Skip to content
CostLocal

Concrete patio cost in Killeen, TX

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,100 – $3,450
Per sq ft
$3.55 – $10.50
before permit
Versus US midpoint
−13%
US $2,650
Rank of 300 metros
#269
1 = most expensive

A concrete patio in Killeen, TX usually costs $1,100 to $3,450 for 300 sq ft. That works out to about $3.55 to $10.50 per sq ft before permits. Compared with the national midpoint that is $340 less. Cement masons and concrete finishers earn a median of $22.60 an hour in the Killeen area, 18% below the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Killeen, TX, standard level

$1,800 to $2,750

About $5.60 to $8.25 per sq ft before permits. Labor is about 48% of the bill.

Cost breakdown
PartLowHigh
Materials$870$1,100
Labor$800$1,400
Permits and fees$140$270
Total$1,800$2,750
Save and get a PDF report

Cost breakdown for 300 sq ft in Killeen, TX

Part of the jobLowMidpointHighShare
Materials$700$980$1,25043%
Labor$360$1,100$1,80048%
Permits and fees$45$210$3609%
Total$1,100$2,300$3,450100%

What is behind the Killeen number

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, carpenters at 10%, operating engineers and other construction equipment operators at 10%. Weighted together, Killeen wages are 0.81 times the national level. Labor makes up about 48% of the midpoint estimate (51% at national prices).

Materials are scaled with BEA's regional price parity for goods. Killeen is at 93.8 against 100 for the US, so a materials line of $1,050 nationally becomes $980 here (midpoint, 300 sq ft). Permits follow the all-items index of 91.1: $45 to $360.

Killeen against nearby metros and the rest of Texas

Of the five closest metros, 2 are cheaper than Killeen. College Station is the lowest at about $2,250 (midpoint, 300 sq ft), 85 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Killeen, TXthis page$1,100 – $3,450$2,300
Waco, TX40 miles$1,100 – $3,400$2,250−1%
Austin, TX65 miles$1,150 – $3,650$2,400+5%
College Station, TX85 miles$1,100 – $3,350$2,250−2%
Dallas, TX125 miles$1,200 – $3,750$2,500+9%
San Antonio, TX130 miles$1,100 – $3,500$2,300+1%
Texas (statewide)$1,150 – $3,600$2,400+4%
United States$1,250 – $4,000$2,650+15%

Out of the 300 metros we cover, Killeen ranks #269 for the cost of this job (#1 is the most expensive). Statewide, Killeen is 4% below the Texas figure.

Elsewhere in Texas

Texas metros compared with Killeen
MetroSizeRangeMidpointvs. here
Dallas, TX4,049,800 jobs$1,200 – $3,750$2,500+9%
Houston, TX3,289,720 jobs$1,200 – $3,650$2,400+6%
Austin, TX1,293,690 jobs$1,150 – $3,650$2,400+5%
San Antonio, TX1,126,880 jobs$1,100 – $3,500$2,300+1%
El Paso, TX339,120 jobs$1,100 – $3,300$2,200−4%
McAllen, TX296,700 jobs$1,050 – $3,150$2,100−7%

Metros of a similar size

Big cities and small ones price differently, so here is Killeen against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Gainesville, FL152,670 jobs$1,150 – $3,550$2,350+3%
Fargo, ND148,660 jobs$1,200 – $3,950$2,600+13%
Roanoke, VA153,980 jobs$1,150 – $3,600$2,350+4%
Myrtle Beach, SC146,260 jobs$1,150 – $3,500$2,300+1%

Planning more than one job in Killeen?

Jobs that often go together with concrete patio are priced below at their usual sizes, using the same Killeen wage and price inputs. Compared with national midpoints, asphalt driveway comes out highest (−11%) and concrete driveway lowest (−15%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,150 – $4,600−12%
Stamped concrete400 sq ft$2,850 – $6,950−12%
Paver patio300 sq ft$2,650 – $4,850−11%
Wood deck300 sq ft$6,600 – $13,200−13%
Concrete driveway600 sq ft$3,150 – $7,800−15%
Asphalt driveway600 sq ft$2,750 – $6,600−11%

What local crews earn in Killeen

The labor line is built from BLS wage data, one trade at a time. This job draws on 4 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Killeen the blend is 0.81.

Cement masons and concrete finishers (47-2051), 50% of the weighting: a median of $22.60 an hour, 18% below the US median of $27.41. The middle half of them earn between $18.66 and $22.98 an hour. About 390 work in the metro. That is 25.9 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $18.12 an hour, which is 20% below the national $22.66. The middle half of them earn between $17.28 and $22.05 an hour. BLS counts 940 of them working in the area, 62.4 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Carpenters (47-2031), 10% of the weighting: a median of $22.87 an hour, 21% below the US median of $29.12. The middle half of them earn between $21.30 and $28.43 an hour. About 270 work in the metro. That is 17.9 per 10,000 jobs, compared with 43.1 nationally, so expect fewer local crews to bid.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $22.88 an hour, 21% below the US median of $28.78. The middle half of them earn between $18.62 and $26.63 an hour. About 570 work in the metro. That is 37.9 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $10 to the midpoint estimate; the 25th percentile takes off about $95. That is a swing of roughly 4.2% to 0.4% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Killeen-Temple has 150,580 jobs in total (BLS, May 2025), ranking 155th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$18.66$22.60$22.98$27.410.82metro
Construction laborers (47-2061)30%$17.28$18.12$22.05$22.660.80metro
Carpenters (47-2031)10%$21.30$22.87$28.43$29.120.79metro
Operating engineers and other construction equipment operators (47-2073)10%$18.62$22.88$26.63$28.780.79metro
Blended100%0.81

Why two Killeen quotes can differ

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

Add-ons priced for Killeen

Add-ons start from national price ranges and are scaled by 0.87 for Killeen, which is the average of the area's wage index (0.81) and goods price index (0.94). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$790 – $2,600

Pick a size, pick a tier: concrete patio pricing in Killeen

The cited range is split into basic, standard and premium bands, then scaled to Killeen. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x10 (100 sq ft) to 20x20 (400 sq ft).

Basic

$1,100 to $2,050

Plain gray slab, broom finish, flat yard

Standard

$1,800 to $2,750

Colored or stained, saw-cut joints, minor grading

Premium

$2,500 to $3,450

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$400 – $800$700 – $1,100$1,000 – $1,400
12x16 (192 sq ft)$730 – $1,350$1,200 – $1,850$1,700 – $2,350
20x20 (400 sq ft)$1,450 – $2,650$2,350 – $3,600$3,300 – $4,500

Killeen weather and the concrete patio calendar

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Killeen (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Killeen are March through May and October through November: 5 of 12. Outside them, January, February and December have an average overnight low of 40°F or below, and June, July, August and September have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in June, July, August and September, crews often start early, wet the base and plan for faster set times.

Killeen gets about 35 inches of precipitation in a normal year. The wettest months are May, September and October (4.7 inches in May). Inside the workable window, April and November are the driest, at 2.1 and 2.7 inches. The station averages about 105 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Killeen (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan60362.5Cold
Feb63402.2Cold
Mar70473.3Workable
Apr77542.1Workable
May84634.7Workable
Jun92703.2Hot
Jul96722.7Hot
Aug97731.6Hot
Sep90673.9Hot
Oct80563.4Workable
Nov69462.7Workable
Dec60382.4Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,800 to $2,750 for Killeen, TX is attached.

Detailed concrete patio report for Killeen, TX, $9

Multi-page report for Killeen, TX: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Killeen: your questions

+How much does it cost to pour a concrete patio in Killeen?

For 300 sq ft, expect $1,100 to $3,450 in the Killeen area. A standard-spec job lands at $1,800 to $2,750. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Killeen?

About $3.55 to $10.50 per sq ft for materials and labor, plus $45 to $360 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Killeen or Waco?

Waco is 40 miles away. The midpoint for 300 sq ft there is $2,250, which is 1% less than Killeen ($2,300). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Killeen?

About 48% at the midpoint, or $1,100 out of $2,300. Materials are 43% and permits 9%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Killeen?

$730 to $2,350. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Killeen?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $360 for fees in the Killeen area (our national range of $50 to $400 scaled by the local price level).

+Is Killeen expensive for concrete patio compared with the rest of Texas?

Killeen is 4% below the Texas statewide estimate ($2,400 at the midpoint). We cover 21 metros in Texas; see the state page to compare them.

+What do cement masons and concrete finishers earn in Killeen?

The BLS median is $22.60 an hour in the Killeen area, compared with $27.41 nationally. The 25th to 75th percentile range is $18.66 to $22.98.

+What do basic and premium concrete patio work cost in Killeen?

For 300 sq ft, basic work runs $1,100 to $2,050 and premium work $2,500 to $3,450. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Killeen?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through May and October through November. April and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Killeen?

$790 to $2,600 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Killeen

Concrete patio: all pricesConcrete patio in TexasAll projects in KilleenTexas cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.