Skip to content
CostLocal

Concrete patio cost in Toledo, OH

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,250 – $4,050
Per sq ft
$3.95 – $12.50
before permit
Versus US midpoint
+1%
US $2,650
Rank of 300 metros
#121
1 = most expensive

A concrete patio in Toledo, OH usually costs $1,250 to $4,050 for 300 sq ft. That works out to about $3.95 to $12.50 per sq ft before permits. That is within a few percent of the national midpoint, so there is little local premium or discount. Cement masons and concrete finishers earn a median of $29.90 an hour in the Toledo area, 9% above the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Toledo, OH, standard level

$2,100 to $3,200

About $6.45 to $9.80 per sq ft before permits. Labor is about 55% of the bill.

Cost breakdown
PartLowHigh
Materials$870$1,100
Labor$1,050$1,850
Permits and fees$140$270
Total$2,100$3,200
Save and get a PDF report

Cost breakdown for 300 sq ft in Toledo, OH

Part of the jobLowMidpointHighShare
Materials$700$980$1,25037%
Labor$480$1,450$2,40055%
Permits and fees$45$210$3708%
Total$1,250$2,650$4,050100%

What is behind the Toledo number

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, carpenters at 10%, operating engineers and other construction equipment operators at 10%. Weighted together, Toledo wages are 1.08 times the national level. Labor makes up about 55% of the midpoint estimate (51% at national prices).

Materials are scaled with BEA's regional price parity for goods. Toledo is at 93.6 against 100 for the US, so a materials line of $1,050 nationally becomes $980 here (midpoint, 300 sq ft). Permits follow the all-items index of 91.5: $45 to $370.

Toledo weather and the concrete patio calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Toledo Metcalf Fld (10 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Toledo are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Toledo gets about 32 inches of precipitation in a normal year. The wettest months are April, May and August (3.5 inches in May). Inside the workable window, September and October are the driest, at 3.1 and 2.4 inches. The station averages about 18 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Toledo Metcalf Fld (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan34201.8Cold
Feb36221.8Cold
Mar47292.3Cold
Apr60403.3Cold
May71513.5Workable
Jun81613.2Workable
Jul85653.2Workable
Aug82633.5Workable
Sep76553.1Workable
Oct64452.4Workable
Nov50342.3Cold
Dec38262.1Cold

Cost by quality level and size in Toledo

The cited range is split into basic, standard and premium bands, then scaled to Toledo. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,250 to $2,350

Plain gray slab, broom finish, flat yard

Standard

$2,100 to $3,200

Colored or stained, saw-cut joints, minor grading

Premium

$2,900 to $4,050

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$440 – $900$790 – $1,250$1,150 – $1,600
12x16 (192 sq ft)$810 – $1,550$1,400 – $2,150$1,950 – $2,750
20x20 (400 sq ft)$1,650 – $3,100$2,700 – $4,200$3,800 – $5,300

How Toledo compares

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 300 sq ft range from $2,650 to $2,800 across Toledo and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Toledo, OHthis page$1,250 – $4,050$2,650
Ann Arbor, MI50 miles$1,250 – $4,050$2,650level
Detroit, MI85 miles$1,300 – $4,300$2,800+6%
Fort Wayne, IN85 miles$1,250 – $4,050$2,650level
Lansing, MI95 miles$1,250 – $4,100$2,700+1%
Flint, MI100 miles$1,250 – $4,150$2,700+2%
Ohio (statewide)$1,250 – $4,150$2,700+2%
United States$1,250 – $4,000$2,650−1%

Out of the 300 metros we cover, Toledo ranks #121 for the cost of this job (#1 is the most expensive). Statewide, Toledo is 2% below the Ohio figure.

Elsewhere in Ohio

Ohio metros compared with Toledo
MetroSizeRangeMidpointvs. here
Columbus, OH1,105,580 jobs$1,300 – $4,350$2,800+6%
Cincinnati, OH1,101,030 jobs$1,250 – $4,150$2,700+2%
Cleveland, OH1,031,130 jobs$1,250 – $4,250$2,750+5%
Dayton, OH372,660 jobs$1,250 – $4,100$2,650+1%
Akron, OH319,560 jobs$1,250 – $4,200$2,750+4%
Canton, OH163,080 jobs$1,250 – $4,050$2,650level

Metros of a similar size

Big cities and small ones price differently, so here is Toledo against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
McAllen, TX296,700 jobs$1,050 – $3,150$2,100−20%
Stockton, CA289,660 jobs$1,350 – $4,350$2,850+7%
Syracuse, NY300,130 jobs$1,250 – $4,100$2,700+2%
Portland, ME288,480 jobs$1,250 – $4,100$2,700+2%

Why two Toledo quotes can differ

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

What local crews earn in Toledo

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Toledo the blend is 1.08.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $29.90 an hour, 9% above the US median of $27.41. The middle half of them earn between $24.07 and $35.06 an hour. About 330 work in the metro. That is 11.3 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.

For construction laborers (47-2061, weighted 30%) the local median is $24.38 an hour, which is 8% above the national $22.66. The middle half of them earn between $21.59 and $33.94 an hour. BLS counts 1,520 of them working in the area, 52.1 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Carpenters (47-2031), 10% of the weighting: a median of $29.36 an hour, in line with the US median of $29.12. The middle half of them earn between $22.83 and $36.05 an hour. About 980 work in the metro. That is 33.6 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $30.95 an hour, 8% above the US median of $28.78. The middle half of them earn between $26.86 and $44.97 an hour. About 780 work in the metro. That is 26.8 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $130 to the midpoint estimate; the 25th percentile takes off about $140. That is a swing of roughly 5.4% to 4.8% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Toledo has 291,530 jobs in total (BLS, May 2025), ranking 87th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$24.07$29.90$35.06$27.411.09metro
Construction laborers (47-2061)30%$21.59$24.38$33.94$22.661.08metro
Carpenters (47-2031)10%$22.83$29.36$36.05$29.121.01metro
Operating engineers and other construction equipment operators (47-2073)10%$26.86$30.95$44.97$28.781.08metro
Blended100%1.08

Extras that change the Toledo total

Add-ons start from national price ranges and are scaled by 1.01 for Toledo, which is the average of the area's wage index (1.08) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$910 – $3,000

Related projects, priced for Toledo

Jobs that often go together with concrete patio are priced below at their usual sizes, using the same Toledo wage and price inputs. Compared with national midpoints, paver patio comes out highest (+3%) and wood deck lowest (−3%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,450 – $5,150−1%
Stamped concrete400 sq ft$3,250 – $8,050+1%
Paver patio300 sq ft$3,100 – $5,650+3%
Wood deck300 sq ft$7,350 – $14,700−3%
Concrete driveway600 sq ft$3,750 – $9,550+3%
Asphalt driveway600 sq ft$3,000 – $7,400−1%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,100 to $3,200 for Toledo, OH is attached.

Detailed concrete patio report for Toledo, OH, $9

Multi-page report for Toledo, OH: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Toledo: your questions

+How much does it cost to pour a concrete patio in Toledo?

For 300 sq ft, expect $1,250 to $4,050 in the Toledo area. A standard-spec job lands at $2,100 to $3,200. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Toledo?

About $3.95 to $12.50 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Toledo or Ann Arbor?

Ann Arbor is 50 miles away. The midpoint for 300 sq ft there is $2,650, which is 0% less than Toledo ($2,650). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Toledo?

About 55% at the midpoint, or $1,450 out of $2,650. Materials are 37% and permits 8%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Toledo?

$810 to $2,750. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Toledo?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the Toledo area (our national range of $50 to $400 scaled by the local price level).

+Is Toledo expensive for concrete patio compared with the rest of Ohio?

Toledo is 2% below the Ohio statewide estimate ($2,700 at the midpoint). We cover 8 metros in Ohio; see the state page to compare them.

+What do cement masons and concrete finishers earn in Toledo?

The BLS median is $29.90 an hour in the Toledo area, compared with $27.41 nationally. The 25th to 75th percentile range is $24.07 to $35.06.

+What do basic and premium concrete patio work cost in Toledo?

For 300 sq ft, basic work runs $1,250 to $2,350 and premium work $2,900 to $4,050. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Toledo?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Toledo?

$910 to $3,000 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Toledo

Concrete patio: all pricesConcrete patio in OhioAll projects in ToledoOhio cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.