Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (600 sq ft)
$3,200 – $8,000
Per sq ft
$5.30 – $13
before permit
Versus US midpoint
−13%
US $6,450
Rank of 300 metros
#242
1 = most expensive

Odessa homeowners pay roughly $3,200 to $8,000 to pour a concrete driveway at 600 sq ft, or $5.30 to $13 per sq ft (permit not included). Against the US midpoint, Odessa is 13% lower. Cement masons and concrete finishers earn a median of $23.05 an hour in the Odessa area, 16% below the US median of $27.41.

Estimate your concrete driveway cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

5-inch with rebar and saw-cut joints, a border or one color

Add-ons

Estimated cost for 600 sq ft in Odessa, TX, standard level

$4,650 to $6,550

About $7.60 to $10.50 per sq ft before permits. Labor is about 66% of the bill.

Cost breakdown
PartLowHigh
Materials$1,600$1,950
Labor$3,000$4,450
Permits and fees$90$150
Total$4,650$6,550
Save and get a PDF report

Cost breakdown for 600 sq ft in Odessa, TX

Part of the jobLowMidpointHighShare
Materials$1,300$1,750$2,25032%
Labor$1,850$3,700$5,55066%
Permits and fees$45$120$1902%
Total$3,200$5,600$8,000100%

What is behind the Odessa number

We price the labor side from BLS wage data for 4 trades: cement masons and concrete finishers at 50%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%, carpenters at 10%. Weighted together, Odessa wages are 0.84 times the national level. Labor makes up about 66% of the midpoint estimate (69% at national prices).

On the materials line, the BEA goods price index for the Odessa metro is 93.8 (US = 100). The midpoint materials bill for 600 sq ft comes to $1,750, compared with $1,900 at national prices. Permit and inspection fees are scaled by the broader index (93.9) and land at $45 to $190.

Is Odessa cheap or dear? The local comparison

Of the five closest metros, 4 are cheaper than Odessa. El Paso is the lowest at about $5,150 (midpoint, 600 sq ft), 175 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Odessa, TXthis page$3,200 – $8,000$5,600
Midland, TX35 miles$3,250 – $8,150$5,700+2%
Lubbock, TX115 miles$3,150 – $7,750$5,450−3%
Abilene, TX170 miles$3,100 – $7,750$5,450−3%
El Paso, TX175 miles$3,000 – $7,300$5,150−8%
Amarillo, TX235 miles$3,150 – $7,750$5,450−3%
Texas (statewide)$3,250 – $8,100$5,700+1%
United States$3,650 – $9,200$6,450+15%

Across 300 US metros, Odessa comes in at #242 from the top. The priciest is Kahului, HI at $10,000; the cheapest is McAllen, TX at $4,950 (midpoints, 600 sq ft). Statewide, Odessa is 1% below the Texas figure.

Other Texas metros

Texas metros compared with Odessa
MetroSizeRangeMidpointvs. here
Dallas, TX4,049,800 jobs$3,400 – $8,450$5,950+6%
Houston, TX3,289,720 jobs$3,300 – $8,150$5,750+2%
Austin, TX1,293,690 jobs$3,300 – $8,250$5,800+3%
San Antonio, TX1,126,880 jobs$3,150 – $7,900$5,550−1%
El Paso, TX339,120 jobs$3,000 – $7,300$5,150−8%
McAllen, TX296,700 jobs$2,850 – $7,000$4,950−12%

Cities with a workforce like Odessa's

Big cities and small ones price differently, so here is Odessa against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Johnson City, TN81,690 jobs$3,250 – $8,050$5,650level
Greenville, NC80,770 jobs$3,100 – $7,600$5,350−5%
Idaho Falls, ID81,840 jobs$3,450 – $8,750$6,100+9%
Jefferson City, MO80,220 jobs$3,800 – $9,650$6,700+20%

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Odessa is 0.84 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $23.05 an hour, which is 16% below the national $27.41. The middle half of them earn between $20.99 and $25.96 an hour. BLS counts 110 of them working in the area, 13.6 for every 10,000 jobs (US: 13.3), so the local bench is about average.

Construction laborers (47-2061), 30% of the weighting: a median of $18.45 an hour, 19% below the US median of $22.66. The middle half of them earn between $17.34 and $22.12 an hour. About 970 work in the metro. That is 119.9 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $26.65 an hour, which is 7% below the national $28.78. The middle half of them earn between $23.13 and $29.64 an hour. BLS counts 670 of them working in the area, 82.8 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

For carpenters (47-2031, weighted 10%) the local median is $25.12 an hour, which is 14% below the national $29.12. The middle half of them earn between $22.57 and $28.35 an hour. BLS counts 180 of them working in the area, 22.2 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($25.96 an hour) instead of the median, the labor line grows by about $230. At the 25th percentile ($20.99) it shrinks by about $170. The total moves by 4.2% or 3.0%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 80,910 jobs in the Odessa area. That makes it the 235th largest of the 300 metros we cover, with 0.05% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$20.99$23.05$25.96$27.410.84metro
Construction laborers (47-2061)30%$17.34$18.45$22.12$22.660.81metro
Operating engineers and other construction equipment operators (47-2073)10%$23.13$26.65$29.64$28.780.93metro
Carpenters (47-2031)10%$22.57$25.12$28.35$29.120.86metro
Blended100%0.84

When to schedule concrete driveway in Odessa

We use NOAA's 1991-2020 climate normals for Odessa (in the city). These are 30-year monthly averages, not forecasts.

March through May and September through November are the stretches where pouring concrete runs into the fewest weather problems in Odessa (6 of 12 months). January, February and December have an average overnight low of 40°F or below; June, July and August have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in June, July and August, crews often start early, wet the base and plan for faster set times.

Odessa gets about 12 inches of precipitation in a normal year. The wettest months are May, August and September (1.6 inches in May). Inside the workable window, March and November are the driest, at 0.7 and 0.6 inches. The station averages about 106 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Odessa (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan57320.7Cold
Feb62360.5Cold
Mar71440.7Workable
Apr79510.7Workable
May87611.6Workable
Jun94681.0Hot
Jul94711.5Hot
Aug93701.6Hot
Sep85621.5Workable
Oct77531.3Workable
Nov66410.6Workable
Dec58330.6Cold

Why two Odessa quotes can differ

  • Finish

    Decorative driveways run $10-$25 per sq ft installed: colors and borders at $10-$15, stamped patterns at $15-$20, and high-end finishes at $20-$25+ (HomeGuide).

  • Permits and the apron

    A driveway permit is typically $50-$200 and is often required for new work. The apron where the driveway meets the street can need a separate right-of-way permit.

  • Thickness

    HomeGuide prices a standard 4-inch driveway at $6-$15/sq ft and a 6-inch one, recommended for heavy vehicles, at $8-$20/sq ft.

Optional extras in Odessa

Extras are quoted nationally and then scaled to Odessa by the average of the local wage index (0.84) and goods index (0.94), a factor of 0.89. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$530 – $1,600
Remove the old driveway$1,050 – $3,200

Planning more than one job in Odessa?

Because every project leans on different trades, Odessa's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs −8% and concrete patio −11%.

Related projects with local prices
ProjectSizeRangevs. US
Asphalt driveway600 sq ft$2,800 – $6,800−8%
Gravel driveway1,000 sq ft$2,250 – $9,250−10%
Concrete slab400 sq ft$2,200 – $4,700−10%
Stamped concrete400 sq ft$2,900 – $7,050−11%
Paver patio300 sq ft$2,700 – $4,850−11%
Concrete patio300 sq ft$1,150 – $3,550−11%

Pick a size, pick a tier: concrete driveway pricing in Odessa

Three bands are cut from the same cited range and localized for Odessa wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$3,200 to $5,150

Plain gray, 4-inch broom finish, flat site

Standard

$4,650 to $6,550

5-inch with rebar and saw-cut joints, a border or one color

Premium

$6,100 to $8,000

6-inch for heavy vehicles, stamped or colored, grading needed

Cost by size and quality level
SizeBasicStandardPremium
1-car (12x20), 240 sq ft$1,300 – $2,100$1,900 – $2,700$2,500 – $3,300
2-car (20x24), 480 sq ft$2,600 – $4,100$3,750 – $5,300$4,900 – $6,450
2-car + apron (600 sq ft)$3,200 – $5,150$4,650 – $6,550$6,100 – $8,000
3-car (900 sq ft)$4,800 – $7,650$6,950 – $9,800$9,050 – $11,900

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,650 to $6,550 for Odessa, TX is attached.

Take this estimate with you: PDF report, $9

Multi-page report for Odessa, TX: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete driveway in Odessa: your questions

+How much does it cost to pour a concrete driveway in Odessa?

For 600 sq ft, expect $3,200 to $8,000 in the Odessa area. A standard-spec job lands at $4,650 to $6,550. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete driveway in Odessa?

About $5.30 to $13 per sq ft for materials and labor, plus $45 to $190 for the permit if one is needed. The US range is $6 to $15.

+Is concrete driveway cheaper in Odessa or Midland?

Midland is 35 miles away. The midpoint for 600 sq ft there is $5,700, which is 2% more than Odessa ($5,600). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Odessa?

About 66% at the midpoint, or $3,700 out of $5,600. Materials are 32% and permits 2%. Nationally, labor is 69%.

+What would 2-car + apron (600 sq ft) cost in Odessa?

$3,200 to $8,000. Pick a different size in the estimator above to get your own number.

+Does concrete driveway need a permit in Odessa?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $190 for fees in the Odessa area (our national range of $50 to $200 scaled by the local price level).

+Is Odessa expensive for concrete driveway compared with the rest of Texas?

Odessa is 1% below the Texas statewide estimate ($5,700 at the midpoint). We cover 21 metros in Texas; see the state page to compare them.

+What do cement masons and concrete finishers earn in Odessa?

The BLS median is $23.05 an hour in the Odessa area, compared with $27.41 nationally. The 25th to 75th percentile range is $20.99 to $25.96.

+What do basic and premium concrete driveway work cost in Odessa?

For 600 sq ft, basic work runs $3,200 to $5,150 and premium work $6,100 to $8,000. Basic means: plain gray, 4-inch broom finish, flat site. Premium means: 6-inch for heavy vehicles, stamped or colored, grading needed.

+When is the best time to pour a concrete driveway in Odessa?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through May and September through November. March and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Odessa?

$530 to $1,600 for 600 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete driveway near Odessa

Concrete driveway: all pricesConcrete driveway in TexasAll projects in OdessaTexas cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 600 sq ft, 4-inch driveway line ($1,400-$2,400 in materials) divided by 600 sq ft.