Stamped concrete cost in Indianapolis, IN
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (400 sq ft)
- $3,300 – $8,200
- Per sq ft
- $8.15 – $19.50
- before permit
- Versus US midpoint
- +3%
- US $5,600
- Rank of 300 metros
- #98
- 1 = most expensive
Indianapolis homeowners pay roughly $3,300 to $8,200 to pour stamped concrete at 400 sq ft, or $8.15 to $19.50 per sq ft (permit not included). Against the US midpoint, Indianapolis is almost level. Cement masons and concrete finishers earn a median of $29.86 an hour in the Indianapolis area, 9% above the US median of $27.41.
Estimate your stamped concrete cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Indianapolis, IN, standard level
$4,750 to $6,750
About $11.50 to $16 per sq ft before permits. Labor is about 52% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $2,200 | $2,900 |
| Labor | $2,450 | $3,600 |
| Permits and fees | $130 | $250 |
| Total | $4,750 | $6,750 |
Cost breakdown for 400 sq ft in Indianapolis, IN
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,700 | $2,550 | $3,400 | 44% |
| Labor | $1,550 | $3,000 | $4,450 | 52% |
| Permits and fees | $50 | $190 | $330 | 3% |
| Total | $3,300 | $5,750 | $8,200 | 100% |
What is behind the Indianapolis number
The wage side of the estimate leans on cement masons and concrete finishers, who do 60% of the hours on a typical job. Their local median is $29.86 an hour. Add the other trades involved and the blended wage index for Indianapolis is 1.12 (US = 1.00), which puts labor at 52% of the total.
On the materials line, the BEA goods price index for the Indianapolis metro is 94.3 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,550, compared with $2,700 at national prices. Permit and inspection fees are scaled by the broader index (95.7) and land at $50 to $330.
When to schedule stamped concrete in Indianapolis
We use NOAA's 1991-2020 climate normals for Indianapolis (10 miles from the city center). These are 30-year monthly averages, not forecasts.
April through October is the stretch where pouring concrete runs into the fewest weather problems in Indianapolis (7 of 12 months). January, February, March, November and December have an average overnight low of 40°F or below.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Indianapolis gets about 44 inches of precipitation in a normal year, including roughly 26 inches of snow. The wettest months are May, June and July (5.0 inches in June). Inside the workable window, August and September are the driest, at 3.2 and 3.1 inches. The station averages about 20 days a year at 90°F or above.
Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 36 | 21 | 3.1 | Cold |
| Feb | 41 | 24 | 2.4 | Cold |
| Mar | 52 | 33 | 3.7 | Cold |
| Apr | 64 | 43 | 4.3 | Workable |
| May | 73 | 54 | 4.8 | Workable |
| Jun | 82 | 63 | 5.0 | Workable |
| Jul | 85 | 66 | 4.4 | Workable |
| Aug | 84 | 65 | 3.2 | Workable |
| Sep | 78 | 57 | 3.1 | Workable |
| Oct | 66 | 46 | 3.2 | Workable |
| Nov | 52 | 35 | 3.5 | Cold |
| Dec | 40 | 26 | 2.9 | Cold |
What nearby projects cost in Indianapolis
Because every project leans on different trades, Indianapolis's wage level does not move all prices equally. Against the US midpoint, gravel driveway runs +8% and asphalt driveway +1%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete patio | 300 sq ft | $1,250 – $4,150 | +3% |
| Concrete driveway | 600 sq ft | $3,800 – $9,800 | +6% |
| Paver patio | 300 sq ft | $3,100 – $5,600 | +3% |
| Concrete slab | 400 sq ft | $2,500 – $5,250 | +2% |
| Asphalt driveway | 600 sq ft | $3,050 – $7,550 | +1% |
| Gravel driveway | 1,000 sq ft | $2,750 – $11,000 | +8% |
Specs and site conditions that change a Indianapolis bid
Specialist labor
Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.
Sealing and vapor barrier
Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).
Not included
These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.
Local wages behind the labor line
Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Indianapolis is 1.12 times the national level.
For cement masons and concrete finishers (47-2051, weighted 60%) the local median is $29.86 an hour, which is 9% above the national $27.41. The middle half of them earn between $23.90 and $34.24 an hour. BLS counts 1,660 of them working in the area, 15.0 for every 10,000 jobs (US: 13.3), so the local bench is about average.
Construction laborers (47-2061), 30% of the weighting: a median of $24.54 an hour, 8% above the US median of $22.66. The middle half of them earn between $22.00 and $30.09 an hour. About 9,840 work in the metro. That is 89.0 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.
For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $39.51 an hour, which is 37% above the national $28.78. The middle half of them earn between $29.58 and $44.60 an hour. BLS counts 3,700 of them working in the area, 33.5 for every 10,000 jobs (US: 30.7), so the local bench is about average.
Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($34.24 an hour) instead of the median, the labor line grows by about $260. At the 25th percentile ($23.90) it shrinks by about $350. The total moves by 4.5% or 6.1%, so wages alone rarely explain a quote that is far outside our range.
For context on the local economy, BLS counts 1,105,170 jobs in the Indianapolis-Carmel-Greenwood area. That makes it the 31st largest of the 300 metros we cover, with 0.71% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 60% | $23.90 | $29.86 | $34.24 | $27.41 | 1.09 | metro |
| Construction laborers (47-2061) | 30% | $22.00 | $24.54 | $30.09 | $22.66 | 1.08 | metro |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $29.58 | $39.51 | $44.60 | $28.78 | 1.37 | metro |
| Blended | 100% | 1.12 | |||||
Cost by quality level and size in Indianapolis
Three bands are cut from the same cited range and localized for Indianapolis wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.
Basic
$3,300 to $5,250
Basic pattern, one integral color
Standard
$4,750 to $6,750
Two-tone color release and a border
Premium
$6,250 to $8,200
Multi-color, hand-detailed, sealed to a high finish
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x20 patio (200 sq ft) | $1,700 – $2,700 | $2,450 – $3,500 | $3,250 – $4,250 |
| 20x20 patio (400 sq ft) | $3,300 – $5,250 | $4,750 – $6,750 | $6,250 – $8,200 |
| 2-car driveway (600 sq ft) | $4,950 – $7,800 | $7,100 – $9,950 | $9,250 – $12,100 |
How Indianapolis compares
Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $5,500 to $5,750 across Indianapolis and its five closest metros.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Indianapolis, INthis page | $3,300 – $8,200 | $5,750 | |
| Bloomington, IN50 miles | $3,300 – $8,150 | $5,700 | −1% |
| Lafayette, IN65 miles | $3,250 – $7,950 | $5,600 | −3% |
| Terre Haute, IN70 miles | $3,150 – $7,800 | $5,500 | −5% |
| Fort Wayne, IN95 miles | $3,250 – $8,000 | $5,600 | −2% |
| Cincinnati, OH100 miles | $3,300 – $8,200 | $5,750 | level |
| Indiana (statewide) | $3,300 – $8,150 | $5,750 | level |
| United States | $3,250 – $7,950 | $5,600 | −3% |
Across 300 US metros, Indianapolis comes in at #98 from the top. The priciest is Kahului, HI at $8,150; the cheapest is McAllen, TX at $4,550 (midpoints, 400 sq ft). Statewide, Indianapolis is 0% above the Indiana figure.
Other Indiana metros
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Fort Wayne, IN | 225,520 jobs | $3,250 – $8,000 | $5,600 | −2% |
| Evansville, IN | 135,250 jobs | $3,350 – $8,300 | $5,850 | +2% |
| South Bend, IN | 131,670 jobs | $3,250 – $8,050 | $5,650 | −2% |
| Elkhart, IN | 127,730 jobs | $3,250 – $8,000 | $5,600 | −2% |
| Lafayette, IN | 102,200 jobs | $3,250 – $7,950 | $5,600 | −3% |
| Bloomington, IN | 73,240 jobs | $3,300 – $8,150 | $5,700 | −1% |
Cities with a workforce like Indianapolis's
Big cities and small ones price differently, so here is Indianapolis against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Columbus, OH | 1,105,580 jobs | $3,400 – $8,500 | $5,950 | +4% |
| Cincinnati, OH | 1,101,030 jobs | $3,300 – $8,200 | $5,750 | level |
| Pittsburgh, PA | 1,114,490 jobs | $3,400 – $8,350 | $5,850 | +2% |
| Nashville, TN | 1,099,300 jobs | $3,050 – $7,400 | $5,250 | −9% |
Add-ons priced for Indianapolis
Extras are quoted nationally and then scaled to Indianapolis by the average of the local wage index (1.12) and goods index (0.94), a factor of 1.03. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.
| Add-on | Local range |
|---|---|
| Add a vapor barrier | $210 – $410 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,750 to $6,750 for Indianapolis, IN is attached.
Detailed stamped concrete report for Indianapolis, IN, $9
The report lays out the stamped concrete numbers for Indianapolis, IN line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Stamped concrete in Indianapolis: your questions
+How much does it cost to pour stamped concrete in Indianapolis?
For 400 sq ft, expect $3,300 to $8,200 in the Indianapolis area. A standard-spec job lands at $4,750 to $6,750. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for stamped concrete in Indianapolis?
About $8.15 to $19.50 per sq ft for materials and labor, plus $50 to $330 for the permit if one is needed. The US range is $8 to $19.
+Is stamped concrete cheaper in Indianapolis or Bloomington?
Bloomington is 50 miles away. The midpoint for 400 sq ft there is $5,700, which is 1% less than Indianapolis ($5,750). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Indianapolis?
About 52% at the midpoint, or $3,000 out of $5,750. Materials are 44% and permits 3%. Nationally, labor is 48%.
+What would 20x20 patio (400 sq ft) cost in Indianapolis?
$3,300 to $8,200. Pick a different size in the estimator above to get your own number.
+Does stamped concrete need a permit in Indianapolis?
Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $330 for fees in the Indianapolis area (our national range of $50 to $350 scaled by the local price level).
+Is Indianapolis expensive for stamped concrete compared with the rest of Indiana?
Indianapolis is 0% above the Indiana statewide estimate ($5,750 at the midpoint). We cover 8 metros in Indiana; see the state page to compare them.
+What do cement masons and concrete finishers earn in Indianapolis?
The BLS median is $29.86 an hour in the Indianapolis area, compared with $27.41 nationally. The 25th to 75th percentile range is $23.90 to $34.24.
+What do basic and premium stamped concrete work cost in Indianapolis?
For 400 sq ft, basic work runs $3,300 to $5,250 and premium work $6,250 to $8,200. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.
+When is the best time to pour stamped concrete in Indianapolis?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. August and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
+What does "add a vapor barrier" add in Indianapolis?
$210 to $410 for 400 sq ft, from a national range scaled by the local wage and goods indexes.
Stamped concrete near Indianapolis
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.