Skip to content
CostLocal

Stamped concrete cost in Greenville, NC

Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$2,850 – $6,850
Per sq ft
$7 – $16.50
before permit
Versus US midpoint
−13%
US $5,600
Rank of 300 metros
#283
1 = most expensive

Greenville homeowners pay roughly $2,850 to $6,850 to pour stamped concrete at 400 sq ft, or $7 to $16.50 per sq ft (permit not included). Against the US midpoint, Greenville is 13% lower. Cement masons and concrete finishers earn a median of $18.94 an hour in the Greenville area, 31% below the US median of $27.41.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in Greenville, NC, standard level

$4,050 to $5,650

About $9.80 to $13.50 per sq ft before permits. Labor is about 43% of the bill.

Cost breakdown
PartLowHigh
Materials$2,250$2,950
Labor$1,650$2,450
Permits and fees$120$230
Total$4,050$5,650
Save and get a PDF report

Cost breakdown for 400 sq ft in Greenville, NC

Part of the jobLowMidpointHighShare
Materials$1,750$2,600$3,50054%
Labor$1,050$2,050$3,05043%
Permits and fees$45$180$3104%
Total$2,850$4,850$6,850100%

Where the Greenville price comes from

We price the labor side from BLS wage data for 3 trades: cement masons and concrete finishers at 60%, construction laborers at 30%, operating engineers and other construction equipment operators at 10%. Weighted together, Greenville wages are 0.76 times the national level. Labor makes up about 43% of the midpoint estimate (48% at national prices).

On the materials line, the BEA goods price index for the Greenville metro is 96.6 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,600, compared with $2,700 at national prices. Permit and inspection fees are scaled by the broader index (88.4) and land at $45 to $310.

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Greenville is 0.76 times the national level.

For cement masons and concrete finishers (47-2051, weighted 60%) the local median is $18.94 an hour, which is 31% below the national $27.41. The middle half of them earn between $17.14 and $22.47 an hour. BLS counts 50 of them working in the area, 6.2 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $20.40 an hour, 10% below the US median of $22.66. The middle half of them earn between $17.36 and $23.08 an hour. About 450 work in the metro. That is 55.7 per 10,000 jobs, compared with 70.5 nationally, so expect fewer local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $23.05 an hour, which is 20% below the national $28.78. The middle half of them earn between $20.96 and $27.03 an hour. BLS counts 210 of them working in the area, 26.0 for every 10,000 jobs (US: 30.7), so the local bench is thinner than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($22.47 an hour) instead of the median, the labor line grows by about $210. At the 25th percentile ($17.14) it shrinks by about $110. The total moves by 4.3% or 2.2%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 80,770 jobs in the Greenville area. That makes it the 236th largest of the 300 metros we cover, with 0.05% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$17.14$18.94$22.47$27.410.69metro
Construction laborers (47-2061)30%$17.36$20.40$23.08$22.660.90metro
Operating engineers and other construction equipment operators (47-2073)10%$20.96$23.05$27.03$28.780.80metro
Blended100%0.76

Specs and site conditions that change a Greenville bid

  • Specialist labor

    Stamping has to be done before the concrete sets, so crews arrive in larger teams and charge for it.

  • Sealing and vapor barrier

    Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

Optional extras in Greenville

Extras are quoted nationally and then scaled to Greenville by the average of the local wage index (0.76) and goods index (0.97), a factor of 0.87. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add a vapor barrier$170 – $350

When to schedule stamped concrete in Greenville

We use NOAA's 1991-2020 climate normals for Greenville (5 miles from the city center). These are 30-year monthly averages, not forecasts.

March through June and August through November are the stretches where pouring concrete runs into the fewest weather problems in Greenville (8 of 12 months). January, February and December have an average overnight low of 40°F or below; July has an average daytime high of 90°F or more.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Heat matters for concrete as well. With average highs of 90°F or more in July, crews often start early, wet the base and plan for faster set times.

Greenville gets about 53 inches of precipitation in a normal year, including roughly 3 inches of snow. The wettest months are July, August and September (7.3 inches in September). Inside the workable window, October and November are the driest, at 3.6 and 3.4 inches. The station averages about 53 days a year at 90°F or above.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Greenville (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan53333.9Cold
Feb57353.4Cold
Mar64414.2Workable
Apr74503.8Workable
May81594.0Workable
Jun87674.4Workable
Jul90715.9Hot
Aug88706.0Workable
Sep83647.3Workable
Oct74523.6Workable
Nov64413.4Workable
Dec56353.5Cold

How Greenville compares

Of the five closest metros, 1 is cheaper than Greenville. Fayetteville is the lowest at about $4,850 (midpoint, 400 sq ft), 100 miles away.

Comparison with nearby areas
AreaRangeMidpointvs. here
Greenville, NCthis page$2,850 – $6,850$4,850
Raleigh, NC60 miles$3,000 – $7,300$5,150+7%
Fayetteville, NC100 miles$2,850 – $6,800$4,850level
Wilmington, NC100 miles$2,950 – $7,150$5,050+4%
Durham, NC100 miles$3,000 – $7,200$5,100+5%
Virginia Beach, VA100 miles$3,000 – $7,250$5,100+5%
North Carolina (statewide)$3,000 – $7,250$5,100+6%
United States$3,250 – $7,950$5,600+15%

Across 300 US metros, Greenville comes in at #283 from the top. The priciest is Kahului, HI at $8,150; the cheapest is McAllen, TX at $4,550 (midpoints, 400 sq ft). Statewide, Greenville is 5% below the North Carolina figure.

Other North Carolina metros

North Carolina metros compared with Greenville
MetroSizeRangeMidpointvs. here
Charlotte, NC1,358,370 jobs$3,000 – $7,350$5,200+7%
Raleigh, NC743,120 jobs$3,000 – $7,300$5,150+7%
Greensboro, NC365,410 jobs$2,950 – $7,100$5,000+3%
Durham, NC344,020 jobs$3,000 – $7,200$5,100+5%
Winston, NC271,980 jobs$2,950 – $7,050$5,000+3%
Wilmington, NC191,280 jobs$2,950 – $7,150$5,050+4%

Cities with a workforce like Greenville's

Big cities and small ones price differently, so here is Greenville against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Odessa, TX80,910 jobs$2,900 – $7,050$5,000+3%
Jefferson City, MO80,220 jobs$3,300 – $8,100$5,700+18%
Johnson City, TN81,690 jobs$2,950 – $7,150$5,050+4%
Las Cruces, NM80,000 jobs$2,900 – $7,000$4,950+2%

Greenville: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Greenville wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.

Basic

$2,850 to $4,450

Basic pattern, one integral color

Standard

$4,050 to $5,650

Two-tone color release and a border

Premium

$5,250 to $6,850

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$1,450 – $2,300$2,100 – $2,950$2,750 – $3,600
20x20 patio (400 sq ft)$2,850 – $4,450$4,050 – $5,650$5,250 – $6,850
2-car driveway (600 sq ft)$4,250 – $6,600$6,000 – $8,350$7,750 – $10,100

Planning more than one job in Greenville?

Because every project leans on different trades, Greenville's wage level does not move all prices equally. Against the US midpoint, asphalt driveway runs −8% and concrete driveway −17%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,100 – $3,400−14%
Concrete driveway600 sq ft$3,100 – $7,600−17%
Paver patio300 sq ft$2,700 – $4,850−11%
Concrete slab400 sq ft$2,150 – $4,600−12%
Asphalt driveway600 sq ft$2,850 – $6,800−8%
Gravel driveway1,000 sq ft$2,250 – $9,250−9%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $4,050 to $5,650 for Greenville, NC is attached.

Detailed stamped concrete report for Greenville, NC, $9

The report lays out the stamped concrete numbers for Greenville, NC line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in Greenville: your questions

+How much does it cost to pour stamped concrete in Greenville?

For 400 sq ft, expect $2,850 to $6,850 in the Greenville area. A standard-spec job lands at $4,050 to $5,650. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for stamped concrete in Greenville?

About $7 to $16.50 per sq ft for materials and labor, plus $45 to $310 for the permit if one is needed. The US range is $8 to $19.

+Is stamped concrete cheaper in Greenville or Raleigh?

Raleigh is 60 miles away. The midpoint for 400 sq ft there is $5,150, which is 7% more than Greenville ($4,850). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Greenville?

About 43% at the midpoint, or $2,050 out of $4,850. Materials are 54% and permits 4%. Nationally, labor is 48%.

+What would 20x20 patio (400 sq ft) cost in Greenville?

$2,850 to $6,850. Pick a different size in the estimator above to get your own number.

+Does stamped concrete need a permit in Greenville?

Often, but rules are set by your city or county building office, so call before you hire. Budget $45 to $310 for fees in the Greenville area (our national range of $50 to $350 scaled by the local price level).

+Is Greenville expensive for stamped concrete compared with the rest of North Carolina?

Greenville is 5% below the North Carolina statewide estimate ($5,100 at the midpoint). We cover 11 metros in North Carolina; see the state page to compare them.

+What do cement masons and concrete finishers earn in Greenville?

The BLS median is $18.94 an hour in the Greenville area, compared with $27.41 nationally. The 25th to 75th percentile range is $17.14 to $22.47.

+What do basic and premium stamped concrete work cost in Greenville?

For 400 sq ft, basic work runs $2,850 to $4,450 and premium work $5,250 to $6,850. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+When is the best time to pour stamped concrete in Greenville?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are March through June and August through November. October and November are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a vapor barrier" add in Greenville?

$170 to $350 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Stamped concrete near Greenville

Stamped concrete: all pricesStamped concrete in North CarolinaAll projects in GreenvilleNorth Carolina cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.