Concrete slab cost in Toledo, OH
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $2,450 – $5,150
- Per sq ft
- $6.05 – $12
- before permit
- Versus US midpoint
- −1%
- US $3,850
- Rank of 300 metros
- #127
- 1 = most expensive
Toledo homeowners pay roughly $2,450 to $5,150 to pour a concrete slab at 400 sq ft, or $6.05 to $12 per sq ft (permit not included). Against the US midpoint, Toledo is almost level. Building materials run about 6% below the US average here (BEA goods price index 93.6).
Estimate your concrete slab cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Toledo, OH, standard level
$3,250 to $4,350
About $7.80 to $10 per sq ft before permits. Labor is about 45% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,550 | $2,150 |
| Labor | $1,550 | $1,900 |
| Permits and fees | $140 | $270 |
| Total | $3,250 | $4,350 |
Cost breakdown for 400 sq ft in Toledo, OH
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,100 | $1,850 | $2,600 | 49% |
| Labor | $1,300 | $1,700 | $2,150 | 45% |
| Permits and fees | $45 | $210 | $370 | 5% |
| Total | $2,450 | $3,800 | $5,150 | 100% |
Why Toledo prices look the way they do
Labor is 45% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Toledo the blended ratio comes out at 1.08.
On the materials line, the BEA goods price index for the Toledo metro is 93.6 (US = 100). The midpoint materials bill for 400 sq ft comes to $1,850, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (91.5) and land at $45 to $370.
Add-ons priced for Toledo
Extras are quoted nationally and then scaled to Toledo by the average of the local wage index (1.08) and goods index (0.94), a factor of 1.01. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add rebar reinforcement | $400 – $1,200 |
| Remove old concrete first | $810 – $2,400 |
Is Toledo cheap or dear? The local comparison
Of the five closest metros, 2 are cheaper than Toledo. Fort Wayne is the lowest at about $3,800 (midpoint, 400 sq ft), 85 miles away.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Toledo, OHthis page | $2,450 – $5,150 | $3,800 | |
| Ann Arbor, MI50 miles | $2,450 – $5,150 | $3,800 | level |
| Detroit, MI85 miles | $2,600 – $5,450 | $4,000 | +6% |
| Fort Wayne, IN85 miles | $2,450 – $5,150 | $3,800 | level |
| Lansing, MI95 miles | $2,500 – $5,200 | $3,850 | +1% |
| Flint, MI100 miles | $2,500 – $5,250 | $3,850 | +2% |
| Ohio (statewide) | $2,500 – $5,250 | $3,850 | +2% |
| United States | $2,450 – $5,200 | $3,850 | +1% |
Across 300 US metros, Toledo comes in at #127 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Toledo is 2% below the Ohio figure.
Other Ohio metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Columbus, OH | 1,105,580 jobs | $2,600 – $5,400 | $4,000 | +5% |
| Cincinnati, OH | 1,101,030 jobs | $2,500 – $5,250 | $3,850 | +2% |
| Cleveland, OH | 1,031,130 jobs | $2,550 – $5,300 | $3,950 | +4% |
| Dayton, OH | 372,660 jobs | $2,500 – $5,150 | $3,800 | +1% |
| Akron, OH | 319,560 jobs | $2,550 – $5,300 | $3,900 | +3% |
| Canton, OH | 163,080 jobs | $2,450 – $5,150 | $3,800 | level |
Cities with a workforce like Toledo's
Big cities and small ones price differently, so here is Toledo against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| McAllen, TX | 296,700 jobs | $2,000 – $4,350 | $3,200 | −16% |
| Stockton, CA | 289,660 jobs | $2,650 – $5,600 | $4,100 | +8% |
| Syracuse, NY | 300,130 jobs | $2,500 – $5,300 | $3,900 | +3% |
| Portland, ME | 288,480 jobs | $2,500 – $5,250 | $3,850 | +2% |
When to schedule concrete slab in Toledo
We use NOAA's 1991-2020 climate normals for Toledo Metcalf Fld (10 miles from the city center). These are 30-year monthly averages, not forecasts.
May through October is the stretch where pouring concrete runs into the fewest weather problems in Toledo (6 of 12 months). January, February, March, April, November and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Toledo gets about 32 inches of precipitation in a normal year. The wettest months are April, May and August (3.5 inches in May). Inside the workable window, September and October are the driest, at 3.1 and 2.4 inches. The station averages about 18 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 34 | 20 | 1.8 | Cold |
| Feb | 36 | 22 | 1.8 | Cold |
| Mar | 47 | 29 | 2.3 | Cold |
| Apr | 60 | 40 | 3.3 | Cold |
| May | 71 | 51 | 3.5 | Workable |
| Jun | 81 | 61 | 3.2 | Workable |
| Jul | 85 | 65 | 3.2 | Workable |
| Aug | 82 | 63 | 3.5 | Workable |
| Sep | 76 | 55 | 3.1 | Workable |
| Oct | 64 | 45 | 2.4 | Workable |
| Nov | 50 | 34 | 2.3 | Cold |
| Dec | 38 | 26 | 2.1 | Cold |
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Toledo is 1.08 times the national level.
For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $29.90 an hour, which is 9% above the national $27.41. The middle half of them earn between $24.07 and $35.06 an hour. BLS counts 330 of them working in the area, 11.3 for every 10,000 jobs (US: 13.3), so the local bench is about average.
Construction laborers (47-2061), 30% of the weighting: a median of $24.38 an hour, 8% above the US median of $22.66. The middle half of them earn between $21.59 and $33.94 an hour. About 1,520 work in the metro. That is 52.1 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $30.95 an hour, which is 8% above the national $28.78. The middle half of them earn between $26.86 and $44.97 an hour. BLS counts 780 of them working in the area, 26.8 for every 10,000 jobs (US: 30.7), so the local bench is about average.
For carpenters (47-2031, weighted 10%) the local median is $29.36 an hour, which is in line with the national $29.12. The middle half of them earn between $22.83 and $36.05 an hour. BLS counts 980 of them working in the area, 33.6 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($35.06 an hour) instead of the median, the labor line grows by about $150. At the 25th percentile ($24.07) it shrinks by about $170. The total moves by 4.0% or 4.5%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 291,530 jobs in the Toledo area. That makes it the 87th largest of the 300 metros we cover, with 0.19% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 50% | $24.07 | $29.90 | $35.06 | $27.41 | 1.09 | metro |
| Construction laborers (47-2061) | 30% | $21.59 | $24.38 | $33.94 | $22.66 | 1.08 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $26.86 | $30.95 | $44.97 | $28.78 | 1.08 | metro |
| Carpenters (47-2031) | 10% | $22.83 | $29.36 | $36.05 | $29.12 | 1.01 | metro |
| Blended | 100% | 1.08 | |||||
Planning more than one job in Toledo?
Because every project leans on different trades, Toledo's wage level does not move all prices equally. Against the US midpoint, concrete driveway runs +3% and asphalt driveway −1%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete driveway | 600 sq ft | $3,750 – $9,550 | +3% |
| Concrete patio | 300 sq ft | $1,250 – $4,050 | +1% |
| Detached garage | 576 sq ft | $28,800 – $57,800 | −1% |
| Stamped concrete | 400 sq ft | $3,250 – $8,050 | +1% |
| Asphalt driveway | 600 sq ft | $3,000 – $7,400 | −1% |
| Gravel driveway | 1,000 sq ft | $2,500 – $10,200 | +1% |
Concrete slab: what moves the price in Toledo
Base and reinforcement
A compacted gravel base, vapor barrier, and wire mesh or rebar are priced separately by some contractors and bundled by others. Ask which one your quote does.
Truck and pump access
If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.
Small-job minimums
Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.
Toledo: what basic, standard and premium work costs
Three bands are cut from the same cited range and localized for Toledo wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.
Basic
$2,450 to $3,550
4-inch broom-finish slab, light mesh, easy truck access
Standard
$3,250 to $4,350
4-5 inch slab with rebar or heavier mesh and standard base prep
Premium
$4,050 to $5,150
6-inch slab, heavy reinforcement, thick base, pump truck or tight access
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x10 pad (100 sq ft) | $650 – $1,000 | $920 – $1,300 | $1,200 – $1,550 |
| 12x12 (144 sq ft) | $920 – $1,400 | $1,250 – $1,750 | $1,600 – $2,100 |
| 20x20 (400 sq ft) | $2,450 – $3,550 | $3,250 – $4,350 | $4,050 – $5,150 |
| 24x24 garage floor (576 sq ft) | $3,500 – $5,000 | $4,650 – $6,150 | $5,750 – $7,250 |
| 30x40 foundation (1,200 sq ft) | $7,300 – $10,300 | $9,500 – $12,500 | $11,700 – $14,700 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,250 to $4,350 for Toledo, OH is attached.
Detailed concrete slab report for Toledo, OH, $9
The report lays out the concrete slab numbers for Toledo, OH line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Concrete slab in Toledo: your questions
+How much does it cost to pour a concrete slab in Toledo?
For 400 sq ft, expect $2,450 to $5,150 in the Toledo area. A standard-spec job lands at $3,250 to $4,350. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for concrete slab in Toledo?
About $6.05 to $12 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $6 to $12.
+Is concrete slab cheaper in Toledo or Ann Arbor?
Ann Arbor is 50 miles away. The midpoint for 400 sq ft there is $3,800, which is 0% less than Toledo ($3,800). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Toledo?
About 45% at the midpoint, or $1,700 out of $3,800. Materials are 49% and permits 5%. Nationally, labor is 42%.
+What would 20x20 (400 sq ft) cost in Toledo?
$2,450 to $5,150. Pick a different size in the estimator above to get your own number.
+Does concrete slab need a permit in Toledo?
Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the Toledo area (our national range of $50 to $400 scaled by the local price level).
+Is Toledo expensive for concrete slab compared with the rest of Ohio?
Toledo is 2% below the Ohio statewide estimate ($3,850 at the midpoint). We cover 8 metros in Ohio; see the state page to compare them.
+What do cement masons and concrete finishers earn in Toledo?
The BLS median is $29.90 an hour in the Toledo area, compared with $27.41 nationally. The 25th to 75th percentile range is $24.07 to $35.06.
+What do basic and premium concrete slab work cost in Toledo?
For 400 sq ft, basic work runs $2,450 to $3,550 and premium work $4,050 to $5,150. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.
+When is the best time to pour a concrete slab in Toledo?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add rebar reinforcement" add in Toledo?
$400 to $1,200 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Concrete slab near Toledo
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Concrete Slab Cost? (2026) (accessed November 4, 2026)
- Estimators.us: Concrete Slab Cost in 2026 | $6-$12/Sq Ft Guide (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Patio Cost? (2026) (accessed November 4, 2026)
- HomeGuide: How Much Does a Concrete Driveway Cost? (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020