Home project costs in Bremerton, WA
Every project we cover, priced for the Bremerton-Silverdale-Port Orchard metro with local BLS wages and BEA price levels.
Bremerton sits 26th of 300 metros on BEA's regional price index, at 105.6 where the US is 100. Goods, the index that drives materials, is 105.0 (39th). The metro has about 93,740 jobs in BLS's May 2025 survey.
Not every job moves the same way here: 38 of the 38 projects price above the national midpoint and 0 below. Shower pan (+27%), kitchen backsplash (+25%) and tile flooring (+24%) sit highest, and laminate flooring (+4%), hardwood flooring (+5%) and front door (+6%) sit lowest. Labor-heavy work tracks local wages; materials-heavy work tracks the goods index.
Weather: the nearest NOAA station (Bremerton, 3 miles away) shows a January average low of 36°F, a July average high of 77°F and 57 inches of precipitation a year (1991-2020 normals). For concrete pours, the workable months are April through October; for exterior installation, every month is workable.
What local trades earn in Bremerton
| Trade | Projects using it | 25th pct | Median | 75th pct | US median | Ratio |
|---|---|---|---|---|---|---|
| Construction laborers (47-2061) | 25 | $22.39 | $26.30 | $31.03 | $22.66 | 1.16 |
| Carpenters (47-2031) | 23 | $28.92 | $31.25 | $42.18 | $29.12 | 1.07 |
| Operating engineers and other construction equipment operators (47-2073) | 10 | $30.98 | $37.39 | $44.91 | $28.78 | 1.30 |
| Plumbers, pipefitters and steamfitters (47-2152) | 7 | $30.11 | $39.89 | $45.94 | $30.67 | 1.30 |
| Cement masons and concrete finishers (47-2051) | 6 | n/a | n/a | n/a | $27.41 | n/a |
| Electricians (47-2111) | 6 | $30.11 | $38.94 | $45.94 | $30.38 | 1.28 |
| Tile and stone setters (47-2044) | 5 | $34.48 | $42.66 | $45.94 | $26.77 | 1.59 |
| Roofers (47-2181) | 5 | $23.88 | $28.59 | $38.19 | $26.65 | 1.07 |
Concrete & paving in Bremerton
The 7 jobs here average +17% versus the US in Bremerton, from +14% (gravel driveway) to +20% (asphalt driveway).
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| Concrete slab cost in Bremerton | 400 sq ft | $2,850 – $5,900 | +14% |
| Concrete driveway cost in Bremerton | 600 sq ft | $4,300 – $11,100 | +20% |
| Asphalt driveway cost in Bremerton | 600 sq ft | $3,600 – $8,950 | +20% |
| Gravel driveway cost in Bremerton | 1,000 sq ft | $2,850 – $11,600 | +14% |
| Paver patio cost in Bremerton | 300 sq ft | $3,450 – $6,300 | +16% |
| Concrete patio cost in Bremerton | 300 sq ft | $1,400 – $4,700 | +16% |
| Stamped concrete cost in Bremerton | 400 sq ft | $3,750 – $9,350 | +17% |
Decks & outdoor in Bremerton
The 2 jobs here average +7% versus the US in Bremerton, from +7% (wood deck) to +7% (composite deck).
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| Wood deck cost in Bremerton | 300 sq ft | $8,050 – $16,200 | +7% |
| Composite deck cost in Bremerton | 300 sq ft | $12,900 – $25,900 | +7% |
Building & additions in Bremerton
Across these 2 projects, Bremerton averages +11% against national midpoints. Home addition is highest at +11% and detached garage lowest at +10%.
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| Detached garage cost in Bremerton | 576 sq ft | $31,900 – $64,000 | +10% |
| Home addition cost in Bremerton | 300 sq ft | $42,400 – $85,800 | +11% |
Doors & windows in Bremerton
The 5 jobs here average +7% versus the US in Bremerton, from +6% (front door) to +8% (patio door).
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| Garage door cost in Bremerton | 1 door | $760 – $4,000 | +8% |
| Storm door cost in Bremerton | 1 door | $380 – $1,000 | +7% |
| Front door cost in Bremerton | 1 door | $540 – $2,650 | +6% |
| Window replacement cost in Bremerton | 10 windows | $4,850 – $16,100 | +7% |
| Patio door cost in Bremerton | 1 door | $640 – $6,500 | +8% |
Fencing in Bremerton
The 4 jobs here average +8% versus the US in Bremerton, from +6% (vinyl fence) to +10% (chain-link fence).
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| Wood fence cost in Bremerton | 150 linear ft | $3,300 – $8,200 | +7% |
| Vinyl fence cost in Bremerton | 150 linear ft | $4,800 – $9,750 | +6% |
| Chain-link fence cost in Bremerton | 150 linear ft | $1,650 – $6,750 | +10% |
| Aluminum fence cost in Bremerton | 150 linear ft | $4,200 – $12,500 | +10% |
Roofing & exterior in Bremerton
The 5 jobs here average +11% versus the US in Bremerton, from +7% (roof replacement) to +15% (attic insulation).
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| Roof replacement cost in Bremerton | 2,000 sq ft of roof | $6,550 – $13,400 | +7% |
| Metal roof cost in Bremerton | 2,000 sq ft of roof | $11,500 – $35,800 | +11% |
| Gutters cost in Bremerton | 160 linear ft | $1,450 – $4,700 | +12% |
| Vinyl siding cost in Bremerton | 2,100 sq ft of wall | $9,200 – $27,500 | +9% |
| Attic insulation cost in Bremerton | 1,000 sq ft | $1,200 – $4,550 | +15% |
Kitchen & bath in Bremerton
Across these 5 projects, Bremerton averages +18% against national midpoints. Shower pan is highest at +27% and kitchen remodel lowest at +8%.
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| Kitchen cabinets cost in Bremerton | 25 linear ft | $4,550 – $15,200 | +8% |
| Shower pan cost in Bremerton | 1 pan | $1,250 – $3,500 | +27% |
| Kitchen remodel cost in Bremerton | 120 sq ft | $20,000 – $34,000 | +8% |
| Bathroom remodel cost in Bremerton | 45 sq ft | $5,550 – $27,600 | +19% |
| Kitchen backsplash cost in Bremerton | 30 sq ft | $390 – $1,850 | +25% |
Landscaping & drainage in Bremerton
Across these 5 projects, Bremerton averages +15% against national midpoints. French drain is highest at +18% and sod installation lowest at +13%.
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| French drain cost in Bremerton | 60 linear ft | $710 – $2,500 | +18% |
| Retaining wall cost in Bremerton | 200 sq ft of wall face | $8,350 – $15,300 | +15% |
| Sod installation cost in Bremerton | 1,500 sq ft | $1,700 – $3,700 | +13% |
| Sprinkler system cost in Bremerton | 4,000 sq ft of lawn | $4,600 – $11,500 | +15% |
| Inground pool cost in Bremerton | 450 sq ft | $41,700 – $130,500 | +16% |
Flooring & interior in Bremerton
The 3 jobs here average +11% versus the US in Bremerton, from +4% (laminate flooring) to +24% (tile flooring).
| Project | Size | Bremerton range | vs. US |
|---|---|---|---|
| Hardwood flooring cost in Bremerton | 500 sq ft | $5,800 – $13,100 | +5% |
| Laminate flooring cost in Bremerton | 500 sq ft | $2,050 – $7,300 | +4% |
| Tile flooring cost in Bremerton | 200 sq ft | $3,500 – $11,900 | +24% |
Bremerton against its nearest metros
Taking every project together, Bremerton comes out +13% versus the national midpoint. Of the 6 closest metros, 4 price higher and 1 lower. Yakima is the lowest at +9% (120 miles) and Seattle the highest at +18% (40 miles). These are unweighted averages of the midpoints, a rough guide to overall price level rather than a number for any one job.
| Metro | Distance | Price index | Goods index | All projects vs. US |
|---|---|---|---|---|
| Bremerton, WAthis page | 105.6 | 105.0 | +13% | |
| Seattle, WA | 40 miles | 111.1 | 104.0 | +18% |
| Olympia, WA | 50 miles | 103.7 | 105.0 | +13% |
| Bellingham, WA | 90 miles | 103.3 | 105.0 | +16% |
| Yakima, WA | 120 miles | 95.5 | 105.0 | +9% |
| Portland, OR | 140 miles | 105.4 | 105.2 | +13% |
| Kennewick, WA | 185 miles | 100.1 | 105.0 | +12% |