Paver patio cost in Youngstown, OH
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (300 sq ft)
- $2,900 – $5,300
- Per sq ft
- $9.70 – $16.50
- before permit
- Versus US midpoint
- −3%
- US $4,250
- Rank of 300 metros
- #170
- 1 = most expensive
Youngstown homeowners pay roughly $2,900 to $5,300 to install a paver patio at 300 sq ft, or $9.70 to $16.50 per sq ft (permit not included). Against the US midpoint, Youngstown is 3% lower. Building materials run about 6% below the US average here (BEA goods price index 93.6).
Estimate your paver patio cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 300 sq ft in Youngstown, OH, standard level
$3,600 to $4,550
About $12 to $14.50 per sq ft before permits. Labor is about 62% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $1,300 | $1,500 |
| Labor | $2,250 | $2,850 |
| Permits and fees | $90 | $210 |
| Total | $3,600 | $4,550 |
Cost breakdown for 300 sq ft in Youngstown, OH
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,100 | $1,400 | $1,700 | 34% |
| Labor | $1,800 | $2,550 | $3,300 | 62% |
| Permits and fees | $0 | $150 | $310 | 4% |
| Total | $2,900 | $4,100 | $5,300 | 100% |
What is behind the Youngstown number
The wage side of the estimate leans on construction laborers, who do 50% of the hours on a typical job. Their local median is $23.36 an hour. Add the other trades involved and the blended wage index for Youngstown is 1.00 (US = 1.00), which puts labor at 62% of the total.
On the materials line, the BEA goods price index for the Youngstown metro is 93.6 (US = 100). The midpoint materials bill for 300 sq ft comes to $1,400, compared with $1,500 at national prices. Permit and inspection fees are scaled by the broader index (87.4) and land at $0 to $310.
What nearby projects cost in Youngstown
Because every project leans on different trades, Youngstown's wage level does not move all prices equally. Against the US midpoint, concrete driveway runs level and wood deck −5%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete patio | 300 sq ft | $1,200 – $3,950 | −2% |
| Stamped concrete | 400 sq ft | $3,200 – $7,900 | −1% |
| Retaining wall | 200 sq ft of wall face | $6,850 – $12,900 | −4% |
| Wood deck | 300 sq ft | $7,150 – $14,300 | −5% |
| Concrete slab | 400 sq ft | $2,400 – $5,050 | −2% |
| Concrete driveway | 600 sq ft | $3,650 – $9,250 | level |
Specs and site conditions that change a Youngstown bid
Pattern
Herringbone and curves take longer to lay and waste more stone than a running bond.
Permit
At-grade patios often need no permit; add a retaining wall, a cover, or a connection to the house and that changes.
Paver material
Pavers alone average $2-$4 per sq ft but the full range is $1-$15 depending on concrete, brick, or natural stone (HomeGuide).
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Youngstown is 1.00 times the national level.
Construction laborers (47-2061), 50% of the weighting: a median of $23.36 an hour, 3% above the US median of $22.66. The middle half of them earn between $18.83 and $31.39 an hour. About 850 work in the metro. That is 53.1 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.
Brickmasons and blockmasons (47-2021), 30% of the weighting: a median of $29.53 an hour, in line with the US median of $29.87. The middle half of them earn between $22.91 and $36.06 an hour. About 130 work in the metro. That is 8.1 per 10,000 jobs, compared with 3.4 nationally, which suggests plenty of local crews to bid.
For landscaping and groundskeeping workers (37-3011, weighted 20%) the local median is $17.28 an hour, which is 8% below the national $18.82. The middle half of them earn between $14.16 and $19.59 an hour. BLS counts 1,030 of them working in the area, 64.3 for every 10,000 jobs (US: 61.3), so the local bench is about average.
Quotes come from real crews, not medians. If the construction laborers on your job are paid at the 75th percentile ($31.39 an hour) instead of the median, the labor line grows by about $450. At the 25th percentile ($18.83) it shrinks by about $250. The total moves by 11.0% or 6.2%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 160,160 jobs in the Youngstown-Warren area. That makes it the 148th largest of the 300 metros we cover, with 0.10% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Construction laborers (47-2061) | 50% | $18.83 | $23.36 | $31.39 | $22.66 | 1.03 | metro |
| Brickmasons and blockmasons (47-2021) | 30% | $22.91 | $29.53 | $36.06 | $29.87 | 0.99 | metro |
| Landscaping and groundskeeping workers (37-3011) | 20% | $14.16 | $17.28 | $19.59 | $18.82 | 0.92 | metro |
| Blended | 100% | 1.00 | |||||
How Youngstown compares
Of the five closest metros, none is cheaper than Youngstown. Erie comes closest at about $4,150.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Youngstown, OHthis page | $2,900 – $5,300 | $4,100 | |
| Akron, OH30 miles | $3,200 – $5,850 | $4,500 | +10% |
| Canton, OH40 miles | $3,150 – $5,700 | $4,450 | +8% |
| Cleveland, OH45 miles | $3,250 – $5,900 | $4,600 | +12% |
| Pittsburgh, PA70 miles | $3,200 – $5,800 | $4,500 | +9% |
| Erie, PA75 miles | $2,950 – $5,300 | $4,150 | +1% |
| Ohio (statewide) | $3,150 – $5,750 | $4,450 | +9% |
| United States | $3,000 – $5,450 | $4,250 | +3% |
Across 300 US metros, Youngstown comes in at #170 from the top. The priciest is Kahului, HI at $5,650; the cheapest is Dothan, AL at $3,500 (midpoints, 300 sq ft). Statewide, Youngstown is 8% below the Ohio figure.
Other Ohio metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Columbus, OH | 1,105,580 jobs | $3,300 – $5,950 | $4,600 | +13% |
| Cincinnati, OH | 1,101,030 jobs | $3,150 – $5,700 | $4,450 | +8% |
| Cleveland, OH | 1,031,130 jobs | $3,250 – $5,900 | $4,600 | +12% |
| Dayton, OH | 372,660 jobs | $3,050 – $5,550 | $4,300 | +5% |
| Akron, OH | 319,560 jobs | $3,200 – $5,850 | $4,500 | +10% |
| Toledo, OH | 291,530 jobs | $3,100 – $5,650 | $4,350 | +7% |
Cities with a workforce like Youngstown's
Big cities and small ones price differently, so here is Youngstown against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Waterbury, CT | 160,710 jobs | $3,250 – $5,950 | $4,600 | +12% |
| Gulfport, MS | 158,310 jobs | $2,600 – $4,700 | $3,650 | −11% |
| Shreveport, LA | 162,750 jobs | $2,700 – $4,850 | $3,750 | −8% |
| Eugene, OR | 157,710 jobs | $3,250 – $5,900 | $4,600 | +12% |
Cost by quality level and size in Youngstown
Three bands are cut from the same cited range and localized for Youngstown wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.
Basic
$2,900 to $3,850
Basic concrete pavers, simple pattern, level yard
Standard
$3,600 to $4,550
Mid-grade pavers, a border or curve, some regrading
Premium
$4,350 to $5,300
Natural stone or clay brick, complex pattern, slope or retaining edge
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 12x12 (144 sq ft) | $1,400 – $1,900 | $1,800 – $2,300 | $2,150 – $2,700 |
| 16x16 (256 sq ft) | $2,500 – $3,300 | $3,100 – $3,950 | $3,700 – $4,550 |
| 20x20 (400 sq ft) | $3,900 – $5,100 | $4,800 – $6,000 | $5,700 – $6,950 |
| pool deck (800 sq ft) | $7,800 – $10,100 | $9,500 – $11,800 | $11,200 – $13,600 |
When to schedule paver patio in Youngstown
We use NOAA's 1991-2020 climate normals for Youngstown Rgnl Ap (10 miles from the city center). These are 30-year monthly averages, not forecasts.
April through November is the stretch where digging, grading and setting material in the ground runs into the fewest weather problems in Youngstown (8 of 12 months). January, February, March and December have an average overnight low at or below freezing (32°F).
In January, February, March and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 127 days a year with a low at or below 32°F at this station.
Youngstown gets about 41 inches of precipitation in a normal year, including roughly 68 inches of snow. The wettest months are June, July and September (4.3 inches in July). Inside the workable window, October and November are the driest, at 3.3 and 3.0 inches. The station averages about 8 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 34 | 19 | 3.0 | Cold |
| Feb | 37 | 21 | 2.5 | Cold |
| Mar | 47 | 28 | 3.2 | Cold |
| Apr | 60 | 38 | 3.8 | Workable |
| May | 71 | 48 | 3.7 | Workable |
| Jun | 79 | 56 | 3.9 | Workable |
| Jul | 83 | 60 | 4.3 | Workable |
| Aug | 81 | 59 | 3.5 | Workable |
| Sep | 74 | 52 | 3.8 | Workable |
| Oct | 62 | 42 | 3.3 | Workable |
| Nov | 50 | 33 | 3.0 | Workable |
| Dec | 39 | 26 | 3.2 | Cold |
Extras that change the Youngstown total
Extras are quoted nationally and then scaled to Youngstown by the average of the local wage index (1.00) and goods index (0.94), a factor of 0.97. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Excavation and haul-away | $290 – $1,450 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,600 to $4,550 for Youngstown, OH is attached.
A detailed PDF report of this estimate, $9
The report lays out the paver patio numbers for Youngstown, OH line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Paver patio in Youngstown: your questions
+How much does it cost to install a paver patio in Youngstown?
For 300 sq ft, expect $2,900 to $5,300 in the Youngstown area. A standard-spec job lands at $3,600 to $4,550. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for paver patio in Youngstown?
About $9.70 to $16.50 per sq ft for materials and labor, plus $0 to $310 for the permit if one is needed. The US range is $10 to $17.
+Is paver patio cheaper in Youngstown or Akron?
Akron is 30 miles away. The midpoint for 300 sq ft there is $4,500, which is 10% more than Youngstown ($4,100). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Youngstown?
About 62% at the midpoint, or $2,550 out of $4,100. Materials are 34% and permits 4%. Nationally, labor is 60%.
+What would 20x20 (400 sq ft) cost in Youngstown?
$3,900 to $6,950. Pick a different size in the estimator above to get your own number.
+Does paver patio need a permit in Youngstown?
Often, but rules are set by your city or county building office, so call before you hire. Budget $0 to $310 for fees in the Youngstown area (our national range of $0 to $350 scaled by the local price level).
+Is Youngstown expensive for paver patio compared with the rest of Ohio?
Youngstown is 8% below the Ohio statewide estimate ($4,450 at the midpoint). We cover 8 metros in Ohio; see the state page to compare them.
+What do construction laborers earn in Youngstown?
The BLS median is $23.36 an hour in the Youngstown area, compared with $22.66 nationally. The 25th to 75th percentile range is $18.83 to $31.39.
+What do basic and premium paver patio work cost in Youngstown?
For 300 sq ft, basic work runs $2,900 to $3,850 and premium work $4,350 to $5,300. Basic means: basic concrete pavers, simple pattern, level yard. Premium means: natural stone or clay brick, complex pattern, slope or retaining edge.
+When is the best time to install a paver patio in Youngstown?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through November. October and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "excavation and haul-away" add in Youngstown?
$290 to $1,450 for 300 sq ft, from a national range scaled by the local wage and goods indexes.
Paver patio near Youngstown
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: 2026 Paver Patio Cost | Paver Installation Costs (accessed November 4, 2026)
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020