Stamped concrete cost in Greenville, SC

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$3,050 – $7,400
Per sq ft
$7.45 – $17.50
before permit
Versus US midpoint
−7%
US $5,600
Rank of 300 metros
#190
1 = most expensive

Local price for stamped concrete in the Greenville area: $3,050 to $7,400 for 400 sq ft. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 7% lower than the US figure. Cement masons and concrete finishers earn a median of $24.29 an hour in the Greenville area, 11% below the US median of $27.41.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in Greenville, SC, standard level

$4,350 to $6,100

About $10.50 to $14.50 per sq ft before permits. Labor is about 46% of the bill.

Cost breakdown
PartLowHigh
Materials$2,250$2,950
Labor$1,950$2,900
Permits and fees$130$240
Total$4,350$6,100
Save and get a PDF report

Cost breakdown for 400 sq ft in Greenville, SC

Part of the jobLowMidpointHighShare
Materials$1,750$2,600$3,45050%
Labor$1,250$2,400$3,60046%
Permits and fees$45$190$3304%
Total$3,050$5,200$7,400100%

What is behind the Greenville number

The wage side of the estimate leans on cement masons and concrete finishers, who do 60% of the hours on a typical job. Their local median is $24.29 an hour. Add the other trades involved and the blended wage index for Greenville is 0.90 (US = 1.00), which puts labor at 46% of the total.

Materials are scaled with BEA's regional price parity for goods. Greenville is at 96.3 against 100 for the US, so a materials line of $2,700 nationally becomes $2,600 here (midpoint, 400 sq ft). Permits follow the all-items index of 93.3: $45 to $330.

Extras that change the Greenville total

Add-ons start from national price ranges and are scaled by 0.93 for Greenville, which is the average of the area's wage index (0.90) and goods price index (0.96). The estimator above can add them to your total.

Add-on prices
Add-onLocal range
Add a vapor barrier$190 – $370

Who does the work: Greenville trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Greenville the blend is 0.90.

Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $24.29 an hour, 11% below the US median of $27.41. The middle half of them earn between $21.12 and $29.85 an hour. About 470 work in the metro. That is 10.8 per 10,000 jobs, compared with 13.3 nationally, so expect fewer local crews to bid.

For construction laborers (47-2061, weighted 30%) the local median is $21.34 an hour, which is 6% below the national $22.66. The middle half of them earn between $17.77 and $23.59 an hour. BLS counts 3,250 of them working in the area, 74.7 for every 10,000 jobs (US: 70.5), so the local bench is about average.

Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $23.55 an hour, 18% below the US median of $28.78. The middle half of them earn between $22.10 and $27.31 an hour. About 1,130 work in the metro. That is 26.0 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (cement masons and concrete finishers) from the median to the 75th percentile wage adds about $330 to the midpoint estimate; the 25th percentile takes off about $190. That is a swing of roughly 3.6% to 6.3% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Greenville-Anderson-Greer has 434,900 jobs in total (BLS, May 2025), ranking 58th by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$21.12$24.29$29.85$27.410.89metro
Construction laborers (47-2061)30%$17.77$21.34$23.59$22.660.94metro
Operating engineers and other construction equipment operators (47-2073)10%$22.10$23.55$27.31$28.780.82metro
Blended100%0.90

Is Greenville cheap or dear? The local comparison

Same job, same size (400 sq ft), priced for the nearest metros. Greenville is the priciest of the group. Athens is the cheapest at $4,950.

Comparison with nearby areas
AreaRangeMidpointvs. here
Greenville, SCthis page$3,050 – $7,400$5,200
Spartanburg, SC35 miles$3,000 – $7,200$5,100−2%
Asheville, NC65 miles$3,000 – $7,250$5,100−2%
Athens, GA70 miles$2,900 – $7,000$4,950−5%
Gainesville, GA85 miles$2,900 – $7,050$4,950−5%
Augusta, GA90 miles$2,900 – $7,050$5,000−4%
South Carolina (statewide)$3,000 – $7,300$5,150−1%
United States$3,250 – $7,950$5,600+8%

Out of the 300 metros we cover, Greenville ranks #190 for the cost of this job (#1 is the most expensive). Statewide, Greenville is 1% above the South Carolina figure.

Elsewhere in South Carolina

South Carolina metros compared with Greenville
MetroSizeRangeMidpointvs. here
Columbia, SC394,200 jobs$3,000 – $7,350$5,200−1%
Charleston, SC394,170 jobs$3,050 – $7,500$5,250+1%
Spartanburg, SC165,150 jobs$3,000 – $7,200$5,100−2%
Myrtle Beach, SC146,260 jobs$2,900 – $7,000$4,950−5%
Florence, SC89,060 jobs$3,000 – $7,200$5,100−2%
Hilton Head, SC81,920 jobs$3,050 – $7,400$5,200level

Metros of a similar size

Big cities and small ones price differently, so here is Greenville against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
New Orleans, LA445,550 jobs$2,950 – $7,100$5,000−4%
Knoxville, TN424,600 jobs$3,000 – $7,200$5,100−2%
Honolulu, HI446,380 jobs$4,450 – $11,200$7,850+51%
Baton Rouge, LA409,690 jobs$3,100 – $7,650$5,400+3%

The best months for stamped concrete in Greenville

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Greenville Dwtn Ap (in the city). They are 30-year averages, so any one year can run hotter, colder or wetter.

For pouring concrete, the comfortable months in Greenville are March through June and August through November: 8 of 12. Outside them, January, February and December have an average overnight low of 40°F or below, and July has an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July, crews often start early, wet the base and plan for faster set times.

Greenville gets about 47 inches of precipitation in a normal year. The wettest months are March, July and December (5.2 inches in July). Inside the workable window, September and October are the driest, at 3.5 and 3.2 inches. The station averages about 52 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Greenville Dwtn Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan54354.0Cold
Feb58383.7Cold
Mar65444.3Workable
Apr75523.6Workable
May81613.9Workable
Jun88683.9Workable
Jul91725.2Hot
Aug89714.0Workable
Sep84653.5Workable
Oct74543.2Workable
Nov64443.6Workable
Dec56374.3Cold

Pick a size, pick a tier: stamped concrete pricing in Greenville

The cited range is split into basic, standard and premium bands, then scaled to Greenville. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).

Basic

$3,050 to $4,750

Basic pattern, one integral color

Standard

$4,350 to $6,100

Two-tone color release and a border

Premium

$5,650 to $7,400

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,550 – $2,450$2,250 – $3,150$2,950 – $3,850
20x20 patio (400 sq ft)$3,050 – $4,750$4,350 – $6,100$5,650 – $7,400
2-car driveway (600 sq ft)$4,550 – $7,100$6,450 – $9,000$8,350 – $10,900

Specs and site conditions that change a Greenville bid

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

  • Sealing and vapor barrier

    Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

What nearby projects cost in Greenville

Jobs that often go together with stamped concrete are priced below at their usual sizes, using the same Greenville wage and price inputs. Compared with national midpoints, concrete slab comes out highest (−7%) and concrete driveway lowest (−9%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,150 – $3,700−8%
Concrete driveway600 sq ft$3,350 – $8,350−9%
Paver patio300 sq ft$2,750 – $5,000−8%
Concrete slab400 sq ft$2,250 – $4,850−7%
Asphalt driveway600 sq ft$2,850 – $6,850−7%
Gravel driveway1,000 sq ft$2,300 – $9,400−8%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,350 to $6,100 for Greenville, SC is attached.

Detailed stamped concrete report for Greenville, SC, $9

The report lays out the stamped concrete numbers for Greenville, SC line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in Greenville: your questions

+How much does it cost to pour stamped concrete in Greenville?

For 400 sq ft, expect $3,050 to $7,400 in the Greenville area. A standard-spec job lands at $4,350 to $6,100. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for stamped concrete in Greenville?

About $7.45 to $17.50 per sq ft for materials and labor, plus $45 to $330 for the permit if one is needed. The US range is $8 to $19.

+Is stamped concrete cheaper in Greenville or Spartanburg?

Spartanburg is 35 miles away. The midpoint for 400 sq ft there is $5,100, which is 2% less than Greenville ($5,200). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Greenville?

About 46% at the midpoint, or $2,400 out of $5,200. Materials are 50% and permits 4%. Nationally, labor is 48%.

+What would 20x20 patio (400 sq ft) cost in Greenville?

$3,050 to $7,400. Pick a different size in the estimator above to get your own number.

+Does stamped concrete need a permit in Greenville?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $330 for fees in the Greenville area (our national range of $50 to $350 scaled by the local price level).

+Is Greenville expensive for stamped concrete compared with the rest of South Carolina?

Greenville is 1% above the South Carolina statewide estimate ($5,150 at the midpoint). We cover 7 metros in South Carolina; see the state page to compare them.

+What do cement masons and concrete finishers earn in Greenville?

The BLS median is $24.29 an hour in the Greenville area, compared with $27.41 nationally. The 25th to 75th percentile range is $21.12 to $29.85.

+What do basic and premium stamped concrete work cost in Greenville?

For 400 sq ft, basic work runs $3,050 to $4,750 and premium work $5,650 to $7,400. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+When is the best time to pour stamped concrete in Greenville?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through June and August through November. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a vapor barrier" add in Greenville?

$190 to $370 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Stamped concrete near Greenville

Stamped concrete: all pricesStamped concrete in South CarolinaAll projects in GreenvilleSouth Carolina cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.