Stamped concrete cost in Oklahoma
Statewide estimate from BLS wages and BEA prices. Reviewed Nov 4, 2026.
- Statewide range (400 sq ft)
- $2,850 – $6,950
- Per sq ft
- $7.05 – $16.50
- before permit
- Versus US midpoint
- −12%
- US $5,600
- Metros covered
- 2
Across Oklahoma, stamped concrete costs about $2,850 to $6,950 for 400 sq ft. Statewide, that midpoint is 12% below the US figure of $5,600. Cement masons and concrete finishers earn a median $22.00 an hour in Oklahoma (US: $27.41).
Inside Oklahoma, the metros we cover range from $4,950 (Oklahoma City) to $5,000 (Tulsa) at the midpoint.
Estimate your stamped concrete cost
Pick a size, a quality level and where you live. Prices update as you type.
Estimated cost for 400 sq ft in Oklahoma (statewide), standard level
$4,100 to $5,700
About $9.90 to $13.50 per sq ft before permits. Labor is about 45% of the bill.
| Part | Low | High |
|---|---|---|
| Materials | $2,200 | $2,850 |
| Labor | $1,750 | $2,600 |
| Permits and fees | $120 | $230 |
| Total | $4,100 | $5,700 |
Cost breakdown for 400 sq ft in Oklahoma
| Part of the job | Low | Midpoint | High | Share |
|---|---|---|---|---|
| Materials | $1,700 | $2,550 | $3,400 | 52% |
| Labor | $1,150 | $2,200 | $3,250 | 45% |
| Permits and fees | $45 | $180 | $310 | 4% |
| Total | $2,850 | $4,900 | $6,950 | 100% |
Oklahoma labor market for stamped concrete
Oklahoma's labor line is priced from 3 trades, each compared with its US median wage. After weighting by each trade's share of the work, the state comes out at 0.81 times the national level.
Cement masons and concrete finishers (47-2051), 60% of the weighting: a median of $22.00 an hour, 20% below the US median of $27.41. The middle half of them earn between $18.98 and $23.58 an hour. About 2,980 work in the state. That is 17.5 per 10,000 jobs, compared with 13.3 nationally, which suggests plenty of local crews to bid.
For construction laborers (47-2061, weighted 30%) the local median is $18.92 an hour, which is 17% below the national $22.66. The middle half of them earn between $17.54 and $22.82 an hour. BLS counts 13,710 of them working in the state, 80.3 for every 10,000 jobs (US: 70.5), so the local bench is about average.
Operating engineers and other construction equipment operators (47-2073), 10% of the weighting: a median of $23.06 an hour, 20% below the US median of $28.78. The middle half of them earn between $20.15 and $27.26 an hour. About 7,050 work in the state. That is 41.3 per 10,000 jobs, compared with 30.7 nationally, which suggests plenty of local crews to bid.
A crew paid at the 75th percentile for cement masons and concrete finishers ($23.58 an hour) would add about $95 to the statewide midpoint; one at the 25th percentile ($18.98) would take off about $180. Use that as a rough guide to how far a bid can sit from our midpoint on wages alone.
BLS counts 1,707,680 jobs across Oklahoma (May 2025), which is 1.1% of US employment.
| Trade | Weight | 25th pct | Median | 75th pct | US median | Ratio | Level used |
|---|---|---|---|---|---|---|---|
| Cement masons and concrete finishers (47-2051) | 60% | $18.98 | $22.00 | $23.58 | $27.41 | 0.80 | state |
| Construction laborers (47-2061) | 30% | $17.54 | $18.92 | $22.82 | $22.66 | 0.83 | state |
| Operating engineers and other construction equipment operators (47-2073) | 10% | $20.15 | $23.06 | $27.26 | $28.78 | 0.80 | state |
| Blended | 100% | 0.81 | |||||
Oklahoma seasons and stamped concrete
Weather decides when pouring concrete can happen, and Oklahoma is not uniform. The table uses NOAA's 1991-2020 climate normals from the weather station nearest each metro we cover, and counts the months that are neither cold nor hot enough to complicate the job.
Tulsa has the longest comfortable season of the metros we cover in Oklahoma at 6 months (March through June and September through October); Oklahoma City has the shortest at 5 (April through June and September through October). Rainfall runs from 36 inches a year in Oklahoma City to 41 inches in Tulsa.
We do not adjust prices by month, because we have no reliable published data on seasonal pricing. Timing is still worth raising when you collect bids.
| Metro | Jan avg low °F | Jul avg high °F | Precip (in/yr) | Comfortable months |
|---|---|---|---|---|
| Oklahoma City | 27 | 93 | 36 | 5: April through June and September through October |
| Tulsa | 28 | 94 | 41 | 6: March through June and September through October |
Basic, standard or premium: Oklahoma prices
Bands overlap on purpose, since a good standard job can cost as much as a light premium one. Below are the three bands for the default size, then a grid from 10x20 patio (200 sq ft) to 2-car driveway (600 sq ft).
Basic
$2,850 to $4,500
Basic pattern, one integral color
Standard
$4,100 to $5,700
Two-tone color release and a border
Premium
$5,300 to $6,950
Multi-color, hand-detailed, sealed to a high finish
| Size | Basic | Standard | Premium |
|---|---|---|---|
| 10x20 patio (200 sq ft) | $1,450 – $2,300 | $2,100 – $2,950 | $2,750 – $3,600 |
| 20x20 patio (400 sq ft) | $2,850 – $4,500 | $4,100 – $5,700 | $5,300 – $6,950 |
| 2-car driveway (600 sq ft) | $4,300 – $6,650 | $6,050 – $8,450 | $7,850 – $10,200 |
Related projects, priced for Oklahoma
Each project weights the trades differently, so Oklahoma's wage level does not push every price by the same amount. Compared with the US midpoint, asphalt driveway is −10% and concrete driveway −15%.
| Project | Size | Range | vs. US |
|---|---|---|---|
| Concrete patio | 300 sq ft | $1,100 – $3,450 | −13% |
| Concrete driveway | 600 sq ft | $3,150 – $7,750 | −15% |
| Paver patio | 300 sq ft | $2,650 – $4,800 | −12% |
| Concrete slab | 400 sq ft | $2,150 – $4,600 | −12% |
| Asphalt driveway | 600 sq ft | $2,750 – $6,600 | −10% |
| Gravel driveway | 1,000 sq ft | $2,200 – $8,950 | −12% |
Which Oklahoma city is cheapest for stamped concrete?
2 of the 2 metros sit above the statewide midpoint of $4,900, and the top-to-bottom gap is 1%. Each row prices the default size with that metro's own BLS wages and BEA price levels, so the gap between rows is real local variation rather than a flat markup.
| Metro | Range (400 sq ft) | Midpoint | vs. state |
|---|---|---|---|
| Tulsa, OK | $2,900 – $7,050 | $5,000 | +2% |
| Oklahoma City, OK | $2,900 – $7,000 | $4,950 | +1% |
Oklahoma versus the states around it
Oklahoma ranks 48 of 51 (the 50 states plus DC) for stamped concrete, where 1 is the most expensive. The costliest is Hawaii at $7,800 and the cheapest Arkansas at $4,850, both for 400 sq ft at the midpoint. Oklahoma sits at $4,900. The five states closest by workforce center are listed below.
| State | Distance | Range | Midpoint | vs. here |
|---|---|---|---|---|
| Kansas | 160 miles away | $3,050 – $7,400 | $5,200 | +6% |
| Arkansas | 220 miles away | $2,850 – $6,900 | $4,850 | −1% |
| Missouri | 320 miles away | $3,350 – $8,200 | $5,750 | +18% |
| Texas | 330 miles away | $3,000 – $7,250 | $5,100 | +4% |
| Nebraska | 380 miles away | $3,050 – $7,400 | $5,200 | +6% |
Add-ons priced for Oklahoma
Add-ons start from national price ranges and are scaled by 0.87 for Oklahoma, which is the average of the area's wage index (0.81) and goods price index (0.94). The estimator above can add them to your total.
| Add-on | Local range |
|---|---|
| Add a vapor barrier | $170 – $350 |
Why two Oklahoma quotes can differ
Pattern and color
Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.
Specialist labor
Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.
Sealing and vapor barrier
Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).
Not included
These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.
Get 3 local quotes
Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,100 to $5,700 for Oklahoma is attached.
A detailed PDF report of this estimate, $9
Multi-page report for Oklahoma: low, typical and high cost, a line-item breakdown of materials and labor by trade, permit notes, the best months to schedule, a quote comparison sheet, red flags, questions for contractors, checklists and every source. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.
Stamped concrete in Oklahoma: your questions
+How much does it cost to pour stamped concrete in Oklahoma?
$2,850 to $6,950 for 400 sq ft, using statewide wages and prices. Metro areas inside Oklahoma can sit above or below that.
+Which city in Oklahoma is cheapest for stamped concrete?
Oklahoma City at about $4,950 (midpoint, 400 sq ft). The priciest is Tulsa at $5,000.
+Is stamped concrete cheaper in Oklahoma than the US average?
It is 12% cheaper: $4,900 against $5,600 for 400 sq ft at the midpoint.
+What share of the price is labor in Oklahoma?
About 45% ($2,200). Materials are 52%. Statewide labor for this job is weighted 0.81x the national wage level.
+What do cement masons and concrete finishers earn in Oklahoma?
The BLS statewide median is $22.00 an hour, against $27.41 for the US. The 25th to 75th percentile range is $18.98 to $23.58.
+Where does Oklahoma rank for stamped concrete costs?
48th most expensive of 51 (the 50 states plus DC) at the midpoint, $4,900 for 400 sq ft. Rank 1 is the costliest.
+What do basic and premium stamped concrete work cost in Oklahoma?
For 400 sq ft, basic work runs $2,850 to $4,500 and premium work $5,300 to $6,950. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.
+Does the season matter for stamped concrete in Oklahoma?
Yes where winters or summers are hard. Of the Oklahoma metros we cover, Tulsa has the most comfortable months (6 of 12) based on NOAA 1991-2020 normals. Our prices do not change by month, so ask contractors whether they charge more or less in busy and slow seasons.
+What does "add a vapor barrier" add in Oklahoma?
$170 to $350 for 400 sq ft, from a national range scaled by the statewide wage and goods indexes.
Stamped concrete by city in Oklahoma
Where these numbers come from
Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.
- HomeGuide: How Much Does Stamped Concrete Cost? (2026) (accessed November 4, 2026)
- SimplyWise: Concrete Estimate Template: Free PDF + Excel (2026) (accessed November 4, 2026)
- BLS Occupational Employment and Wage Statistics, May 2025
- BEA Regional Price Parities, 2024
- NOAA NCEI U.S. Climate Normals, 1991-2020
Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.