Houston homeowners pay roughly $2,250 to $4,900 to pour a concrete slab at 400 sq ft, or $5.55 to $11 per sq ft (permit not included). Against the US midpoint, Houston is 6% lower. Cement masons and concrete finishers earn a median of $22.40 an hour in the Houston area, 18% below the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Houston, TX, standard level

$3,050 to $4,100

About $7.25 to $9.55 per sq ft before permits. Labor is about 38% of the bill.

Cost breakdown
PartLowHigh
Materials$1,700$2,350
Labor$1,200$1,500
Permits and fees$150$290
Total$3,050$4,100
Save and get a PDF report

Cost breakdown for 400 sq ft in Houston, TX

Part of the jobLowMidpointHighShare
Materials$1,200$2,000$2,80056%
Labor$1,000$1,350$1,70038%
Permits and fees$50$220$3906%
Total$2,250$3,600$4,900100%

What is behind the Houston number

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Houston wages are 0.84 times the national level. Labor makes up about 38% of the midpoint estimate (42% at national prices).

On the materials line, the BEA goods price index for the Houston metro is 100.6 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,000, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (98.6) and land at $50 to $390.

When to schedule concrete slab in Houston

We use NOAA's 1991-2020 climate normals for Houston Hobby Ap (10 miles from the city center). These are 30-year monthly averages, not forecasts.

September through May is the stretch where pouring concrete runs into the fewest weather problems in Houston (9 of 12 months). June, July and August have an average daytime high of 90°F or more.

Heat matters for concrete as well. With average highs of 90°F or more in June, July and August, crews often start early, wet the base and plan for faster set times.

Houston gets about 56 inches of precipitation in a normal year. The wettest months are June, September and October (6.1 inches in June). Inside the workable window, February and March are the driest, at 2.9 and 3.3 inches. The station averages about 101 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Houston Hobby Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan64464.1Workable
Feb68502.9Workable
Mar73563.3Workable
Apr79624.1Workable
May86695.4Workable
Jun91756.1Hot
Jul93774.6Hot
Aug94775.4Hot
Sep89735.8Workable
Oct82645.8Workable
Nov73543.9Workable
Dec66484.3Workable

Concrete slab: what moves the price in Houston

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

  • Thickness and mix

    A 4-inch slab uses about 1.23 cubic yards of concrete per 100 sq ft; a 6-inch slab uses about 1.85. Stepping up from a 3,000 PSI to a 4,000-4,500 PSI mix adds $10-$40 per cubic yard (Estimators.us).

Planning more than one job in Houston?

Because every project leans on different trades, Houston's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs −5% and concrete driveway −11%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$3,300 – $8,150−11%
Concrete patio300 sq ft$1,200 – $3,650−8%
Detached garage576 sq ft$26,800 – $53,700−7%
Stamped concrete400 sq ft$3,050 – $7,300−8%
Asphalt driveway600 sq ft$2,950 – $7,000−5%
Gravel driveway1,000 sq ft$2,350 – $9,550−6%

How Houston compares

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $3,300 to $3,600 across Houston and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Houston, TXthis page$2,250 – $4,900$3,600
Beaumont, TX70 miles$2,250 – $4,800$3,500−2%
College Station, TX95 miles$2,100 – $4,550$3,300−7%
Lake Charles, LA130 miles$2,200 – $4,700$3,450−3%
Austin, TX140 miles$2,250 – $4,800$3,500−2%
Waco, TX170 miles$2,100 – $4,550$3,350−7%
Texas (statewide)$2,250 – $4,800$3,500−1%
United States$2,450 – $5,200$3,850+7%

Across 300 US metros, Houston comes in at #186 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Houston is 1% above the Texas figure.

Other Texas metros

Texas metros compared with Houston
MetroSizeRangeMidpointvs. here
Dallas, TX4,049,800 jobs$2,350 – $5,050$3,700+3%
Austin, TX1,293,690 jobs$2,250 – $4,800$3,500−2%
San Antonio, TX1,126,880 jobs$2,150 – $4,650$3,400−5%
El Paso, TX339,120 jobs$2,050 – $4,450$3,250−9%
McAllen, TX296,700 jobs$2,000 – $4,350$3,200−11%
Corpus Christi, TX192,580 jobs$2,200 – $4,700$3,450−3%

Cities with a workforce like Houston's

Big cities and small ones price differently, so here is Houston against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Dallas, TX4,049,800 jobs$2,350 – $5,050$3,700+3%
Washington, DC3,136,190 jobs$2,550 – $5,400$3,950+11%
Chicago, IL4,513,280 jobs$3,000 – $6,200$4,600+29%
Philadelphia, PA2,897,830 jobs$2,550 – $5,300$3,950+10%

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Houston is 0.84 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $22.40 an hour, which is 18% below the national $27.41. The middle half of them earn between $18.65 and $26.83 an hour. BLS counts 7,700 of them working in the area, 23.4 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $19.88 an hour, 12% below the US median of $22.66. The middle half of them earn between $17.82 and $22.88 an hour. About 34,080 work in the metro. That is 103.6 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $24.54 an hour, which is 15% below the national $28.78. The middle half of them earn between $22.50 and $29.76 an hour. BLS counts 14,000 of them working in the area, 42.6 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

For carpenters (47-2031, weighted 10%) the local median is $23.88 an hour, which is 18% below the national $29.12. The middle half of them earn between $22.40 and $28.94 an hour. BLS counts 9,600 of them working in the area, 29.2 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($26.83 an hour) instead of the median, the labor line grows by about $130. At the 25th percentile ($18.65) it shrinks by about $110. The total moves by 3.6% or 3.1%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 3,289,720 jobs in the Houston-Pasadena-The Woodlands area. That makes it the 5th largest of the 300 metros we cover, with 2.12% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$18.65$22.40$26.83$27.410.82metro
Construction laborers (47-2061)30%$17.82$19.88$22.88$22.660.88metro
Operating engineers and other construction equipment operators (47-2073)10%$22.50$24.54$29.76$28.780.85metro
Carpenters (47-2031)10%$22.40$23.88$28.94$29.120.82metro
Blended100%0.84

Optional extras in Houston

Extras are quoted nationally and then scaled to Houston by the average of the local wage index (0.84) and goods index (1.01), a factor of 0.92. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$370 – $1,100
Remove old concrete first$740 – $2,200

Cost by quality level and size in Houston

Three bands are cut from the same cited range and localized for Houston wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,250 to $3,300

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,050 to $4,100

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$3,850 to $4,900

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$600 – $970$880 – $1,250$1,150 – $1,500
12x12 (144 sq ft)$850 – $1,300$1,200 – $1,650$1,550 – $2,000
20x20 (400 sq ft)$2,250 – $3,300$3,050 – $4,100$3,850 – $4,900
24x24 garage floor (576 sq ft)$3,250 – $4,700$4,350 – $5,800$5,400 – $6,850
30x40 foundation (1,200 sq ft)$6,700 – $9,550$8,850 – $11,700$11,000 – $13,900

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,050 to $4,100 for Houston, TX is attached.

Detailed concrete slab report for Houston, TX, $9

The report lays out the concrete slab numbers for Houston, TX line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Houston: your questions

+How much does it cost to pour a concrete slab in Houston?

For 400 sq ft, expect $2,250 to $4,900 in the Houston area. A standard-spec job lands at $3,050 to $4,100. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Houston?

About $5.55 to $11 per sq ft for materials and labor, plus $50 to $390 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Houston or Beaumont?

Beaumont is 70 miles away. The midpoint for 400 sq ft there is $3,500, which is 2% less than Houston ($3,600). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Houston?

About 38% at the midpoint, or $1,350 out of $3,600. Materials are 56% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Houston?

$2,250 to $4,900. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Houston?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $390 for fees in the Houston area (our national range of $50 to $400 scaled by the local price level).

+Is Houston expensive for concrete slab compared with the rest of Texas?

Houston is 1% above the Texas statewide estimate ($3,500 at the midpoint). We cover 21 metros in Texas; see the state page to compare them.

+What do cement masons and concrete finishers earn in Houston?

The BLS median is $22.40 an hour in the Houston area, compared with $27.41 nationally. The 25th to 75th percentile range is $18.65 to $26.83.

+What do basic and premium concrete slab work cost in Houston?

For 400 sq ft, basic work runs $2,250 to $3,300 and premium work $3,850 to $4,900. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Houston?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are September through May. February and March are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Houston?

$370 to $1,100 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Houston

Concrete slab: all pricesConcrete slab in TexasAll projects in HoustonTexas cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.