Skip to content
CostLocal

Concrete patio cost in Waterbury, CT

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,300 – $4,250
Per sq ft
$4.10 – $13
before permit
Versus US midpoint
+5%
US $2,650
Rank of 300 metros
#72
1 = most expensive

Local price for a concrete patio in the Waterbury area: $1,300 to $4,250 for 300 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 5% higher than the US figure. Cement masons and concrete finishers earn a median of $28.66 an hour in the Waterbury area, 5% above the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Waterbury, CT, standard level

$2,150 to $3,350

About $6.70 to $10 per sq ft before permits. Labor is about 55% of the bill.

Cost breakdown
PartLowHigh
Materials$910$1,150
Labor$1,100$1,900
Permits and fees$150$290
Total$2,150$3,350
Save and get a PDF report

Cost breakdown for 300 sq ft in Waterbury, CT

Part of the jobLowMidpointHighShare
Materials$730$1,000$1,30037%
Labor$500$1,500$2,50055%
Permits and fees$50$220$4008%
Total$1,300$2,750$4,250100%

What is behind the Waterbury number

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, carpenters at 10%, operating engineers and other construction equipment operators at 10%. Weighted together, Waterbury wages are 1.12 times the national level. Labor makes up about 55% of the midpoint estimate (51% at national prices).

Materials are scaled with BEA's regional price parity for goods. Waterbury is at 97.3 against 100 for the US, so a materials line of $1,050 nationally becomes $1,000 here (midpoint, 300 sq ft). Permits follow the all-items index of 99.8: $50 to $400.

Who does the work: Waterbury trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Waterbury the blend is 1.12.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $28.66 an hour, 5% above the US median of $27.41. The middle half of them earn between $23.29 and $30.98 an hour. About 140 work in the metro. That is 8.7 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $27.27 an hour, which is 20% above the national $22.66. The middle half of them earn between $22.50 and $34.43 an hour. BLS counts 840 of them working in the area, 52.3 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Carpenters (47-2031), 10% of the weighting: a median of $29.93 an hour, in line with the US median of $29.12. The middle half of them earn between $25.24 and $37.00 an hour. About 460 work in the metro. That is 28.6 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $37.66 an hour, 31% above the US median of $28.78. The middle half of them earn between $31.25 and $48.43 an hour. About 300 work in the metro. That is 18.7 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $55 to the midpoint estimate; the 25th percentile takes off about $130. That is a swing of roughly 4.8% to 2.1% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Waterbury-Shelton has 160,710 jobs in total (BLS, May 2025), ranking 147th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$23.29$28.66$30.98$27.411.05metro
Construction laborers (47-2061)30%$22.50$27.27$34.43$22.661.20metro
Carpenters (47-2031)10%$25.24$29.93$37.00$29.121.03metro
Operating engineers and other construction equipment operators (47-2073)10%$31.25$37.66$48.43$28.781.31metro
Blended100%1.12

Is Waterbury cheap or dear? The local comparison

Of the five closest metros, 1 is cheaper than Waterbury. Hartford is the lowest at about $2,750 (midpoint, 300 sq ft), 30 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Waterbury, CTthis page$1,300 – $4,250$2,750
New Haven, CT20 miles$1,300 – $4,400$2,850+3%
Bridgeport, CT25 miles$1,300 – $4,300$2,800+2%
Hartford, CT30 miles$1,250 – $4,200$2,750−1%
Springfield, MA50 miles$1,300 – $4,400$2,850+4%
Poughkeepsie, NY50 miles$1,400 – $4,450$2,900+5%
Connecticut (statewide)$1,300 – $4,250$2,750+1%
United States$1,250 – $4,000$2,650−5%

Out of the 300 metros we cover, Waterbury ranks #72 for the cost of this job (#1 is the most expensive). Statewide, Waterbury is 1% below the Connecticut figure.

Elsewhere in Connecticut

Connecticut metros compared with Waterbury
MetroSizeRangeMidpointvs. here
Hartford, CT599,770 jobs$1,250 – $4,200$2,750−1%
Bridgeport, CT404,180 jobs$1,300 – $4,300$2,800+2%
New Haven, CT281,410 jobs$1,300 – $4,400$2,850+3%
Norwich, CT126,450 jobs$1,250 – $4,100$2,700−3%

Metros of a similar size

Big cities and small ones price differently, so here is Waterbury against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Shreveport, LA162,750 jobs$1,100 – $3,450$2,300−17%
Youngstown, OH160,160 jobs$1,200 – $3,950$2,600−6%
Canton, OH163,080 jobs$1,250 – $4,050$2,650−4%
Gulfport, MS158,310 jobs$1,100 – $3,350$2,200−20%

Pick a size, pick a tier: concrete patio pricing in Waterbury

The cited range is split into basic, standard and premium bands, then scaled to Waterbury. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,300 to $2,450

Plain gray slab, broom finish, flat yard

Standard

$2,150 to $3,350

Colored or stained, saw-cut joints, minor grading

Premium

$3,050 to $4,250

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$460 – $950$830 – $1,300$1,200 – $1,700
12x16 (192 sq ft)$840 – $1,650$1,450 – $2,250$2,050 – $2,850
20x20 (400 sq ft)$1,700 – $3,200$2,850 – $4,350$4,000 – $5,500

The best months for concrete patio in Waterbury

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Meriden Markham Muni Ap (10 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Waterbury are May through October: 6 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Waterbury gets about 45 inches of precipitation in a normal year. The wettest months are April, September and October (4.5 inches in October). Inside the workable window, May and July are the driest, at 3.5 and 3.4 inches. The station averages about 15 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Meriden Markham Muni Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan37193.0Cold
Feb39202.9Cold
Mar48284.0Cold
Apr60384.1Cold
May70483.5Workable
Jun79574.0Workable
Jul84633.4Workable
Aug82613.5Workable
Sep75544.3Workable
Oct64424.5Workable
Nov52323.4Cold
Dec42254.1Cold

Planning more than one job in Waterbury?

Jobs that often go together with concrete patio are priced below at their usual sizes, using the same Waterbury wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (+12%) and wood deck lowest (+1%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,550 – $5,350+4%
Stamped concrete400 sq ft$3,350 – $8,350+4%
Paver patio300 sq ft$3,250 – $5,950+9%
Wood deck300 sq ft$7,650 – $15,300+1%
Concrete driveway600 sq ft$3,850 – $9,900+7%
Asphalt driveway600 sq ft$3,350 – $8,400+12%

Specs and site conditions that change a Waterbury bid

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

Add-ons priced for Waterbury

Add-ons start from national price ranges and are scaled by 1.05 for Waterbury, which is the average of the area's wage index (1.12) and goods price index (0.97). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$940 – $3,150

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,150 to $3,350 for Waterbury, CT is attached.

Detailed concrete patio report for Waterbury, CT, $9

Multi-page report for Waterbury, CT: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Waterbury: your questions

+How much does it cost to pour a concrete patio in Waterbury?

For 300 sq ft, expect $1,300 to $4,250 in the Waterbury area. A standard-spec job lands at $2,150 to $3,350. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Waterbury?

About $4.10 to $13 per sq ft for materials and labor, plus $50 to $400 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Waterbury or New Haven?

New Haven is 20 miles away. The midpoint for 300 sq ft there is $2,850, which is 3% more than Waterbury ($2,750). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Waterbury?

About 55% at the midpoint, or $1,500 out of $2,750. Materials are 37% and permits 8%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Waterbury?

$840 to $2,850. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Waterbury?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $400 for fees in the Waterbury area (our national range of $50 to $400 scaled by the local price level).

+Is Waterbury expensive for concrete patio compared with the rest of Connecticut?

Waterbury is 1% below the Connecticut statewide estimate ($2,750 at the midpoint). We cover 5 metros in Connecticut; see the state page to compare them.

+What do cement masons and concrete finishers earn in Waterbury?

The BLS median is $28.66 an hour in the Waterbury area, compared with $27.41 nationally. The 25th to 75th percentile range is $23.29 to $30.98.

+What do basic and premium concrete patio work cost in Waterbury?

For 300 sq ft, basic work runs $1,300 to $2,450 and premium work $3,050 to $4,250. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Waterbury?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through October. May and July are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Waterbury?

$940 to $3,150 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Waterbury

Concrete patio: all pricesConcrete patio in ConnecticutAll projects in WaterburyConnecticut cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.