Skip to content
CostLocal

Concrete patio cost in Greenville, SC

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (300 sq ft)
$1,150 – $3,700
Per sq ft
$3.75 – $11
before permit
Versus US midpoint
−8%
US $2,650
Rank of 300 metros
#191
1 = most expensive

Greenville homeowners pay roughly $1,150 to $3,700 to pour a concrete patio at 300 sq ft, or $3.75 to $11 per sq ft (permit not included). Against the US midpoint, Greenville is 8% lower. Cement masons and concrete finishers earn a median of $24.29 an hour in the Greenville area, 11% below the US median of $27.41.

Estimate your concrete patio cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Colored or stained, saw-cut joints, minor grading

Add-ons

Estimated cost for 300 sq ft in Greenville, SC, standard level

$1,900 to $2,900

About $5.90 to $8.85 per sq ft before permits. Labor is about 50% of the bill.

Cost breakdown
PartLowHigh
Materials$900$1,150
Labor$880$1,500
Permits and fees$140$280
Total$1,900$2,900
Save and get a PDF report

Cost breakdown for 300 sq ft in Greenville, SC

Part of the jobLowMidpointHighShare
Materials$720$1,000$1,30042%
Labor$400$1,200$2,00050%
Permits and fees$45$210$3709%
Total$1,150$2,400$3,700100%

Where the Greenville price comes from

The wage side of the estimate leans on cement masons and concrete finishers, who do 50% of the hours on a typical job. Their local median is $24.29 an hour. Add the other trades involved and the blended wage index for Greenville is 0.89 (US = 1.00), which puts labor at 50% of the total.

On the materials line, the BEA goods price index for the Greenville metro is 96.3 (US = 100). The midpoint materials bill for 300 sq ft comes to $1,000, compared with $1,050 at national prices. Permit and inspection fees are scaled by the broader index (93.3) and land at $45 to $370.

Pick a size, pick a tier: concrete patio pricing in Greenville

Three bands are cut from the same cited range and localized for Greenville wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.

Basic

$1,150 to $2,150

Plain gray slab, broom finish, flat yard

Standard

$1,900 to $2,900

Colored or stained, saw-cut joints, minor grading

Premium

$2,650 to $3,700

Exposed aggregate or heavy decorative finish, drainage work

Cost by size and quality level
SizeBasicStandardPremium
10x10 (100 sq ft)$420 – $840$740 – $1,150$1,050 – $1,450
12x16 (192 sq ft)$770 – $1,450$1,300 – $1,950$1,800 – $2,500
20x20 (400 sq ft)$1,550 – $2,850$2,500 – $3,800$3,500 – $4,800

Specs and site conditions that change a Greenville bid

  • Finish

    Plain concrete is $4-$12 per sq ft and a broom finish $6-$13; designs with several colors and decorative finishes run up to about $28 (HomeGuide).

  • Site prep

    Excavation, forms and a gravel base are the unglamorous part of the bill and vary most with soil and slope.

  • Size

    Small patios carry fixed costs for forms and mobilization, so the per-square-foot price drops as the patio gets bigger.

What nearby projects cost in Greenville

Because every project leans on different trades, Greenville's wage level does not move all prices equally. Against the US midpoint, concrete slab runs −7% and concrete driveway −9%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete slab400 sq ft$2,250 – $4,850−7%
Stamped concrete400 sq ft$3,050 – $7,400−7%
Paver patio300 sq ft$2,750 – $5,000−8%
Wood deck300 sq ft$6,900 – $13,800−9%
Concrete driveway600 sq ft$3,350 – $8,350−9%
Asphalt driveway600 sq ft$2,850 – $6,850−7%

Extras that change the Greenville total

Extras are quoted nationally and then scaled to Greenville by the average of the local wage index (0.89) and goods index (0.96), a factor of 0.93. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add an acid or water-based stain$830 – $2,800

Greenville against nearby metros and the rest of South Carolina

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 300 sq ft range from $2,300 to $2,400 across Greenville and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Greenville, SCthis page$1,150 – $3,700$2,400
Spartanburg, SC35 miles$1,150 – $3,600$2,350−2%
Asheville, NC65 miles$1,150 – $3,650$2,400−1%
Athens, GA70 miles$1,100 – $3,450$2,300−6%
Gainesville, GA85 miles$1,150 – $3,500$2,300−5%
Augusta, GA90 miles$1,150 – $3,550$2,350−3%
South Carolina (statewide)$1,150 – $3,650$2,400−1%
United States$1,250 – $4,000$2,650+8%

Across 300 US metros, Greenville comes in at #191 from the top. The priciest is Kahului, HI at $3,800; the cheapest is McAllen, TX at $2,100 (midpoints, 300 sq ft). Statewide, Greenville is 1% above the South Carolina figure.

Other South Carolina metros

South Carolina metros compared with Greenville
MetroSizeRangeMidpointvs. here
Columbia, SC394,200 jobs$1,150 – $3,650$2,400−1%
Charleston, SC394,170 jobs$1,200 – $3,750$2,450+2%
Spartanburg, SC165,150 jobs$1,150 – $3,600$2,350−2%
Myrtle Beach, SC146,260 jobs$1,150 – $3,500$2,300−5%
Florence, SC89,060 jobs$1,150 – $3,600$2,350−2%
Hilton Head, SC81,920 jobs$1,150 – $3,700$2,450level

Cities with a workforce like Greenville's

Big cities and small ones price differently, so here is Greenville against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
New Orleans, LA445,550 jobs$1,150 – $3,550$2,350−3%
Knoxville, TN424,600 jobs$1,150 – $3,600$2,400−2%
Honolulu, HI446,380 jobs$1,650 – $5,750$3,700+53%
Baton Rouge, LA409,690 jobs$1,200 – $3,800$2,500+3%

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 4 trades carry the job here, and each is compared with its US median. The weighted result for Greenville is 0.89 times the national level.

For cement masons and concrete finishers (47-2051, weighted 50%) the local median is $24.29 an hour, which is 11% below the national $27.41. The middle half of them earn between $21.12 and $29.85 an hour. BLS counts 470 of them working in the area, 10.8 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $21.34 an hour, 6% below the US median of $22.66. The middle half of them earn between $17.77 and $23.59 an hour. About 3,250 work in the metro. That is 74.7 per 10,000 jobs, compared with 70.5 nationally, so the supply of crews looks typical.

For carpenters (47-2031, weighted 10%) the local median is $24.08 an hour, which is 17% below the national $29.12. The middle half of them earn between $21.49 and $29.52 an hour. BLS counts 1,340 of them working in the area, 30.8 for every 10,000 jobs (US: 43.1), so the local bench is thinner than average.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $23.55 an hour, which is 18% below the national $28.78. The middle half of them earn between $22.10 and $27.31 an hour. BLS counts 1,130 of them working in the area, 26.0 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($29.85 an hour) instead of the median, the labor line grows by about $140. At the 25th percentile ($21.12) it shrinks by about $80. The total moves by 5.7% or 3.2%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 434,900 jobs in the Greenville-Anderson-Greer area. That makes it the 58th largest of the 300 metros we cover, with 0.28% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)50%$21.12$24.29$29.85$27.410.89metro
Construction laborers (47-2061)30%$17.77$21.34$23.59$22.660.94metro
Carpenters (47-2031)10%$21.49$24.08$29.52$29.120.83metro
Operating engineers and other construction equipment operators (47-2073)10%$22.10$23.55$27.31$28.780.82metro
Blended100%0.89

When to schedule concrete patio in Greenville

We use NOAA's 1991-2020 climate normals for Greenville Dwtn Ap (in the city). These are 30-year monthly averages, not forecasts.

March through June and August through November are the stretches where pouring concrete runs into the fewest weather problems in Greenville (8 of 12 months). January, February and December have an average overnight low of 40°F or below; July has an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July, crews often start early, wet the base and plan for faster set times.

Greenville gets about 47 inches of precipitation in a normal year. The wettest months are March, July and December (5.2 inches in July). Inside the workable window, September and October are the driest, at 3.5 and 3.2 inches. The station averages about 52 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Greenville Dwtn Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan54354.0Cold
Feb58383.7Cold
Mar65444.3Workable
Apr75523.6Workable
May81613.9Workable
Jun88683.9Workable
Jul91725.2Hot
Aug89714.0Workable
Sep84653.5Workable
Oct74543.2Workable
Nov64443.6Workable
Dec56374.3Cold

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $1,900 to $2,900 for Greenville, SC is attached.

Detailed concrete patio report for Greenville, SC, $9

Multi-page report for Greenville, SC: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Concrete patio in Greenville: your questions

+How much does it cost to pour a concrete patio in Greenville?

For 300 sq ft, expect $1,150 to $3,700 in the Greenville area. A standard-spec job lands at $1,900 to $2,900. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for concrete patio in Greenville?

About $3.75 to $11 per sq ft for materials and labor, plus $45 to $370 for the permit if one is needed. The US range is $4 to $12.

+Is concrete patio cheaper in Greenville or Spartanburg?

Spartanburg is 35 miles away. The midpoint for 300 sq ft there is $2,350, which is 2% less than Greenville ($2,400). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Greenville?

About 50% at the midpoint, or $1,200 out of $2,400. Materials are 42% and permits 9%. Nationally, labor is 51%.

+What would 12x16 (192 sq ft) cost in Greenville?

$770 to $2,500. Pick a different size in the estimator above to get your own number.

+Does concrete patio need a permit in Greenville?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $370 for fees in the Greenville area (our national range of $50 to $400 scaled by the local price level).

+Is Greenville expensive for concrete patio compared with the rest of South Carolina?

Greenville is 1% above the South Carolina statewide estimate ($2,400 at the midpoint). We cover 7 metros in South Carolina; see the state page to compare them.

+What do cement masons and concrete finishers earn in Greenville?

The BLS median is $24.29 an hour in the Greenville area, compared with $27.41 nationally. The 25th to 75th percentile range is $21.12 to $29.85.

+What do basic and premium concrete patio work cost in Greenville?

For 300 sq ft, basic work runs $1,150 to $2,150 and premium work $2,650 to $3,700. Basic means: plain gray slab, broom finish, flat yard. Premium means: exposed aggregate or heavy decorative finish, drainage work.

+When is the best time to pour a concrete patio in Greenville?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through June and August through November. September and October are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add an acid or water-based stain" add in Greenville?

$830 to $2,800 for 300 sq ft, from a national range scaled by the local wage and goods indexes.

Concrete patio near Greenville

Concrete patio: all pricesConcrete patio in South CarolinaAll projects in GreenvilleSouth Carolina cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's sample 200 sq ft broom-finish patio line ($500-$900 in materials) divided by 200 sq ft.