Stamped concrete cost in Albany, GA

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,750 – $6,550
Per sq ft
$6.75 – $15.50
before permit
Versus US midpoint
−17%
US $5,600
Rank of 300 metros
#298
1 = most expensive

Stamped concrete in Albany, GA usually costs $2,750 to $6,550 for 400 sq ft. That works out to about $6.75 to $15.50 per sq ft before permits. Compared with the national midpoint that is $940 less. Cement masons and concrete finishers earn a median of $17.98 an hour in the Albany area, 34% below the US median of $27.41.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in Albany, GA, standard level

$3,900 to $5,400

About $9.45 to $13 per sq ft before permits. Labor is about 40% of the bill.

Cost breakdown
PartLowHigh
Materials$2,250$2,950
Labor$1,500$2,250
Permits and fees$120$230
Total$3,900$5,400
Save and get a PDF report

Cost breakdown for 400 sq ft in Albany, GA

Part of the jobLowMidpointHighShare
Materials$1,750$2,600$3,45056%
Labor$980$1,900$2,80040%
Permits and fees$45$180$3104%
Total$2,750$4,650$6,550100%

What is behind the Albany number

Labor is 40% of the midpoint bill here, against 48% nationally. The mix of trades behind this job is cement masons and concrete finishers (60%), construction laborers (30%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Albany the blended ratio comes out at 0.70.

Materials are scaled with BEA's regional price parity for goods. Albany is at 96.3 against 100 for the US, so a materials line of $2,700 nationally becomes $2,600 here (midpoint, 400 sq ft). Permits follow the all-items index of 87.7: $45 to $310.

Related projects, priced for Albany

Jobs that often go together with stamped concrete are priced below at their usual sizes, using the same Albany wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−10%) and concrete driveway lowest (−22%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,100 – $3,200−18%
Concrete driveway600 sq ft$2,900 – $7,100−22%
Paver patio300 sq ft$2,550 – $4,600−15%
Concrete slab400 sq ft$2,050 – $4,450−15%
Asphalt driveway600 sq ft$2,750 – $6,600−10%
Gravel driveway1,000 sq ft$2,150 – $8,800−14%

How Albany compares

Of the five closest metros, none is cheaper than Albany. Dothan comes closest at about $4,800.

Comparison with nearby areas
AreaRangeMidpointvs. here
Albany, GAthis page$2,750 – $6,550$4,650
Warner Robins, GA65 miles$2,950 – $7,050$5,000+7%
Columbus, GA70 miles$2,850 – $6,750$4,800+3%
Dothan, AL85 miles$2,800 – $6,750$4,800+3%
Macon, GA85 miles$2,900 – $6,950$4,900+5%
Tallahassee, FL90 miles$2,900 – $6,950$4,950+6%
Georgia (statewide)$2,950 – $7,150$5,050+9%
United States$3,250 – $7,950$5,600+20%

Out of the 300 metros we cover, Albany ranks #298 for the cost of this job (#1 is the most expensive). Statewide, Albany is 8% below the Georgia figure.

Elsewhere in Georgia

Georgia metros compared with Albany
MetroSizeRangeMidpointvs. here
Atlanta, GA2,889,670 jobs$3,050 – $7,350$5,200+11%
Augusta, GA231,930 jobs$2,900 – $7,050$5,000+7%
Savannah, GA198,360 jobs$2,900 – $7,000$4,950+6%
Columbus, GA116,380 jobs$2,850 – $6,750$4,800+3%
Gainesville, GA103,870 jobs$2,900 – $7,050$4,950+7%
Athens, GA95,800 jobs$2,900 – $7,000$4,950+6%

Metros of a similar size

Big cities and small ones price differently, so here is Albany against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Dubuque, IA58,470 jobs$3,150 – $7,800$5,500+18%
Wheeling, WV58,130 jobs$3,300 – $8,150$5,700+23%
Altoona, PA58,650 jobs$3,150 – $7,650$5,400+16%
Sebastian, FL57,620 jobs$3,000 – $7,300$5,150+10%

Add-ons priced for Albany

Add-ons start from national price ranges and are scaled by 0.83 for Albany, which is the average of the area's wage index (0.70) and goods price index (0.96). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a vapor barrier$170 – $330

What local crews earn in Albany

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Albany the blend is 0.70.

Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $17.98 an hour, 34% below the US median of $27.41. The middle half of them earn between $15.21 and $18.98 an hour. About 80 work in the metro. That is 13.7 per 10,000 jobs, compared with 13.3 nationally, so the supply of crews looks typical.

For construction laborers (47-2061, weighted 30%) the local median is $17.25 an hour, which is 24% below the national $22.66. The middle half of them earn between $14.62 and $18.96 an hour. BLS counts 400 of them working in the area, 68.5 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $21.86 an hour, 24% below the US median of $28.78. The middle half of them earn between $18.48 and $22.50 an hour. About 260 work in the metro. That is 44.5 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $60 to the midpoint estimate; the 25th percentile takes off about $160. That is a swing of roughly 3.5% to 1.3% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Albany has 58,390 jobs in total (BLS, May 2025), ranking 293rd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$15.21$17.98$18.98$27.410.66metro
Construction laborers (47-2061)30%$14.62$17.25$18.96$22.660.76metro
Operating engineers and other construction equipment operators (47-2073)10%$18.48$21.86$22.50$28.780.76metro
Blended100%0.70

Pick a size, pick a tier: stamped concrete pricing in Albany

The cited range is split into basic, standard and premium bands, then scaled to Albany. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).

Basic

$2,750 to $4,300

Basic pattern, one integral color

Standard

$3,900 to $5,400

Two-tone color release and a border

Premium

$5,050 to $6,550

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,400 – $2,200$2,000 – $2,800$2,600 – $3,450
20x20 patio (400 sq ft)$2,750 – $4,300$3,900 – $5,400$5,050 – $6,550
2-car driveway (600 sq ft)$4,100 – $6,350$5,800 – $8,000$7,450 – $9,700

Albany weather and the stamped concrete calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Albany Sw Ga Rgnl Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Albany are February through May and September through December: 8 of 12. Outside them, January has an average overnight low of 40°F or below, and June, July and August have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in June, July and August, crews often start early, wet the base and plan for faster set times.

Albany gets about 47 inches of precipitation in a normal year. The wettest months are June, July and August (5.1 inches in July). Inside the workable window, May and October are the driest, at 2.4 and 2.3 inches. The station averages about 106 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Albany Sw Ga Rgnl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan62394.2Cold
Feb66424.0Workable
Mar73484.4Workable
Apr80543.7Workable
May88632.4Workable
Jun91715.1Hot
Jul93735.1Hot
Aug92734.8Hot
Sep88683.4Workable
Oct81572.3Workable
Nov71462.9Workable
Dec64414.3Workable

Stamped concrete: what moves the price in Albany

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

  • Sealing and vapor barrier

    Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,900 to $5,400 for Albany, GA is attached.

A detailed PDF report of this estimate, $9

The report lays out the stamped concrete numbers for Albany, GA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in Albany: your questions

+How much does it cost to pour stamped concrete in Albany?

For 400 sq ft, expect $2,750 to $6,550 in the Albany area. A standard-spec job lands at $3,900 to $5,400. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for stamped concrete in Albany?

About $6.75 to $15.50 per sq ft for materials and labor, plus $45 to $310 for the permit if one is needed. The US range is $8 to $19.

+Is stamped concrete cheaper in Albany or Warner Robins?

Warner Robins is 65 miles away. The midpoint for 400 sq ft there is $5,000, which is 7% more than Albany ($4,650). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Albany?

About 40% at the midpoint, or $1,900 out of $4,650. Materials are 56% and permits 4%. Nationally, labor is 48%.

+What would 20x20 patio (400 sq ft) cost in Albany?

$2,750 to $6,550. Pick a different size in the estimator above to get your own number.

+Does stamped concrete need a permit in Albany?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $310 for fees in the Albany area (our national range of $50 to $350 scaled by the local price level).

+Is Albany expensive for stamped concrete compared with the rest of Georgia?

Albany is 8% below the Georgia statewide estimate ($5,050 at the midpoint). We cover 10 metros in Georgia; see the state page to compare them.

+What do cement masons and concrete finishers earn in Albany?

The BLS median is $17.98 an hour in the Albany area, compared with $27.41 nationally. The 25th to 75th percentile range is $15.21 to $18.98.

+What do basic and premium stamped concrete work cost in Albany?

For 400 sq ft, basic work runs $2,750 to $4,300 and premium work $5,050 to $6,550. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+When is the best time to pour stamped concrete in Albany?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are February through May and September through December. May and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a vapor barrier" add in Albany?

$170 to $330 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Stamped concrete near Albany

Stamped concrete: all pricesStamped concrete in GeorgiaAll projects in AlbanyGeorgia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.