Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.

Statewide range (400 sq ft)
$3,600 – $8,900
Per sq ft
$8.90 – $21.50
before permit
Versus US midpoint
+12%
US $5,600
Metros covered
9

New York prices for stamped concrete: $3,600 to $8,900 for 400 sq ft, or $8.90 to $21.50 per sq ft without the permit. The state midpoint is 12% above the national one. Local wages for cement masons and concrete finishers are $30.79 an hour.

Inside New York, the metros we cover range from $5,700 (Kingston) to $6,550 (New York) at the midpoint. Pick your closest city in the table for a tighter number.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in New York (statewide), standard level

$5,200 to $7,300

About $12.50 to $17.50 per sq ft before permits. Labor is about 50% of the bill.

Cost breakdown
PartLowHigh
Materials$2,500$3,300
Labor$2,550$3,750
Permits and fees$150$280
Total$5,200$7,300
Save and get a PDF report

Cost breakdown for 400 sq ft in New York

Part of the jobLowMidpointHighShare
Materials$1,950$2,900$3,85046%
Labor$1,650$3,150$4,65050%
Permits and fees$55$220$3803%
Total$3,600$6,250$8,900100%

Wages behind the New York number

New York's labor line is priced from 3 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 1.17 times the national level.

Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $30.79 an hour, 12% above the US median of $27.41. The middle half of them earn between $27.18 and $40.59 an hour. About 9,060 work in the state. That is 9.4 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $26.89 an hour, which is 19% above the national $22.66. The middle half of them earn between $21.13 and $38.18 an hour. BLS counts 52,090 of them working in the state, 53.8 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $38.94 an hour, 35% above the US median of $28.78. The middle half of them earn between $29.11 and $54.29 an hour. About 14,490 work in the state. That is 15.0 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A crew paid at the 75th percentile for cement masons and concrete finishers ($40.59 an hour) would add about $580 to the statewide midpoint; one at the 25th percentile ($27.18) would take off about $210. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.

BLS counts 9,688,000 jobs across New York (May 2025), which is 6.2% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$27.18$30.79$40.59$27.411.12state
Construction laborers (47-2061)30%$21.13$26.89$38.18$22.661.19state
Operating engineers and other construction equipment operators (47-2073)10%$29.11$38.94$54.29$28.781.35state
Blended100%1.17

Why two New York quotes can differ

  • Pattern and color

    Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

  • Sealing and vapor barrier

    Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

Basic, standard or premium: New York prices

Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).

Basic

$3,600 to $5,750

Basic pattern, one integral color

Standard

$5,200 to $7,300

Two-tone color release and a border

Premium

$6,800 to $8,900

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,850 – $2,950$2,700 – $3,800$3,500 – $4,650
20x20 patio (400 sq ft)$3,600 – $5,750$5,200 – $7,300$6,800 – $8,900
2-car driveway (600 sq ft)$5,400 – $8,500$7,750 – $10,800$10,100 – $13,200

Add-ons priced for New York

Add-ons start from national price ranges and are scaled by 1.12 for New York, which is the average of the area's wage index (1.17) and goods price index (1.07). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a vapor barrier$220 – $450

New York against its neighbors

New York ranks 7 of 51 (the 50 states plus DC) for stamped concrete, where 1 is the most expensive. The costliest is Hawaii at $7,800 and the cheapest Arkansas at $4,850, both for 400 sq ft at the midpoint. New York sits at $6,250. The five states closest by workforce center are listed below.

States near New York, same project and size
StateDistanceRangeMidpointvs. here
Connecticut80 miles away$3,350 – $8,350$5,850−6%
New Jersey100 miles away$3,650 – $9,050$6,350+2%
Pennsylvania140 miles away$3,350 – $8,150$5,750−8%
Delaware150 miles away$3,150 – $7,750$5,450−13%
Rhode Island160 miles away$3,400 – $8,400$5,900−6%

New York metro-by-metro prices

1 of the 9 metros sit above the statewide midpoint of $6,250, and the top-to-bottom gap is 15%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.

MetroRange (400 sq ft)Midpointvs. state
New York, NY$3,800 – $9,300$6,550+5%
Poughkeepsie, NY$3,600 – $8,800$6,200−1%
Albany, NY$3,450 – $8,500$5,950−5%
Buffalo, NY$3,400 – $8,350$5,850−6%
Rochester, NY$3,350 – $8,250$5,800−7%
Binghamton, NY$3,350 – $8,250$5,800−7%
Syracuse, NY$3,350 – $8,200$5,750−8%
Utica, NY$3,300 – $8,100$5,700−9%
Kingston, NY$3,300 – $8,050$5,700−9%

Other New York jobs that often go with stamped concrete

Each project weights the trades differently, so New York's wage level does not push every price by the same amount. Compared with the US midpoint, gravel driveway is +17% and concrete slab +11%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,400 – $4,500+12%
Concrete driveway600 sq ft$4,150 – $10,500+14%
Paver patio300 sq ft$3,500 – $6,350+17%
Concrete slab400 sq ft$2,750 – $5,800+11%
Asphalt driveway600 sq ft$3,450 – $8,450+14%
Gravel driveway1,000 sq ft$2,950 – $11,900+17%

New York seasons and stamped concrete

Weather decides when pouring concrete can happen, and New York is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.

New York has the longest comfortable season of the metros we cover in New York at 8 months (April through November); Kingston has the shortest at 5 (May through September). Rainfall runs from 35 inches a year in Rochester to 51 inches in Kingston.

We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.

Climate by metro (NOAA 1991-2020 normals)
MetroJan avg low °FJul avg high °FPrecip (in/yr)Comfortable months
New York2885508: April through November
Buffalo1980416: May through October
Rochester1983356: May through October
Albany1684416: May through October
Syracuse1782406: May through October
Poughkeepsie1983476: May through October
Utica1481446: May through October
Binghamton1678426: May through October
Kingston1186515: May through September

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,200 to $7,300 for New York is attached.

Detailed stamped concrete report for New York, $9

The report lays out the stamped concrete numbers for New York line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in New York: your questions

+How much does it cost to pour stamped concrete in New York?

$3,600 to $8,900 for 400 sq ft, using statewide wages and prices. Metro areas inside New York can sit above or below that.

+Which city in New York is cheapest for stamped concrete?

Kingston at about $5,700 (midpoint, 400 sq ft). The priciest is New York at $6,550.

+Is stamped concrete cheaper in New York than the US average?

It is 12% more expensive: $6,250 against $5,600 for 400 sq ft at the midpoint.

+What share of the price is labor in New York?

About 50% ($3,150). Materials are 46%. Statewide labor for this job is weighted 1.17x the national wage level.

+What do cement masons and concrete finishers earn in New York?

The BLS statewide median is $30.79 an hour, against $27.41 for the US. The 25th to 75th percentile range is $27.18 to $40.59.

+Where does New York rank for stamped concrete costs?

7th most expensive of 51 (the 50 states plus DC) at the midpoint, $6,250 for 400 sq ft. Rank 1 is the costliest.

+What do basic and premium stamped concrete work cost in New York?

For 400 sq ft, basic work runs $3,600 to $5,750 and premium work $6,800 to $8,900. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+Does the season matter for stamped concrete in New York?

Yes where winters or summers are hard. Of the New York metros we cover, New York has the most comfortable months (8 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.

+What does "add a vapor barrier" add in New York?

$220 to $450 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.

Stamped concrete by city in New York

Stamped concrete: all pricesNew York cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.