Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,250 – $4,050
Per sq ft
$4 – $12.50
before permit
Versus US midpoint
+1%
US $2,650
Rank of 300 metros
#114
1 = most expensive

Billings homeowners pay roughly $1,250 to $4,050 to pour a concrete patio at 300 sq ft, or $4 to $12.50 per sq ft (permit not included). Against the US midpoint, Billings is almost level. Cement masons and concrete finishers earn a median of $30.12 an hour in the Billings area, 10% above the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Billings, MT, standard level

$2,100 to $3,200

About $6.50 to $9.80 per sq ft before permits. Labor is about 54% of the bill.

Cost breakdown
PartLowHigh
Materials$890$1,100
Labor$1,050$1,800
Permits and fees$140$280
Total$2,100$3,200
Save and get a PDF report

Cost breakdown for 300 sq ft in Billings, MT

Part of the jobLowMidpointHighShare
Materials$720$1,000$1,30038%
Labor$480$1,450$2,40054%
Permits and fees$45$210$3708%
Total$1,250$2,650$4,050100%

Why Billings prices look the way they do

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $30.12 an hour. Add the other trades involved and the blended wage index for Billings is 1.06 (US = 1.00), which puts labor at 54% of the total.

On the materials line, the BEA goods price index for the Billings metro is 96.0 (US = 100). The midpoint materials bill for 300 sq ft comes to $1,000, compared with $1,050 at national prices. Permit and inspection fees are scaled by the broader index (93.5) and land at $45 to $370.

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Billings is 1.06 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $30.12 an hour, which is 10% above the national $27.41. The middle half of them earn between $27.69 and $33.63 an hour. BLS counts 140 of them working in the area, 14.9 for every 10,000 jobs (US: 13.3), so the local bench is about average.

Construction laborers (47-2061), 30% of the weighting: a median of $23.68 an hour, 5% above the US median of $22.66. The middle half of them earn between $21.42 and $28.31 an hour. About 830 work in the metro. That is 88.5 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For carpenters (47-2031, weighted 10%) the local median is $28.34 an hour, which is in line with the national $29.12. The middle half of them earn between $23.84 and $30.83 an hour. BLS counts 530 of them working in the area, 56.5 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $29.81 an hour, which is 4% above the national $28.78. The middle half of them earn between $28.39 and $34.85 an hour. BLS counts 540 of them working in the area, 57.6 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($33.63 an hour) instead of the median, the labor line grows by about $85. At the 25th percentile ($27.69) it shrinks by about $60. The total moves by 3.3% or 2.3%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 93,800 jobs in the Billings area. That makes it the 213th largest of the 300 metros we cover, with 0.06% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$27.69$30.12$33.63$27.411.10metro
Construction laborers (47-2061)30%$21.42$23.68$28.31$22.661.05metro
Carpenters (47-2031)10%$23.84$28.34$30.83$29.120.97metro
Operating engineers and other construction equipment operators (47-2073)10%$28.39$29.81$34.85$28.781.04metro
Blended100%1.06

When to schedule concrete patio in Billings

We use NOAA's 1991-2020 climate normals for Billings Logan Intl Ap (in the city). These are 30-year monthly averages, not forecasts.

May through September is the stretch where pouring concrete runs into the fewest weather problems in Billings (5 of 12 months). January, February, March, April, October, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Billings gets about 14 inches of precipitation in a normal year, including roughly 57 inches of snow. The wettest months are April, May and June (2.4 inches in May). Inside the workable window, July and August are the driest, at 1.2 and 0.9 inches. The station averages about 32 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Billings Logan Intl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan36180.6Cold
Feb39200.6Cold
Mar49270.9Cold
Apr57351.7Cold
May67442.4Workable
Jun77522.2Workable
Jul87591.2Workable
Aug86580.9Workable
Sep74491.4Workable
Oct59371.4Cold
Nov46270.6Cold
Dec36190.6Cold

Concrete patio: what moves the price in Billings

  • Permit

    Permits run $50-$400 where required. Many cities don't require one for a small at-grade patio.

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

Billings against nearby metros and the rest of Montana

Same job, same size (300 sq ft), priced for the nearest metros. Bozeman is the priciest of the group at $2,750. Rapid City is the cheapest at $2,400.

Comparison with nearby areas
AreaRangeMidpointvs. here
Billings, MTthis page$1,250 – $4,050$2,650
Bozeman, MT115 miles$1,300 – $4,250$2,750+4%
Idaho Falls, ID225 miles$1,200 – $3,800$2,500−6%
Missoula, MT275 miles$1,250 – $4,050$2,650level
Logan, UT300 miles$1,200 – $3,700$2,450−8%
Rapid City, SD305 miles$1,150 – $3,650$2,400−9%
Montana (statewide)$1,250 – $4,050$2,650level
United States$1,250 – $4,000$2,650−1%

Across 300 US metros, Billings comes in at #114 from the top. The priciest is Kahului, HI at $3,800; the cheapest is McAllen, TX at $2,100 (midpoints, 300 sq ft). Statewide, Billings is 0% above the Montana figure.

Other Montana metros

Montana metros compared with Billings
MetroSizeRangeMidpointvs. here
Bozeman, MT72,210 jobs$1,300 – $4,250$2,750+4%
Missoula, MT67,070 jobs$1,250 – $4,050$2,650level

Cities with a workforce like Billings's

Big cities and small ones price differently, so here is Billings against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Barnstable, MA94,110 jobs$1,300 – $4,350$2,850+7%
Iowa City, IA93,760 jobs$1,200 – $3,900$2,550−4%
Macon, GA95,030 jobs$1,100 – $3,400$2,250−15%
Oshkosh, WI93,750 jobs$1,300 – $4,450$2,900+8%

Cost by quality level and size in Billings

Three bands are cut from the same cited range and localized for Billings wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.

Basic

$1,250 to $2,350

Plain gray slab, broom finish, flat yard

Standard

$2,100 to $3,200

Colored or stained, saw-cut joints, minor grading

Premium

$2,950 to $4,050

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$450 – $910$790 – $1,250$1,150 – $1,600
12x16 (192 sq ft)$810 – $1,600$1,400 – $2,150$1,950 – $2,750
20x20 (400 sq ft)$1,650 – $3,100$2,750 – $4,200$3,850 – $5,300

Planning more than one job in Billings?

Because every project leans on different trades, Billings's wage level does not move all prices equally. Against the US midpoint, concrete driveway runs +3% and wood deck −3%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,500 – $5,200level
Stamped concrete400 sq ft$3,300 – $8,100+2%
Paver patio300 sq ft$3,000 – $5,400−1%
Wood deck300 sq ft$7,350 – $14,700−3%
Concrete driveway600 sq ft$3,750 – $9,500+3%
Asphalt driveway600 sq ft$2,950 – $7,200−3%

Add-ons priced for Billings

Extras are quoted nationally and then scaled to Billings by the average of the local wage index (1.06) and goods index (0.96), a factor of 1.01. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$910 – $3,050

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $2,100 to $3,200 for Billings, MT is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Billings, MT: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Billings: your questions

+How much does it cost to pour a concrete patio in Billings?

For 300 sq ft, expect $1,250 to $4,050 in the Billings area. A standard-spec job lands at $2,100 to $3,200. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Billings?

About $4 to $12.50 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Billings or Bozeman?

Bozeman is 115 miles away. The midpoint for 300 sq ft there is $2,750, which is 4% more than Billings ($2,650). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Billings?

About 54% at the midpoint, or $1,450 out of $2,650. Materials are 38% and permits 8%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Billings?

$810 to $2,750. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Billings?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the Billings area (our national range of $50 to $400 scaled by the local price level).

+Is Billings expensive for concrete patio compared with the rest of Montana?

Billings is 0% above the Montana statewide estimate ($2,650 at the midpoint). We cover 3 metros in Montana; see the state page to compare them.

+What do cement masons and concrete finishers earn in Billings?

The BLS median is $30.12 an hour in the Billings area, compared with $27.41 nationally. The 25th to 75th percentile range is $27.69 to $33.63.

+What do basic and premium concrete patio work cost in Billings?

For 300 sq ft, basic work runs $1,250 to $2,350 and premium work $2,950 to $4,050. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Billings?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through September. July and August are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Billings?

$910 to $3,050 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Billings

Concrete patio: all pricesConcrete patio in MontanaAll projects in BillingsMontana cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.