Detached garage cost in Provo, UT
Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.
- Typical range (576 sq ft)
- $27,100 – $54,400
- Per sq ft
- $47 – $93.50
- before permit
- Versus US midpoint
- −6%
- US $43,500
- Rank of 300 metros
- #174
- 1 = most expensive
Local price for a detached garage in the Provo area: $27,100 to $54,400 for 576 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 6% lower than the US figure. Carpenters earn a median of $25.59 an hour in the Provo area, 12% below the US median of $29.12.
Estimate your detached garage cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 576 sq ft in Provo, UT, standard level
$35,300 to $46,200
About $61 to $79.50 per sq ft before permits. Labor is about 48% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $18,100 | $23,600 |
| Labor | $17,000 | $22,200 |
| Permits and fees | $250 | $390 |
| Total | $35,300 | $46,200 |
Cost breakdown for 576 sq ft in Provo, UT
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $13,900 | $20,800 | $27,800 | 51% |
| Labor | $13,100 | $19,600 | $26,200 | 48% |
| Permits and fees | $150 | $320 | $490 | 1% |
| Total | $27,100 | $40,800 | $54,400 | 100% |
Why Provo prices look the way they do
The wage side of the estimate leans on carpenters, who do 45% of the hours on a typical job. Their local median is $25.59 an hour. Add the other trades involved and the blended wage index for Provo is 0.91 (US = 1.00), which puts labor at 48% of the total.
Materials are scaled with BEA's regional price parity for goods. Provo is at 96.4 against 100 for the US, so a materials line of $21,600 nationally becomes $20,800 here (midpoint, 576 sq ft). Permits follow the all-items index of 98.2: $150 to $490.
Planning more than one job in Provo?
Jobs that often go together with detached garage are priced below at their usual sizes, using the same Provo wage and price inputs. Compared with national midpoints, concrete slab comes out highest (−5%) and home addition lowest (−9%); the gap comes from the trades each job uses.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete slab | 400 sq ft | $2,350 – $4,950 | −5% |
| Garage door | 1 door | $660 – $3,550 | −5% |
| Concrete driveway | 600 sq ft | $3,450 – $8,650 | −6% |
| Home addition | 300 sq ft | $34,600 – $70,200 | −9% |
Specs and site conditions that change a Provo bid
Permits
You need a permit for a detached garage: $150-$500 on average, with separate electrical or plumbing permits if those are involved.
Electrical
Running power to a detached garage costs $1,000-$3,800 for a standard build and $5,000 or more for a long trench or amperage upgrade (Angi, Trusscore).
Size and finish level
HomeGuide puts a 2-car detached garage at $20,000-$57,600, with the spread driven by how finished it is.
Is Provo cheap or dear? The local comparison
Same job, same size (576 sq ft), priced for the nearest metros. Salt Lake City is the priciest of the group at $42,600. St. George is the cheapest at $39,500.
| Area | Range | Midpoint | vs. here |
|---|---|---|---|
| Provo, UTthis page | $27,100 – $54,400 | $40,800 | |
| Salt Lake City, UT60 miles | $28,300 – $56,900 | $42,600 | +4% |
| Ogden, UT90 miles | $26,800 – $53,700 | $40,200 | −1% |
| Logan, UT145 miles | $26,600 – $53,300 | $39,900 | −2% |
| St. George, UT190 miles | $26,300 – $52,700 | $39,500 | −3% |
| Grand Junction, CO215 miles | $27,900 – $55,900 | $41,900 | +3% |
| Utah (statewide) | $27,300 – $54,800 | $41,000 | +1% |
| United States | $29,000 – $58,100 | $43,500 | +7% |
Out of the 300 metros we cover, Provo ranks #174 for the cost of this job (#1 is the most expensive). Statewide, Provo is 1% below the Utah figure.
Elsewhere in Utah
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Salt Lake City, UT | 826,210 jobs | $28,300 – $56,900 | $42,600 | +4% |
| Ogden, UT | 271,370 jobs | $26,800 – $53,700 | $40,200 | −1% |
| St. George, UT | 90,500 jobs | $26,300 – $52,700 | $39,500 | −3% |
| Logan, UT | 66,800 jobs | $26,600 – $53,300 | $39,900 | −2% |
Metros of a similar size
Big cities and small ones price differently, so here is Provo against the 4 metros with the closest total employment.
| Metro | Size | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Cape Coral, FL | 304,790 jobs | $26,300 – $52,800 | $39,500 | −3% |
| Syracuse, NY | 300,130 jobs | $29,900 – $59,900 | $44,900 | +10% |
| Wichita, KS | 308,570 jobs | $26,200 – $52,500 | $39,400 | −3% |
| McAllen, TX | 296,700 jobs | $23,900 – $48,000 | $35,900 | −12% |
Who does the work: Provo trade wages
The labor line is built from BLS wage data, one trade at a time. This job draws on 5 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Provo the blend is 0.91.
Carpenters (47-2031), 45% of the weighting: a median of $25.59 an hour, 12% below the US median of $29.12. The middle half of them earn between $21.92 and $29.39 an hour. About 3,080 work in the metro. That is 101.1 per 10,000 jobs, compared with 43.1 nationally, which suggests plenty of local crews to bid.
For construction laborers (47-2061, weighted 20%) the local median is $22.43 an hour, which is in line with the national $22.66. The middle half of them earn between $18.25 and $25.27 an hour. BLS counts 4,760 of them working in the area, 156.2 for every 10,000 jobs (US: 70.5), so the local bench is deeper than average.
Cement masons and concrete finishers (47-2051), 15% of the weighting: a median of $24.60 an hour, 10% below the US median of $27.41. The middle half of them earn between $22.53 and $29.09 an hour. About 1,210 work in the metro. That is 39.7 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.
For electricians (47-2111, weighted 10%) the local median is $29.26 an hour, which is 4% below the national $30.38. The middle half of them earn between $22.89 and $37.29 an hour. BLS counts 2,080 of them working in the area, 68.3 for every 10,000 jobs (US: 48.7), so the local bench is deeper than average.
Roofers (47-2181), 10% of the weighting: a median of $22.41 an hour, 16% below the US median of $26.65. The middle half of them earn between $18.35 and $29.91 an hour. About 280 work in the metro. That is 9.2 per 10,000 jobs, compared with 8.7 nationally, so the supply of crews looks typical.
A quick sensitivity check: moving the lead trade (carpenters) from the median to the 75th percentile wage adds about $1,250 to the midpoint estimate; the 25th percentile takes off about $1,250. That is a swing of roughly 3.0% to 3.1% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.
Provo-Orem-Lehi has 304,660 jobs in total (BLS, May 2025), ranking 84th by size among the 300 metros on this site.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Carpenters (47-2031) | 45% | $21.92 | $25.59 | $29.39 | $29.12 | 0.88 | metro |
| Cement masons and concrete finishers (47-2051) | 15% | $22.53 | $24.60 | $29.09 | $27.41 | 0.90 | metro |
| Construction laborers (47-2061) | 20% | $18.25 | $22.43 | $25.27 | $22.66 | 0.99 | metro |
| Electricians (47-2111) | 10% | $22.89 | $29.26 | $37.29 | $30.38 | 0.96 | metro |
| Roofers (47-2181) | 10% | $18.35 | $22.41 | $29.91 | $26.65 | 0.84 | metro |
| Blended | 100% | 0.91 | |||||
The best months for detached garage in Provo
Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Provo Byu (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.
For pouring concrete, the comfortable months in Provo are May through June and September through October: 4 of 12. Outside them, January, February, March, April, November and December have an average overnight low of 40°F or below, and July and August have an average daytime high of 90°F or more.
The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.
Heat matters for concrete as well. With average highs of 90°F or more in July and August, crews often start early, wet the base and plan for faster set times.
Provo gets about 17 inches of precipitation in a normal year, including roughly 45 inches of snow. The wettest months are January, April and May (2.0 inches in May). Inside the workable window, June and September are the driest, at 0.9 and 1.2 inches. The station averages about 74 days a year at 90°F or above.
We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.
| Month | Avg high °F | Avg low °F | Precip (in) | For this job |
|---|---|---|---|---|
| Jan | 41 | 24 | 1.9 | Cold |
| Feb | 48 | 28 | 1.6 | Cold |
| Mar | 58 | 35 | 1.6 | Cold |
| Apr | 66 | 40 | 1.9 | Cold |
| May | 76 | 47 | 2.0 | Workable |
| Jun | 87 | 55 | 0.9 | Workable |
| Jul | 95 | 62 | 0.5 | Hot |
| Aug | 93 | 61 | 0.7 | Hot |
| Sep | 83 | 52 | 1.2 | Workable |
| Oct | 69 | 41 | 1.6 | Workable |
| Nov | 53 | 32 | 1.4 | Cold |
| Dec | 41 | 24 | 1.8 | Cold |
Provo: what basic, standard and premium work costs
The cited range is split into basic, standard and premium bands, then scaled to Provo. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 1-car (12x20), 240 sq ft to 3-car (900 sq ft).
Basic
$27,100 to $38,000
Basic shell: slab, framing, siding, a roll-up door
Standard
$35,300 to $46,200
Finished exterior, insulated, electrical and a nicer door
Premium
$43,500 to $54,400
Insulated and drywalled, heat and cooling, upgraded finishes
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 1-car (12x20), 240 sq ft | $11,400 – $16,000 | $14,900 – $19,500 | $18,300 – $23,000 |
| 2-car (24x24), 576 sq ft | $27,100 – $38,000 | $35,300 – $46,200 | $43,500 – $54,400 |
| 2.5-car (24x30), 720 sq ft | $33,900 – $47,500 | $44,100 – $57,700 | $54,300 – $67,900 |
| 3-car (900 sq ft) | $42,300 – $59,300 | $55,000 – $72,000 | $67,800 – $84,800 |
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $35,300 to $46,200 for Provo, UT is attached.
Detailed detached garage report for Provo, UT, $9
The report lays out the detached garage numbers for Provo, UT line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Detached garage in Provo: your questions
+How much does it cost to build a detached garage in Provo?
For 576 sq ft, expect $27,100 to $54,400 in the Provo area. A standard-spec job lands at $35,300 to $46,200. Small jobs usually cost more per sq ft and large ones less.
+What is the price per sq ft for detached garage in Provo?
About $47 to $93.50 per sq ft for materials and labor, plus $150 to $490 for the permit if one is needed. The US range is $50 to $100.
+Is detached garage cheaper in Provo or Salt Lake City?
Salt Lake City is 60 miles away. The midpoint for 576 sq ft there is $42,600, which is 4% more than Provo ($40,800). Wage and materials indexes both feed that gap.
+How much of the bill is labor in Provo?
About 48% at the midpoint, or $19,600 out of $40,800. Materials are 51% and permits 1%. Nationally, labor is 50%.
+What would 2.5-car (24x30), 720 sq ft cost in Provo?
$33,900 to $67,900. Pick a different size in the estimator above to get your own number.
+Does detached garage need a permit in Provo?
Often, but rules are set by your city or county building office, so call before you hire. Budget $150 to $490 for fees in the Provo area (our national range of $150 to $500 scaled by the local price level).
+Is Provo expensive for detached garage compared with the rest of Utah?
Provo is 1% below the Utah statewide estimate ($41,000 at the midpoint). We cover 5 metros in Utah; see the state page to compare them.
+What do carpenters earn in Provo?
The BLS median is $25.59 an hour in the Provo area, compared with $29.12 nationally. The 25th to 75th percentile range is $21.92 to $29.39.
+What do basic and premium detached garage work cost in Provo?
For 576 sq ft, basic work runs $27,100 to $38,000 and premium work $43,500 to $54,400. Basic means: basic shell: slab, framing, siding, a roll-up door. Premium means: insulated and drywalled, heat and cooling, upgraded finishes.
+When is the best time to build a detached garage in Provo?
Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are May through June and September through October. June and September are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.
Detached garage near Provo
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does a Detached Garage Cost? (2026) (accessed November 4, 2026)
- Trusscore: How Much Does It Cost to Build a Garage? 2026 Price Guide (accessed November 4, 2026)
- Angi: How Much Does It Cost to Build a Detached Garage? [2026 Data] (accessed November 4, 2026)
- HomeGuide: 2026 Building Permit Costs | Fees & Cost Calculator (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = installed range / 1.6, because Angi puts professional labor at roughly an additional 60% of the materials cost (materials about 62.5% of the total).