Concrete slab cost in Chico, CA

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,650 – $5,600
Per sq ft
$6.55 – $13
before permit
Versus US midpoint
+8%
US $3,850
Rank of 300 metros
#40
1 = most expensive

If you want to pour a concrete slab in Chico, plan on $2,650 to $5,600 for 400 sq ft, all in. Per sq ft, that is $6.55 to $13 for materials and labor, with the permit on top. The local midpoint runs 8% higher than the national one. Cement masons and concrete finishers earn a median of $28.71 an hour in the Chico area, 5% above the US median of $27.41.

Estimate your concrete slab cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

4-5 inch slab with rebar or heavier mesh and standard base prep

Add-ons

Estimated cost for 400 sq ft in Chico, CA, standard level

$3,550 to $4,700

About $8.45 to $11 per sq ft before permits. Labor is about 44% of the bill.

Cost breakdown
PartLowHigh
Materials$1,750$2,450
Labor$1,600$2,000
Permits and fees$160$300
Total$3,550$4,700
Save and get a PDF report

Cost breakdown for 400 sq ft in Chico, CA

Part of the jobLowMidpointHighShare
Materials$1,250$2,100$2,95051%
Labor$1,350$1,800$2,25044%
Permits and fees$50$230$4006%
Total$2,650$4,150$5,600100%

Why Chico prices look the way they do

Labor is 44% of the midpoint bill here, against 42% nationally. The mix of trades behind this job is cement masons and concrete finishers (50%), construction laborers (30%), operating engineers and other construction equipment operators (10%), carpenters (10%). We weight each trade's local median wage by that share and compare it with the national median. In Chico the blended ratio comes out at 1.12.

On the materials line, the BEA goods price index for the Chico metro is 105.2 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,100, compared with $2,000 at national prices. Permit and inspection fees are scaled by the broader index (101.2) and land at $50 to $400.

Climate in Chico: timing your concrete slab job

We use NOAA's 1991-2020 climate normals for Chico Univ Farm (5 miles from the city center). These are 30-year monthly averages, not forecasts.

March through June and October are the stretches where pouring concrete runs into the fewest weather problems in Chico (5 of 12 months). January, February, November and December have an average overnight low of 40°F or below; July, August and September have an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July, August and September, crews often start early, wet the base and plan for faster set times.

Chico gets about 27 inches of precipitation in a normal year. The wettest months are January, February and December (5.1 inches in February). Inside the workable window, May and June are the driest, at 1.4 and 0.6 inches. The station averages about 99 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Chico Univ Farm (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan56365.1Cold
Feb62385.1Cold
Mar67423.6Workable
Apr73451.9Workable
May81521.4Workable
Jun89570.6Workable
Jul95610.0Hot
Aug94590.1Hot
Sep91550.3Hot
Oct80471.7Workable
Nov65402.4Cold
Dec57365.0Cold

Is Chico cheap or dear? The local comparison

Same job, same size (400 sq ft), priced for the nearest metros. Napa is the priciest of the group at $4,450.

Comparison with nearby areas
AreaRangeMidpointvs. here
Chico, CAthis page$2,650 – $5,600$4,150
Sacramento, CA70 miles$2,750 – $5,750$4,250+3%
Redding, CA80 miles$2,700 – $5,650$4,150+1%
Napa, CA90 miles$2,900 – $6,000$4,450+8%
Vallejo, CA100 miles$2,800 – $5,800$4,300+4%
Santa Rosa, CA105 miles$2,800 – $5,850$4,300+5%
California (statewide)$2,750 – $5,800$4,300+4%
United States$2,450 – $5,200$3,850−7%

Across 300 US metros, Chico comes in at #40 from the top. The priciest is Kahului, HI at $5,300; the cheapest is McAllen, TX at $3,200 (midpoints, 400 sq ft). Statewide, Chico is 4% below the California figure.

Other California metros

California metros compared with Chico
MetroSizeRangeMidpointvs. here
Los Angeles, CA6,271,560 jobs$2,800 – $5,850$4,350+5%
San Francisco, CA2,373,920 jobs$3,150 – $6,450$4,800+16%
Riverside, CA1,716,760 jobs$2,650 – $5,550$4,100−1%
San Diego, CA1,538,060 jobs$2,800 – $5,900$4,350+5%
San Jose, CA1,134,970 jobs$3,050 – $6,250$4,650+13%
Sacramento, CA1,080,590 jobs$2,750 – $5,750$4,250+3%

Cities with a workforce like Chico's

Big cities and small ones price differently, so here is Chico against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Merced, CA79,510 jobs$2,600 – $5,450$4,000−3%
Napa, CA77,860 jobs$2,900 – $6,000$4,450+8%
Saginaw, MI80,000 jobs$2,400 – $5,000$3,700−10%
Racine, WI76,280 jobs$2,550 – $5,300$3,950−5%

Cost by quality level and size in Chico

Three bands are cut from the same cited range and localized for Chico wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 5 common sizes.

Basic

$2,650 to $3,850

4-inch broom-finish slab, light mesh, easy truck access

Standard

$3,550 to $4,700

4-5 inch slab with rebar or heavier mesh and standard base prep

Premium

$4,400 to $5,600

6-inch slab, heavy reinforcement, thick base, pump truck or tight access

Cost by size and quality level
SizeBasicStandardPremium
10x10 pad (100 sq ft)$700 – $1,100$1,000 – $1,400$1,300 – $1,700
12x12 (144 sq ft)$990 – $1,500$1,400 – $1,900$1,750 – $2,250
20x20 (400 sq ft)$2,650 – $3,850$3,550 – $4,700$4,400 – $5,600
24x24 garage floor (576 sq ft)$3,800 – $5,450$5,050 – $6,650$6,250 – $7,900
30x40 foundation (1,200 sq ft)$7,900 – $11,100$10,300 – $13,500$12,700 – $16,000

Chico labor market for concrete slab

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Chico is 1.12 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $28.71 an hour, which is 5% above the national $27.41. The middle half of them earn between $24.32 and $37.49 an hour. BLS counts 150 of them working in the area, 19.2 for every 10,000 jobs (US: 13.3), so the local bench is deeper than average.

Construction laborers (47-2061), 30% of the weighting: a median of $26.31 an hour, 16% above the US median of $22.66. The middle half of them earn between $22.14 and $34.60 an hour. About 480 work in the metro. That is 61.4 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $38.00 an hour, which is 32% above the national $28.78. The middle half of them earn between $30.40 and $59.81 an hour. BLS counts 230 of them working in the area, 29.4 for every 10,000 jobs (US: 30.7), so the local bench is about average.

For carpenters (47-2031, weighted 10%) the local median is $34.75 an hour, which is 19% above the national $29.12. The middle half of them earn between $24.79 and $38.46 an hour. BLS counts 390 of them working in the area, 49.9 for every 10,000 jobs (US: 43.1), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($37.49 an hour) instead of the median, the labor line grows by about $260. At the 25th percentile ($24.32) it shrinks by about $130. The total moves by 6.2% or 3.1%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 78,220 jobs in the Chico area. That makes it the 241st largest of the 300 metros we cover, with 0.05% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$24.32$28.71$37.49$27.411.05metro
Construction laborers (47-2061)30%$22.14$26.31$34.60$22.661.16metro
Operating engineers and other construction equipment operators (47-2073)10%$30.40$38.00$59.81$28.781.32metro
Carpenters (47-2031)10%$24.79$34.75$38.46$29.121.19metro
Blended100%1.12

Specs and site conditions that change a Chico bid

  • Truck and pump access

    If the mixer truck can't back up to the forms, someone has to wheelbarrow it in or hire a pump. Pump or line-pump hire is typically billed per day.

  • Small-job minimums

    Many crews have a minimum charge, so a 10x10 pad can cost more per square foot than a 20x20 slab.

  • Finish

    A broom finish is the baseline. Stamped, stained, or exposed-aggregate finishes are priced as add-ons on top of the slab.

What nearby projects cost in Chico

Because every project leans on different trades, Chico's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs +18% and stamped concrete +8%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete driveway600 sq ft$4,000 – $10,100+10%
Concrete patio300 sq ft$1,350 – $4,350+9%
Detached garage576 sq ft$31,700 – $63,600+10%
Stamped concrete400 sq ft$3,500 – $8,600+8%
Asphalt driveway600 sq ft$3,550 – $8,800+18%
Gravel driveway1,000 sq ft$2,850 – $11,700+14%

Extras that change the Chico total

Extras are quoted nationally and then scaled to Chico by the average of the local wage index (1.12) and goods index (1.05), a factor of 1.09. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add rebar reinforcement$440 – $1,300
Remove old concrete first$870 – $2,600

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $3,550 to $4,700 for Chico, CA is attached.

Take this estimate with you: PDF report, $9

The report lays out the concrete slab numbers for Chico, CA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete slab in Chico: your questions

+How much does it cost to pour a concrete slab in Chico?

For 400 sq ft, expect $2,650 to $5,600 in the Chico area. A standard-spec job lands at $3,550 to $4,700. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete slab in Chico?

About $6.55 to $13 per sq ft for materials and labor, plus $50 to $400 for the permit if one is needed. The US range is $6 to $12.

+Is concrete slab cheaper in Chico or Sacramento?

Sacramento is 70 miles away. The midpoint for 400 sq ft there is $4,250, which is 3% more than Chico ($4,150). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Chico?

About 44% at the midpoint, or $1,800 out of $4,150. Materials are 51% and permits 6%. Nationally, labor is 42%.

+What would 20x20 (400 sq ft) cost in Chico?

$2,650 to $5,600. Pick a different size in the estimator above to get your own number.

+Does concrete slab need a permit in Chico?

Often, but rules are set by your city or county building office, so call before you hire. Budget $50 to $400 for fees in the Chico area (our national range of $50 to $400 scaled by the local price level).

+Is Chico expensive for concrete slab compared with the rest of California?

Chico is 4% below the California statewide estimate ($4,300 at the midpoint). We cover 23 metros in California; see the state page to compare them.

+What do cement masons and concrete finishers earn in Chico?

The BLS median is $28.71 an hour in the Chico area, compared with $27.41 nationally. The 25th to 75th percentile range is $24.32 to $37.49.

+What do basic and premium concrete slab work cost in Chico?

For 400 sq ft, basic work runs $2,650 to $3,850 and premium work $4,400 to $5,600. Basic means: 4-inch broom-finish slab, light mesh, easy truck access. Premium means: 6-inch slab, heavy reinforcement, thick base, pump truck or tight access.

+When is the best time to pour a concrete slab in Chico?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through June and October. May and June are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add rebar reinforcement" add in Chico?

$440 to $1,300 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete slab near Chico

Concrete slab: all pricesConcrete slab in CaliforniaAll projects in ChicoCalifornia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.