Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (600 sq ft)
$3,750 – $9,500
Per sq ft
$6.15 – $15.50
before permit
Versus US midpoint
+3%
US $6,450
Rank of 300 metros
#111
1 = most expensive

Billings homeowners pay roughly $3,750 to $9,500 to pour a concrete driveway at 600 sq ft, or $6.15 to $15.50 per sq ft (permit not included). Against the US midpoint, Billings is 3% higher. Cement masons and concrete finishers earn a median of $30.12 an hour in the Billings area, 10% above the US median of $27.41.

Estimate your concrete driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

5-inch with rebar and saw-cut joints, a border or one color

Add-ons

Estimated cost for 600 sq ft in Billings, MT, standard level

$5,450 to $7,800

About $8.95 to $12.50 per sq ft before permits. Labor is about 71% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$2,000
Labor$3,750$5,600
Permits and fees$90$140
Total$5,450$7,800
Save and get a PDF report

Cost breakdown for 600 sq ft in Billings, MT

Part of the jobLowMidpointHighShare
Materials$1,300$1,800$2,30027%
Labor$2,350$4,700$7,00071%
Permits and fees$45$120$1902%
Total$3,750$6,600$9,500100%

What is behind the Billings number

Labor is 71% of the midpoint bill here, against 69% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Billings the blended ratio comes out at 1.06.

On the materials line, the BEA goods price index for the Billings metro is 96.0 (US = 100). The midpoint materials bill for 600 sq ft comes to $1,800, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (93.5) and land at $45 to $190.

When to schedule concrete driveway in Billings

We use NOAA's 1991-2020 climate normals for Billings Logan Intl Ap (in the city). These are 30-year monthly averages, not forecasts.

May through September is the stretch where pouring concrete runs into the fewest weather problems in Billings (5 of 12 months). January, February, March, April, October, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Billings gets about 14 inches of precipitation in a normal year, including roughly 57 inches of snow. The wettest months are April, May and June (2.4 inches in May). Inside the workable window, July and August are the driest, at 1.2 and 0.9 inches. The station averages about 32 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Billings Logan Intl Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan36180.6Cold
Feb39200.6Cold
Mar49270.9Cold
Apr57351.7Cold
May67442.4Workable
Jun77522.2Workable
Jul87591.2Workable
Aug86580.9Workable
Sep74491.4Workable
Oct59371.4Cold
Nov46270.6Cold
Dec36190.6Cold

Why two Billings quotes can differ

  • Old driveway removal

    Tearing out the old surface adds about $2-$6 per sq ft, and some cities want the haul-off documented.

  • Grading and drainage

    Professional grading runs $3-$8 per sq ft or $700-$2,500 for a typical job. A sloped lot or poor soil raises it.

  • Finish

    Decorative driveways run $10-$25 per sq ft installed: colors and borders at $10-$15, stamped patterns at $15-$20, and high-end finishes at $20-$25+ (HomeGuide).

Add-ons priced for Billings

Extras are quoted nationally and then scaled to Billings by the average of the local wage index (1.06) and goods index (0.96), a factor of 1.01. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$610 – $1,800
Remove the old driveway$1,200 – $3,650

Billings: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Billings wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$3,750 to $6,050

Plain gray, 4-inch broom finish, flat site

Standard

$5,450 to $7,800

5-inch with rebar and saw-cut joints, a border or one color

Premium

$7,200 to $9,500

6-inch for heavy vehicles, stamped or colored, grading needed

Cost by size and quality level
SizeBasicStandardPremium
1-car (12x20), 240 sq ft$1,500 – $2,500$2,250 – $3,200$2,950 – $3,900
2-car (20x24), 480 sq ft$3,000 – $4,850$4,400 – $6,250$5,800 – $7,650
2-car + apron (600 sq ft)$3,750 – $6,050$5,450 – $7,800$7,200 – $9,500
3-car (900 sq ft)$5,600 – $9,000$8,150 – $11,600$10,700 – $14,200

Is Billings cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 600 sq ft range from $5,850 to $6,950 across Billings and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Billings, MTthis page$3,750 – $9,500$6,600
Bozeman, MT115 miles$3,900 – $10,000$6,950+5%
Idaho Falls, ID225 miles$3,450 – $8,750$6,100−8%
Missoula, MT275 miles$3,700 – $9,500$6,600level
Logan, UT300 miles$3,400 – $8,500$5,950−10%
Rapid City, SD305 miles$3,350 – $8,400$5,850−11%
Montana (statewide)$3,700 – $9,450$6,600level
United States$3,650 – $9,200$6,450−3%

Across 300 US metros, Billings comes in at #111 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, Billings is 0% above the Montana figure.

Other Montana metros

Montana metros compared with Billings
MetroSizeRangeMidpointvs. here
Bozeman, MT72,210 jobs$3,900 – $10,000$6,950+5%
Missoula, MT67,070 jobs$3,700 – $9,500$6,600level

Cities with a workforce like Billings's

Big cities and small ones price differently, so here is Billings against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Barnstable, MA94,110 jobs$4,000 – $10,300$7,150+8%
Iowa City, IA93,760 jobs$3,550 – $9,000$6,300−5%
Macon, GA95,030 jobs$3,100 – $7,650$5,400−19%
Oshkosh, WI93,750 jobs$4,100 – $10,700$7,400+11%

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Billings is 1.06 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $30.12 an hour, which is 10% above the national $27.41. The middle half of them earn between $27.69 and $33.63 an hour. BLS counts 140 of them working in the area, 14.9 for every 10,000 jobs (US: 13.3), so the local bench is about average.

Construction laborers (47-2061), 30% of the weighting: a median of $23.68 an hour, 5% above the US median of $22.66. The middle half of them earn between $21.42 and $28.31 an hour. About 830 work in the metro. That is 88.5 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $29.81 an hour, which is 4% above the national $28.78. The middle half of them earn between $28.39 and $34.85 an hour. BLS counts 540 of them working in the area, 57.6 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

For carpenters (47-2031, weighted 10%) the local median is $28.34 an hour, which is in line with the national $29.12. The middle half of them earn between $23.84 and $30.83 an hour. BLS counts 530 of them working in the area, 56.5 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($33.63 an hour) instead of the median, the labor line grows by about $280. At the 25th percentile ($27.69) it shrinks by about $200. The total moves by 4.3% or 3.0%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 93,800 jobs in the Billings area. That makes it the 213th largest of the 300 metros we cover, with 0.06% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$27.69$30.12$33.63$27.411.10metro
Construction laborers (47-2061)30%$21.42$23.68$28.31$22.661.05metro
Operating engineers and other construction equipment operators (47-2073)10%$28.39$29.81$34.85$28.781.04metro
Carpenters (47-2031)10%$23.84$28.34$30.83$29.120.97metro
Blended100%1.06

What nearby projects cost in Billings

Because every project leans on different trades, Billings's wage level does not move all prices equally. Against the US midpoint, stamped concrete runs +2% and asphalt driveway −3%.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$2,950 – $7,200−3%
Gravel driveway1,000 sq ft$2,500 – $10,200level
Concrete slab400 sq ft$2,500 – $5,200level
Stamped concrete400 sq ft$3,300 – $8,100+2%
Paver patio300 sq ft$3,000 – $5,400−1%
Concrete patio300 sq ft$1,250 – $4,050+1%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,450 to $7,800 for Billings, MT is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Billings, MT: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete driveway in Billings: your questions

+How much does it cost to pour a concrete driveway in Billings?

For 600 sq ft, expect $3,750 to $9,500 in the Billings area. A standard-spec job lands at $5,450 to $7,800. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete driveway in Billings?

About $6.15 to $15.50 per sq ft for materials and labor, plus $45 to $190 for the permit if one is needed. The US range is $6 to $15.

+Is concrete driveway cheaper in Billings or Bozeman?

Bozeman is 115 miles away. The midpoint for 600 sq ft there is $6,950, which is 5% more than Billings ($6,600). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Billings?

About 71% at the midpoint, or $4,700 out of $6,600. Materials are 27% and permits 2%. Nationally, labor is 69%.

+What would 2-car + apron (600 sq ft) cost in Billings?

$3,750 to $9,500. Pick a different size in the estimator above to get your own number.

+Does concrete driveway need a permit in Billings?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $190 for fees in the Billings area (our national range of $50 to $200 scaled by the local price level).

+Is Billings expensive for concrete driveway compared with the rest of Montana?

Billings is 0% above the Montana statewide estimate ($6,600 at the midpoint). We cover 3 metros in Montana; see the state page to compare them.

+What do cement masons and concrete finishers earn in Billings?

The BLS median is $30.12 an hour in the Billings area, compared with $27.41 nationally. The 25th to 75th percentile range is $27.69 to $33.63.

+What do basic and premium concrete driveway work cost in Billings?

For 600 sq ft, basic work runs $3,750 to $6,050 and premium work $7,200 to $9,500. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.

+When is the best time to pour a concrete driveway in Billings?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through September. July and August are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Billings?

$610 to $1,800 for 600 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete driveway near Billings

Concrete driveway: all pricesConcrete driveway in MontanaAll projects in BillingsMontana cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.