Concrete patio cost in Youngstown, OH

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,200 – $3,950
Per sq ft
$3.90 – $12
before permit
Versus US midpoint
−2%
US $2,650
Rank of 300 metros
#142
1 = most expensive

Local price for a concrete patio in the Youngstown area: $1,200 to $3,950 for 300 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint lands close to the US figure. Building materials run about 6% below the US average here (BEA goods price index 93.6).

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Youngstown, OH, standard level

$2,050 to $3,150

About $6.35 to $9.55 per sq ft before permits. Labor is about 54% of the bill.

Cost breakdown
PartLowHigh
Materials$870$1,100
Labor$1,050$1,750
Permits and fees$140$260
Total$2,050$3,150
Save and get a PDF report

Cost breakdown for 300 sq ft in Youngstown, OH

Part of the jobLowMidpointHighShare
Materials$700$980$1,25038%
Labor$470$1,400$2,35054%
Permits and fees$45$200$3508%
Total$1,200$2,600$3,950100%

Why Youngstown prices look the way they do

Labor is 54% of the midpoint bill here, against 51% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), carpenters (10%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Youngstown the blended ratio comes out at 1.04.

Materials are scaled with BEA's regional price parity for goods. Youngstown is at 93.6 against 100 for the US, so a materials line of $1,050 nationally becomes $980 here (midpoint, 300 sq ft). Permits follow the all-items index of 87.4: $45 to $350.

What nearby projects cost in Youngstown

Jobs that often go together with concrete patio are priced below at their usual sizes, using the same Youngstown wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (+3%) and wood deck lowest (−5%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,400 – $5,050−2%
Stamped concrete400 sq ft$3,200 – $7,900−1%
Paver patio300 sq ft$2,900 – $5,300−3%
Wood deck300 sq ft$7,150 – $14,300−5%
Concrete driveway600 sq ft$3,650 – $9,250level
Asphalt driveway600 sq ft$3,100 – $7,650+3%

Add-ons priced for Youngstown

Add-ons start from national price ranges and are scaled by 0.99 for Youngstown, which is the average of the area's wage index (1.04) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$890 – $2,950

Why two Youngstown quotes can differ

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

Youngstown against nearby metros and the rest of Ohio

Same job, same size (300 sq ft), priced for the nearest metros. Cleveland is the priciest of the group at $2,750.

Comparison with nearby areas
AreaRangeMidpointvs. here
Youngstown, OHthis page$1,200 – $3,950$2,600
Akron, OH30 miles$1,250 – $4,200$2,750+6%
Canton, OH40 miles$1,250 – $4,050$2,650+3%
Cleveland, OH45 miles$1,250 – $4,250$2,750+7%
Pittsburgh, PA70 miles$1,300 – $4,150$2,750+6%
Erie, PA75 miles$1,250 – $4,000$2,600+1%
Ohio (statewide)$1,250 – $4,150$2,700+5%
United States$1,250 – $4,000$2,650+2%

Out of the 300 metros we cover, Youngstown ranks #142 for the cost of this job (#1 is the most expensive). Statewide, Youngstown is 4% below the Ohio figure.

Elsewhere in Ohio

Ohio metros compared with Youngstown
MetroSizeRangeMidpointvs. here
Columbus, OH1,105,580 jobs$1,300 – $4,350$2,800+9%
Cincinnati, OH1,101,030 jobs$1,250 – $4,150$2,700+5%
Cleveland, OH1,031,130 jobs$1,250 – $4,250$2,750+7%
Dayton, OH372,660 jobs$1,250 – $4,100$2,650+3%
Akron, OH319,560 jobs$1,250 – $4,200$2,750+6%
Toledo, OH291,530 jobs$1,250 – $4,050$2,650+2%

Metros of a similar size

Big cities and small ones price differently, so here is Youngstown against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Waterbury, CT160,710 jobs$1,300 – $4,250$2,750+7%
Gulfport, MS158,310 jobs$1,100 – $3,350$2,200−14%
Shreveport, LA162,750 jobs$1,100 – $3,450$2,300−11%
Eugene, OR157,710 jobs$1,300 – $4,200$2,750+7%

Who does the work: Youngstown trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Youngstown the blend is 1.04.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $29.36 an hour, 7% above the US median of $27.41. The middle half of them earn between $23.83 and $37.86 an hour. About 200 work in the metro. That is 12.5 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.

For construction laborers (47-2061, weighted 30%) the local median is $23.36 an hour, which is 3% above the national $22.66. The middle half of them earn between $18.83 and $31.39 an hour. BLS counts 850 of them working in the area, 53.1 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Carpenters (47-2031), 10% of the weighting: a median of $27.39 an hour, 6% below the US median of $29.12. The middle half of them earn between $21.75 and $35.03 an hour. About 460 work in the metro. That is 28.7 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $28.47 an hour, in line with the US median of $28.78. The middle half of them earn between $24.54 and $40.17 an hour. About 420 work in the metro. That is 26.2 per 10,000 jobs, compared with 30.7 nationally, so the supply of crews looks typical.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $210 to the midpoint estimate; the 25th percentile takes off about $140. That is a swing of roughly 5.3% to 8.1% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Youngstown-Warren has 160,160 jobs in total (BLS, May 2025), ranking 148th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$23.83$29.36$37.86$27.411.07metro
Construction laborers (47-2061)30%$18.83$23.36$31.39$22.661.03metro
Carpenters (47-2031)10%$21.75$27.39$35.03$29.120.94metro
Operating engineers and other construction equipment operators (47-2073)10%$24.54$28.47$40.17$28.780.99metro
Blended100%1.04

Cost by quality level and size in Youngstown

The cited range is split into basic, standard and premium bands, then scaled to Youngstown. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,200 to $2,300

Plain gray slab, broom finish, flat yard

Standard

$2,050 to $3,150

Colored or stained, saw-cut joints, minor grading

Premium

$2,850 to $3,950

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$430 – $880$770 – $1,200$1,100 – $1,550
12x16 (192 sq ft)$790 – $1,550$1,350 – $2,100$1,900 – $2,650
20x20 (400 sq ft)$1,600 – $3,000$2,650 – $4,100$3,750 – $5,150

The best months for concrete patio in Youngstown

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Youngstown Rgnl Ap (10 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Youngstown are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Youngstown gets about 41 inches of precipitation in a normal year, including roughly 68 inches of snow. The wettest months are June, July and September (4.3 inches in July). Inside the workable window, August and October are the driest, at 3.5 and 3.3 inches. The station averages about 8 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Youngstown Rgnl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan34193.0Cold
Feb37212.5Cold
Mar47283.2Cold
Apr60383.8Cold
May71483.7Workable
Jun79563.9Workable
Jul83604.3Workable
Aug81593.5Workable
Sep74523.8Workable
Oct62423.3Workable
Nov50333.0Cold
Dec39263.2Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,050 to $3,150 for Youngstown, OH is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Youngstown, OH: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Youngstown: your questions

+How much does it cost to pour a concrete patio in Youngstown?

For 300 sq ft, expect $1,200 to $3,950 in the Youngstown area. A standard-spec job lands at $2,050 to $3,150. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Youngstown?

About $3.90 to $12 per sq ft for materials and labor, plus $45 to $350 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Youngstown or Akron?

Akron is 30 miles away. The midpoint for 300 sq ft there is $2,750, which is 6% more than Youngstown ($2,600). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Youngstown?

About 54% at the midpoint, or $1,400 out of $2,600. Materials are 38% and permits 8%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Youngstown?

$790 to $2,650. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Youngstown?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $350 for fees in the Youngstown area (our national range of $50 to $400 scaled by the local price level).

+Is Youngstown expensive for concrete patio compared with the rest of Ohio?

Youngstown is 4% below the Ohio statewide estimate ($2,700 at the midpoint). We cover 8 metros in Ohio; see the state page to compare them.

+What do cement masons and concrete finishers earn in Youngstown?

The BLS median is $29.36 an hour in the Youngstown area, compared with $27.41 nationally. The 25th to 75th percentile range is $23.83 to $37.86.

+What do basic and premium concrete patio work cost in Youngstown?

For 300 sq ft, basic work runs $1,200 to $2,300 and premium work $2,850 to $3,950. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Youngstown?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. August and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Youngstown?

$890 to $2,950 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Youngstown

Concrete patio: all pricesConcrete patio in OhioAll projects in YoungstownOhio cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.