Skip to content
CostLocal

Concrete slab cost in Killeen, TX

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,150 – $4,600
Per sq ft
$5.25 – $10.50
before permit
Versus US midpoint
−12%
US $3,850
Rank of 300 metros
#271
1 = most expensive

If you want to pour a concrete slab in Killeen, plan on $2,150 to $4,600 for 400 sq ft, all in. Per sq ft, that is $5.25 to $10.50 for materials and labor, with the permit on top. The local midpoint runs 12% lower than the national one. Cement masons and concrete finishers earn a median of $22.60 an hour in the Killeen area, 18% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Killeen, TX, standard level

$2,900 to $3,850

About $6.85 to $9 per sq ft before permits. Labor is about 38% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,200
Labor$1,150$1,450
Permits and fees$140$270
Total$2,900$3,850
Save and get a PDF report

Cost breakdown for 400 sq ft in Killeen, TX

Part of the jobLowMidpointHighShare
Materials$1,150$1,900$2,65056%
Labor$970$1,300$1,60038%
Permits and fees$45$210$3606%
Total$2,150$3,400$4,600100%

Why Killeen prices look the way they do

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $22.60 an hour. Add the other trades involved and the blended wage index for Killeen is 0.81 (US = 1.00), which puts labor at 38% of the total.

On the materials line, the BEA goods price index for the Killeen metro is 93.8 (US = 100). The midpoint materials bill for 400 sq ft comes to $1,900, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (91.1) and land at $45 to $360.

Optional extras in Killeen

Extras are quoted nationally and then scaled to Killeen by the average of the local wage index (0.81) and goods index (0.94), a factor of 0.87. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$350 – $1,050
Remove old concrete first$700 – $2,100

Climate in Killeen: timing your concrete slab job

We use NOAA's 1991-2020 climate normals for Killeen (5 miles from the city center). These are 30-year monthly averages, not forecasts.

March through May and October through November are the stretches where pouring concrete runs into the fewest weather problems in Killeen (5 of 12 months). January, February and December have an average overnight low of 40°F or below; June, July, August and September have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in June, July, August and September, crews often start early, wet the base and plan for faster set times.

Killeen gets about 35 inches of precipitation in a normal year. The wettest months are May, September and October (4.7 inches in May). Inside the workable window, April and November are the driest, at 2.1 and 2.7 inches. The station averages about 105 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Killeen (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan60362.5Cold
Feb63402.2Cold
Mar70473.3Workable
Apr77542.1Workable
May84634.7Workable
Jun92703.2Hot
Jul96722.7Hot
Aug97731.6Hot
Sep90673.9Hot
Oct80563.4Workable
Nov69462.7Workable
Dec60382.4Cold

Pick a size, pick a tier: concrete slab pricing in Killeen

Three bands are cut from the same cited range and localized for Killeen wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,150 to $3,150

4-inch broom-finish slab, light mesh, easy truck access

Standard

$2,900 to $3,850

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,600 to $4,600

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$570 – $910$830 – $1,150$1,100 – $1,450
12x12 (144 sq ft)$800 – $1,250$1,150 – $1,550$1,450 – $1,900
20x20 (400 sq ft)$2,150 – $3,150$2,900 – $3,850$3,600 – $4,600
24x24 garage floor (576 sq ft)$3,050 – $4,450$4,100 – $5,450$5,100 – $6,500
30x40 foundation (1,200 sq ft)$6,350 – $9,050$8,350 – $11,100$10,400 – $13,100

Planning more than one job in Killeen?

Because every project leans on different trades, Killeen's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs −11% and concrete driveway −15%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,150 – $7,800−15%
Concrete patio300 sq ft$1,100 – $3,450−13%
Detached garage576 sq ft$25,100 – $50,500−13%
Stamped concrete400 sq ft$2,850 – $6,950−12%
Asphalt driveway600 sq ft$2,750 – $6,600−11%
Gravel driveway1,000 sq ft$2,150 – $8,850−13%

Killeen labor market for concrete slab

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Killeen is 0.81 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $22.60 an hour, which is 18% below the national $27.41. The middle half of them earn between $18.66 and $22.98 an hour. BLS counts 390 of them working in the area, 25.9 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $18.12 an hour, 20% below the US median of $22.66. The middle half of them earn between $17.28 and $22.05 an hour. About 940 work in the metro. That is 62.4 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $22.88 an hour, which is 21% below the national $28.78. The middle half of them earn between $18.62 and $26.63 an hour. BLS counts 570 of them working in the area, 37.9 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

For carpenters (47-2031, weighted 10%) the local median is $22.87 an hour, which is 21% below the national $29.12. The middle half of them earn between $21.30 and $28.43 an hour. BLS counts 270 of them working in the area, 17.9 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($22.98 an hour) instead of the median, the labor line grows by about $10. At the 25th percentile ($18.66) it shrinks by about $110. The total moves by 0.3% or 3.4%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 150,580 jobs in the Killeen-Temple area. That makes it the 155th largest of the 300 metros we cover, with 0.10% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$18.66$22.60$22.98$27.410.82metro
Construction laborers (47-2061)30%$17.28$18.12$22.05$22.660.80metro
Operating engineers and other construction equipment operators (47-2073)10%$18.62$22.88$26.63$28.780.79metro
Carpenters (47-2031)10%$21.30$22.87$28.43$29.120.79metro
Blended100%0.81

How Killeen compares

Same job, same size (400 sq ft), priced for the nearest metros. Dallas is the priciest of the group at $3,700. College Station is the cheapest at $3,300.

Comparison with nearby areas
AreaRangeMidpointvs. here
Killeen, TXthis page$2,150 – $4,600$3,400
Waco, TX40 miles$2,100 – $4,550$3,350−1%
Austin, TX65 miles$2,250 – $4,800$3,500+4%
College Station, TX85 miles$2,100 – $4,550$3,300−2%
Dallas, TX125 miles$2,350 – $5,050$3,700+9%
San Antonio, TX130 miles$2,150 – $4,650$3,400+1%
Texas (statewide)$2,250 – $4,800$3,500+4%
United States$2,450 – $5,200$3,850+13%

Across 300 US metros, Killeen comes in at #271 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Killeen is 4% below the Texas figure.

Other Texas metros

Texas metros compared with Killeen
MetroSizeRangeMidpointvs. here
Dallas, TX4,049,800 jobs$2,350 – $5,050$3,700+9%
Houston, TX3,289,720 jobs$2,250 – $4,900$3,600+6%
Austin, TX1,293,690 jobs$2,250 – $4,800$3,500+4%
San Antonio, TX1,126,880 jobs$2,150 – $4,650$3,400+1%
El Paso, TX339,120 jobs$2,050 – $4,450$3,250−3%
McAllen, TX296,700 jobs$2,000 – $4,350$3,200−6%

Cities with a workforce like Killeen's

Big cities and small ones price differently, so here is Killeen against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Gainesville, FL152,670 jobs$2,200 – $4,750$3,500+3%
Fargo, ND148,660 jobs$2,400 – $5,050$3,750+11%
Roanoke, VA153,980 jobs$2,200 – $4,750$3,500+4%
Myrtle Beach, SC146,260 jobs$2,150 – $4,700$3,400+1%

Concrete slab: what moves the price in Killeen

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,900 to $3,850 for Killeen, TX is attached.

Detailed concrete slab report for Killeen, TX, $9

The report lays out the concrete slab numbers for Killeen, TX line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Killeen: your questions

+How much does it cost to pour a concrete slab in Killeen?

For 400 sq ft, expect $2,150 to $4,600 in the Killeen area. A standard-spec job lands at $2,900 to $3,850. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Killeen?

About $5.25 to $10.50 per sq ft for materials and labor, plus $45 to $360 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Killeen or Waco?

Waco is 40 miles away. The midpoint for 400 sq ft there is $3,350, which is 1% less than Killeen ($3,400). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Killeen?

About 38% at the midpoint, or $1,300 out of $3,400. Materials are 56% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Killeen?

$2,150 to $4,600. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Killeen?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $360 for fees in the Killeen area (our national range of $50 to $400 scaled by the local price level).

+Is Killeen expensive for concrete slab compared with the rest of Texas?

Killeen is 4% below the Texas statewide estimate ($3,500 at the midpoint). We cover 21 metros in Texas; see the state page to compare them.

+What do cement masons and concrete finishers earn in Killeen?

The BLS median is $22.60 an hour in the Killeen area, compared with $27.41 nationally. The 25th to 75th percentile range is $18.66 to $22.98.

+What do basic and premium concrete slab work cost in Killeen?

For 400 sq ft, basic work runs $2,150 to $3,150 and premium work $3,600 to $4,600. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Killeen?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through May and October through November. April and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Killeen?

$350 to $1,050 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Killeen

Concrete slab: all pricesConcrete slab in TexasAll projects in KilleenTexas cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.