400 and premium work $3,000 to $4,150. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+Does the season matter for concrete patio in Ohio?

Yes where winters or summers are hard. Of the Ohio metros we cover, Columbus has the most comfortable months (7 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add an acid or water-based stain" add in Ohio?

$920 to $3,100 for 300 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete patio by city in Ohio

Concrete patio: all pricesOhio cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.