Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (300 sq ft)
$1,300 – $4,250
Per sq ft
$4.10 – $13
before permit
Versus US midpoint
+6%
US $2,650
Metros covered
5

What does it cost to pour a concrete patio in Connecticut? Plan on $1,300 to $4,250 for 300 sq ft. Wages (1.12x the US blend), materials (price index 97.3) and permit costs (103.6) put the state above the national midpoint by 6%.

Inside Connecticut, the metros we cover range from $2,700 (Norwich) to $2,850 (New Haven) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Connecticut (statewide), standard level

$2,200 to $3,350

About $6.70 to $10 per sq ft before permits. Labor is about 55% of the bill.

Cost breakdown
PartLowHigh
Materials$910$1,150
Labor$1,100$1,900
Permits and fees$160$310
Total$2,200$3,350
Save and get a PDF report

Cost breakdown for 300 sq ft in Connecticut

Part of the jobLowMidpointHighShare
Materials$730$1,000$1,30037%
Labor$510$1,500$2,55055%
Permits and fees$50$230$4108%
Total$1,300$2,750$4,250100%

Why two Connecticut quotes can differ

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

If you are planning more than one job in Connecticut

Each project weights the trades differently, so Connecticut's wage level does not push every price by the same amount. Compared with the US midpoint, asphalt driveway is +13% and wood deck +3%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,550 – $5,400+4%
Stamped concrete400 sq ft$3,350 – $8,350+5%
Paver patio300 sq ft$3,300 – $6,000+10%
Wood deck300 sq ft$7,750 – $15,500+3%
Concrete driveway600 sq ft$3,900 – $9,950+8%
Asphalt driveway600 sq ft$3,350 – $8,450+13%

Extras that change the Connecticut total

Add-ons start from national price ranges and are scaled by 1.05 for Connecticut, which is the average of the area's wage index (1.12) and goods price index (0.97). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$940 – $3,150

How Connecticut compares with nearby states

Connecticut ranks 12 of 51 (the 50 states plus DC) for concrete patio, where 1 is the most expensive. The costliest is Hawaii at $3,650 and the cheapest Arkansas at $2,250, both for 300 sq ft at the midpoint. Connecticut sits at $2,750. The five states closest by workforce center are listed below.

States near Connecticut, same project and size
StateDistanceRangeMidpointvs. here
New York80 miles away$1,400 – $4,500$2,950+7%
Rhode Island80 miles away$1,300 – $4,250$2,750level
Massachusetts110 miles away$1,350 – $4,500$2,900+5%
New Hampshire110 miles away$1,250 – $4,000$2,600−6%
New Jersey150 miles away$1,400 – $4,600$3,000+8%

Weather windows across Connecticut

Weather decides when pouring concrete can happen, and Connecticut is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.

Bridgeport has the longest comfortable season of the metros we cover in Connecticut at 7 months (April through October); Norwich has the shortest at 6 (May through October). Rainfall runs from 42 inches a year in New Haven to 52 inches in Norwich.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
Hartford2085436: May through October
Bridgeport2483447: April through October
New Haven2382426: May through October
Waterbury1984456: May through October
Norwich2184526: May through October

Wages behind the Connecticut number

Connecticut's labor line is priced from 4 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 1.12 times the national level.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $28.19 an hour, in line with the US median of $27.41. The middle half of them earn between $23.34 and $31.41 an hour. About 610 work in the state. That is 3.6 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $28.03 an hour, which is 24% above the national $22.66. The middle half of them earn between $22.92 and $34.98 an hour. BLS counts 7,360 of them working in the state, 43.4 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Carpenters (47-2031), 10% of the weighting: a median of $30.80 an hour, 6% above the US median of $29.12. The middle half of them earn between $27.66 and $38.86 an hour. About 5,160 work in the state. That is 30.4 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $37.86 an hour, 32% above the US median of $28.78. The middle half of them earn between $31.11 and $48.85 an hour. About 2,860 work in the state. That is 16.9 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A crew paid at the 75th percentile for cement masons and concrete finishers ($31.41 an hour) would add about $80 to the statewide midpoint; one at the 25th percentile ($23.34) would take off about $120. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 1,696,170 jobs across Connecticut (May 2025), which is 1.1% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$23.34$28.19$31.41$27.411.03state
Construction laborers (47-2061)30%$22.92$28.03$34.98$22.661.24state
Carpenters (47-2031)10%$27.66$30.80$38.86$29.121.06state
Operating engineers and other construction equipment operators (47-2073)10%$31.11$37.86$48.85$28.781.32state
Blended100%1.12

Basic, standard or premium: Connecticut prices

Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,300 to $2,450

Plain gray slab, broom finish, flat yard

Standard

$2,200 to $3,350

Colored or stained, saw-cut joints, minor grading

Premium

$3,050 to $4,250

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$460 – $960$830 – $1,350$1,200 – $1,700
12x16 (192 sq ft)$840 – $1,650$1,450 – $2,250$2,050 – $2,850
20x20 (400 sq ft)$1,700 – $3,250$2,850 – $4,400$4,000 – $5,550

Concrete patio cost by metro in Connecticut

2 of the 5 metros sit above the statewide midpoint of $2,750, and the top-to-bottom gap is 6%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (300 sq ft)Midpointvs. state
New Haven, CT$1,300 – $4,400$2,850+3%
Bridgeport, CT$1,300 – $4,300$2,800+1%
Waterbury, CT$1,300 – $4,250$2,750−1%
Hartford, CT$1,250 – $4,200$2,750−1%
Norwich, CT$1,250 – $4,100$2,700−3%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,200 to $3,350 for Connecticut is attached.

Take this estimate with you: PDF report, $9

The report lays out the concrete patio numbers for Connecticut line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Connecticut: your questions

+How much does it cost to pour a concrete patio in Connecticut?

$1,300 to $4,250 for 300 sq ft, using statewide wages and prices. Metro areas inside Connecticut can sit above or below that.

+Which city in Connecticut is cheapest for concrete patio?

Norwich at about $2,700 (midpoint, 300 sq ft). The priciest is New Haven at $2,850.

+Is concrete patio cheaper in Connecticut than the US average?

It is 6% more expensive: $2,750 against $2,650 for 300 sq ft at the midpoint.

+What share of the price is labor in Connecticut?

About 55% ($1,500). Materials are 37%. Statewide labor for this job is weighted 1.12x the national wage level.

+What do cement masons and concrete finishers earn in Connecticut?

The BLS statewide median is $28.19 an hour, against $27.41 for the US. The 25th to 75th percentile range is $23.34 to $31.41.

+Where does Connecticut rank for concrete patio costs?

12th most expensive of 51 (the 50 states plus DC) at the midpoint, $2,750 for 300 sq ft. Rank 1 is the costliest.

+What do basic and premium concrete patio work cost in Connecticut?

For 300 sq ft, basic work runs $1,300 to $2,450 and premium work $3,050 to $4,250. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+Does the season matter for concrete patio in Connecticut?

Yes where winters or summers are hard. Of the Connecticut metros we cover, Bridgeport has the most comfortable months (7 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add an acid or water-based stain" add in Connecticut?

$940 to $3,150 for 300 sq ft, from a national range scaled by the statewide wage and goods indexes.

Concrete patio by city in Connecticut

Concrete patio: all pricesConnecticut cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.