Retaining wall cost in Binghamton, NY

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (200 sq ft of wall face)
$7,900 – $14,500
Per sq ft of wall face
$39.50 – $70
before permit
Versus US midpoint
+9%
US $10,300
Rank of 300 metros
#70
1 = most expensive

If you want to build a retaining wall in Binghamton, plan on $7,900 to $14,500 for 200 sq ft of wall face, all in. Per sq ft of wall face, that is $39.50 to $70 for materials and labor, with the permit on top. The local midpoint runs 9% higher than the national one. Brickmasons and blockmasons earn a median of $40.58 an hour in the Binghamton area, 36% above the US median of $29.87.

Estimate your retaining wall cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard segmental block wall with drainage

Estimated cost for 200 sq ft of wall face in Binghamton, NY, standard level

$9,850 to $12,500

About $48.50 to $61 per sq ft of wall face before permits. Labor is about 51% of the bill.

Cost breakdown
PartLowHigh
Materials$4,300$6,300
Labor$5,450$5,900
Permits and fees$160$310
Total$9,850$12,500
Save and get a PDF report

Cost breakdown for 200 sq ft of wall face in Binghamton, NY

Part of the jobLowMidpointHighShare
Materials$2,800$5,300$7,80047%
Labor$5,050$5,650$6,25051%
Permits and fees$45$230$4202%
Total$7,900$11,200$14,500100%

Where the Binghamton price comes from

The wage side of the estimate leans on brickmasons and blockmasons, who do 50% of the hours on a typical job. Their local median is $40.58 an hour. Add the other trades involved and the blended wage index for Binghamton is 1.21 (US = 1.00), which puts labor at 51% of the total. BLS does not publish this trade for the metro, so we used the New York statewide median.

On the materials line, the BEA goods price index for the Binghamton metro is 99.7 (US = 100). The midpoint materials bill for 200 sq ft of wall face comes to $5,300, compared with $5,300 at national prices. Permit and inspection fees are scaled by the broader index (92.9) and land at $45 to $420.

Data note: 50% of the labor weighting for this project uses a statewide median because BLS has no published metro figure for that trade in Binghamton. The wage table below marks each row.

Climate in Binghamton: timing your retaining wall job

We use NOAA's 1991-2020 climate normals for Binghamton (10 miles from the city center). These are 30-year monthly averages, not forecasts.

April through October is the stretch where digging, grading and setting material in the ground runs into the fewest weather problems in Binghamton (7 of 12 months). January, February, March, November and December have an average overnight low at or below freezing (32°F).

In January, February, March, November and December the average low is at or below freezing, which means frozen ground and slower digging, compaction and sod or stone placement. NOAA counts about 142 days a year with a low at or below 32°F at this station.

Binghamton gets about 42 inches of precipitation in a normal year, including roughly 87 inches of snow. The wettest months are June, August and September (4.7 inches in June). Inside the workable window, April and October are the driest, at 3.6 and 3.8 inches. The station averages about 2 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Binghamton (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan30162.6Cold
Feb32172.4Cold
Mar41243.0Cold
Apr54353.6Workable
May66463.8Workable
Jun74554.7Workable
Jul78593.8Workable
Aug77584.1Workable
Sep70514.0Workable
Oct57413.8Workable
Nov45313.1Cold
Dec34223.1Cold

Why two Binghamton quotes can differ

  • Rebuilding

    Replacing an old wall adds $15-$30 per linear foot for demolition plus disposal.

  • Permit

    Permits cost $50-$450 depending on location and wall size.

  • Height

    Walls over 4 feet need engineering, deeper excavation and more skilled labor; many cities require permits over 3-4 feet (HomeGuide).

Binghamton against nearby metros and the rest of New York

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 200 sq ft of wall face range from $10,400 to $11,300 across Binghamton and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Binghamton, NYthis page$7,900 – $14,500$11,200
Scranton, PA60 miles$7,350 – $13,800$10,600−5%
Syracuse, NY60 miles$7,550 – $14,000$10,800−4%
Kingston, NY90 miles$8,000 – $14,600$11,300+1%
Utica, NY90 miles$7,900 – $14,500$11,200level
Allentown, PA100 miles$7,200 – $13,600$10,400−7%
New York (statewide)$8,550 – $15,600$12,100+8%
United States$7,050 – $13,500$10,300−8%

Across 300 US metros, Binghamton comes in at #70 from the top. The priciest is Kahului, HI at $13,500; the cheapest is El Paso, TX at $8,850 (midpoints, 200 sq ft of wall face). Statewide, Binghamton is 8% below the New York figure.

Other New York metros

New York metros compared with Binghamton
MetroSizeRangeMidpointvs. here
New York, NY9,492,000 jobs$9,250 – $16,600$12,900+16%
Buffalo, NY534,550 jobs$7,800 – $14,400$11,100−1%
Rochester, NY494,280 jobs$7,600 – $14,100$10,800−3%
Albany, NY449,410 jobs$8,000 – $14,600$11,300+1%
Syracuse, NY300,130 jobs$7,550 – $14,000$10,800−4%
Poughkeepsie, NY268,970 jobs$8,450 – $15,700$12,100+8%

Cities with a workforce like Binghamton's

Big cities and small ones price differently, so here is Binghamton against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Lynchburg, VA97,190 jobs$6,250 – $12,300$9,250−17%
Yakima, WA97,010 jobs$8,100 – $15,000$11,500+3%
Slidell, LA98,240 jobs$6,350 – $12,300$9,300−17%
Athens, GA95,800 jobs$6,050 – $12,000$9,050−19%

Related projects, priced for Binghamton

Because every project leans on different trades, Binghamton's wage level does not move all prices equally. Against the US midpoint, sprinkler system runs +10% and sod installation −1%.

Related projects with local prices
ProjectSizeRangevs. US
French drain60 linear ft$640 – $2,250+7%
Paver patio300 sq ft$3,250 – $5,900+8%
Concrete driveway600 sq ft$3,800 – $9,650+5%
Sod installation1,500 sq ft$1,500 – $3,250−1%
Sprinkler system4,000 sq ft of lawn$4,400 – $11,000+10%
Inground pool450 sq ft$38,800 – $121,000+7%

Cost by quality level and size in Binghamton

Three bands are cut from the same cited range and localized for Binghamton wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 4 common sizes.

Basic

$7,900 to $10,500

Short block wall, easy access

Standard

$9,850 to $12,500

Standard segmental block wall with drainage

Premium

$11,800 to $14,500

Tall or stone wall, engineered, hard access

Cost by size and quality level
SizeBasicStandardPremium
short garden wall (4x25 ft), 100 sq ft of wall face$4,000 – $5,350$5,000 – $6,400$6,050 – $7,450
20 ft x 4 ft (80 sq ft of wall face)$3,200 – $4,350$4,050 – $5,200$4,900 – $6,050
40 ft x 4 ft (160 sq ft of wall face)$6,350 – $8,450$7,950 – $10,100$9,550 – $11,700
40 ft x 6 ft (240 sq ft of wall face)$9,500 – $12,600$11,800 – $14,900$14,200 – $17,300

Binghamton labor market for retaining wall

Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Binghamton is 1.21 times the national level.

Brickmasons and blockmasons (47-2021) carry 50% of the labor weighting. BLS does not publish this trade for the Binghamton metro, so we used the New York statewide median: $40.58 an hour against $29.87 for the US. The middle half of them earn between $35.65 and $51.73 an hour.

Construction laborers (47-2061), 30% of the weighting: a median of $24.40 an hour, 8% above the US median of $22.66. The middle half of them earn between $21.53 and $35.23 an hour. About 650 work in the metro. That is 67.0 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 20%) the local median is $29.33 an hour, which is in line with the national $28.78. The middle half of them earn between $23.48 and $46.62 an hour. BLS counts 330 of them working in the area, 34.0 for every 10,000 jobs (US: 30.7), so the local bench is about average.

Quotes come from real crews, not medians. If the brickmasons and blockmasons on your job are paid at the 75th percentile ($51.73 an hour) instead of the median, the labor line grows by about $880. At the 25th percentile ($35.65) it shrinks by about $390. The total moves by 7.8% or 3.5%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 97,030 jobs in the Binghamton area. That makes it the 207th largest of the 300 metros we cover, with 0.06% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Brickmasons and blockmasons (47-2021)50%$35.65$40.58$51.73$29.871.36state
Construction laborers (47-2061)30%$21.53$24.40$35.23$22.661.08metro
Operating engineers and other construction equipment operators (47-2073)20%$23.48$29.33$46.62$28.781.02metro
Blended100%1.21

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $9,850 to $12,500 for Binghamton, NY is attached.

A detailed PDF report of this estimate, $9

The report lays out the retaining wall numbers for Binghamton, NY line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Retaining wall in Binghamton: your questions

+How much does it cost to build a retaining wall in Binghamton?

For 200 sq ft of wall face, expect $7,900 to $14,500 in the Binghamton area. A standard-spec job lands at $9,850 to $12,500. Small jobs usually cost more per sq ft of wall face and large ones less.

+What is the price per sq ft of wall face for retaining wall in Binghamton?

About $39.50 to $70 per sq ft of wall face for materials and labor, plus $45 to $420 for the permit if one is needed. The US range is $35 to $65.

+Is retaining wall cheaper in Binghamton or Scranton?

Scranton is 60 miles away. The midpoint for 200 sq ft of wall face there is $10,600, which is 5% less than Binghamton ($11,200). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Binghamton?

About 51% at the midpoint, or $5,650 out of $11,200. Materials are 47% and permits 2%. Nationally, labor is 46%.

+What would 40 ft x 4 ft (160 sq ft of wall face) cost in Binghamton?

$6,350 to $11,700. Pick a different size in the estimator above to get your own number.

+Does retaining wall need a permit in Binghamton?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $420 for fees in the Binghamton area (our national range of $50 to $450 scaled by the local price level).

+Is Binghamton expensive for retaining wall compared with the rest of New York?

Binghamton is 8% below the New York statewide estimate ($12,100 at the midpoint). We cover 9 metros in New York; see the state page to compare them.

+What do brickmasons and blockmasons earn in Binghamton?

BLS has no published metro figure here, so we use the statewide median of $40.58 an hour, compared with $29.87 nationally. The 25th to 75th percentile range is $35.65 to $51.73.

+What do basic and premium retaining wall work cost in Binghamton?

For 200 sq ft of wall face, basic work runs $7,900 to $10,500 and premium work $11,800 to $14,500. Basic means: short block wall, easy access. Premium means: tall or stone wall, engineered, hard access.

+When is the best time to build a retaining wall in Binghamton?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are April through October. April and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

Retaining wall near Binghamton

Retaining wall: all pricesRetaining wall in New YorkAll projects in BinghamtonNew York cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 40% of the low installed price and 60% of the high one, since HomeGuide says labor is 40-60% of the total project cost.