Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (400 sq ft)
$4,000 – $10,100
Per sq ft
$9.95 – $24
before permit
Versus US midpoint
+26%
US $5,600
Rank of 300 metros
#4
1 = most expensive

Anchorage homeowners pay roughly $4,000 to $10,100 to pour stamped concrete at 400 sq ft, or $9.95 to $24 per sq ft (permit not included). Against the US midpoint, Anchorage is 26% higher. Cement masons and concrete finishers earn a median of $44.35 an hour in the Anchorage area, 62% above the US median of $27.41.

Estimate your stamped concrete cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Two-tone color release and a border

Add-ons

Estimated cost for 400 sq ft in Anchorage, AK, standard level

$5,850 to $8,250

About $14 to $20 per sq ft before permits. Labor is about 56% of the bill.

Cost breakdown
PartLowHigh
Materials$2,500$3,300
Labor$3,150$4,700
Permits and fees$150$270
Total$5,850$8,250
Save and get a PDF report

Cost breakdown for 400 sq ft in Anchorage, AK

Part of the jobLowMidpointHighShare
Materials$1,950$2,900$3,85041%
Labor$2,050$3,950$5,80056%
Permits and fees$55$210$3703%
Total$4,000$7,050$10,100100%

Why Anchorage prices look the way they do

Labor is 56% of the midpoint bill here, against 48% nationally. The mix of trades behind this job is cement masons and concrete finishers (60%), construction laborers (30%), operating engineers and other construction equipment operators (10%). We weight each trade's local median wage by that share and compare it with the national median. In Anchorage the blended ratio comes out at 1.46.

On the materials line, the BEA goods price index for the Anchorage metro is 107.3 (US = 100). The midpoint materials bill for 400 sq ft comes to $2,900, compared with $2,700 at national prices. Permit and inspection fees are scaled by the broader index (105.4) and land at $55 to $370.

Anchorage: what basic, standard and premium work costs

Three bands are cut from the same cited range and localized for Anchorage wages and prices. They overlap on purpose: a good standard job and a modest premium job can cost the same. The grid below prices the same bands at 3 common sizes.

Basic

$4,000 to $6,450

Basic pattern, one integral color

Standard

$5,850 to $8,250

Two-tone color release and a border

Premium

$7,650 to $10,100

Multi-color, hand-detailed, sealed to a high finish

Cost by size and quality level
SizeBasicStandardPremium
10x20 patio (200 sq ft)$2,050 – $3,300$3,000 – $4,250$3,950 – $5,200
20x20 patio (400 sq ft)$4,000 – $6,450$5,850 – $8,250$7,650 – $10,100
2-car driveway (600 sq ft)$6,000 – $9,550$8,700 – $12,200$11,300 – $14,900

Is Anchorage cheap or dear? The local comparison

Contractors rarely work more than an hour or two from home, so the neighboring metros set a rough ceiling and floor for your quotes. Midpoints for 400 sq ft range from $6,400 to $7,050 across Anchorage and its five closest metros.

Comparison with nearby areas
AreaRangeMidpointvs. here
Anchorage, AKthis page$4,000 – $10,100$7,050
Bellingham, WA1410 miles$3,800 – $9,500$6,650−5%
Bremerton, WA1450 miles$3,750 – $9,350$6,550−7%
Seattle, WA1480 miles$3,850 – $9,700$6,800−4%
Olympia, WA1485 miles$3,750 – $9,400$6,600−7%
Spokane, WA1570 miles$3,700 – $9,100$6,400−9%
Alaska (statewide)$4,050 – $10,100$7,050level
United States$3,250 – $7,950$5,600−20%

Across 300 US metros, Anchorage comes in at #4 from the top. The priciest is Kahului, HI at $8,150; the cheapest is McAllen, TX at $4,550 (midpoints, 400 sq ft). Statewide, Anchorage is 0% below the Alaska figure.

Anchorage is the only Alaska metro we cover, so the statewide page is the only in-state comparison. It uses statewide wages, which include rural areas.

Cities with a workforce like Anchorage's

Big cities and small ones price differently, so here is Anchorage against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Sioux Falls, SD178,590 jobs$3,050 – $7,350$5,200−26%
Reading, PA174,670 jobs$3,300 – $8,150$5,750−19%
Lafayette, LA179,570 jobs$3,000 – $7,250$5,100−27%
Green Bay, WI174,550 jobs$3,350 – $8,300$5,850−17%

Local wages behind the labor line

Wages are the part of this estimate that changes most from town to town. 3 trades carry the job here, and each is compared with its US median. The weighted result for Anchorage is 1.46 times the national level.

For cement masons and concrete finishers (47-2051, weighted 60%) the local median is $44.35 an hour, which is 62% above the national $27.41. The middle half of them earn between $44.33 and $53.55 an hour. BLS counts 160 of them working in the area, 9.0 for every 10,000 jobs (US: 13.3), so the local bench is thinner than average.

Construction laborers (47-2061), 30% of the weighting: a median of $27.00 an hour, 19% above the US median of $22.66. The middle half of them earn between $22.90 and $34.85 an hour. About 1,860 work in the metro. That is 105.1 per 10,000 jobs, compared with 70.5 nationally, which suggests plenty of local crews to bid.

For operating engineers and other construction equipment operators (47-2073, weighted 10%) the local median is $36.79 an hour, which is 28% above the national $28.78. The middle half of them earn between $32.05 and $46.54 an hour. BLS counts 980 of them working in the area, 55.4 for every 10,000 jobs (US: 30.7), so the local bench is deeper than average.

Quotes come from real crews, not medians. If the cement masons and concrete finishers on your job are paid at the 75th percentile ($53.55 an hour) instead of the median, the labor line grows by about $540. At the 25th percentile ($44.33) it shrinks by about $0. The total moves by 7.7% or 0.0%, so wages alone rarely explain a quote that is far outside our range.

For context on the local economy, BLS counts 177,050 jobs in the Anchorage area. That makes it the 131st largest of the 300 metros we cover, with 0.11% of US employment.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Cement masons and concrete finishers (47-2051)60%$44.33$44.35$53.55$27.411.62metro
Construction laborers (47-2061)30%$22.90$27.00$34.85$22.661.19metro
Operating engineers and other construction equipment operators (47-2073)10%$32.05$36.79$46.54$28.781.28metro
Blended100%1.46

What nearby projects cost in Anchorage

Because every project leans on different trades, Anchorage's wage level does not move all prices equally. Against the US midpoint, concrete driveway runs +31% and paver patio +11%.

Related projects with local prices
ProjectSizeRangevs. US
Concrete patio300 sq ft$1,500 – $5,050+25%
Concrete driveway600 sq ft$4,650 – $12,100+31%
Paver patio300 sq ft$3,350 – $6,050+11%
Concrete slab400 sq ft$3,050 – $6,250+21%
Asphalt driveway600 sq ft$3,600 – $8,900+19%
Gravel driveway1,000 sq ft$2,900 – $11,800+15%

Extras that change the Anchorage total

Extras are quoted nationally and then scaled to Anchorage by the average of the local wage index (1.46) and goods index (1.07), a factor of 1.26. Tick any of them in the estimator above to add them to your total. Treat these as planning figures: an add-on touches different trades than the main job, so the scaling is an approximation.

Add-on prices
Add-onLocal range
Add a vapor barrier$250 – $510

When to schedule stamped concrete in Anchorage

We use NOAA's 1991-2020 climate normals for Eagle Rvr Nature Ctr (5 miles from the city center). These are 30-year monthly averages, not forecasts.

June through August is the stretch where pouring concrete runs into the fewest weather problems in Anchorage (3 of 12 months). January, February, March, April, May, September, October, November and December have an average overnight low of 40°F or below.

The 40°F line is a deliberately cautious stand-in. The American Concrete Institute's cold-weather guide (ACI 306R-16) defines cold-weather concreting around an average daily air temperature below 40°F, which is colder than our test of an average overnight low at or below 40°F, so we flag a few extra shoulder months. In cold weather crews may need heated enclosures, insulating blankets or accelerated mixes, and those measures can raise a quote.

Anchorage gets about 23 inches of precipitation in a normal year. The wettest months are August, September and October (3.6 inches in September). Inside the workable window, June and July are the driest, at 1.3 and 1.7 inches.

Does the season change the price? Probably, but we do not have a sourced seasonal price curve, so the estimator shows a year-round figure and does not adjust by month. When you collect quotes, ask whether scheduling in a slower month gets a better rate.

Monthly normals, Eagle Rvr Nature Ctr (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan2162.3Cold
Feb28121.6Cold
Mar35151.6Cold
Apr47270.8Cold
May58360.9Cold
Jun65441.3Workable
Jul67481.7Workable
Aug65452.6Workable
Sep56373.6Cold
Oct42262.5Cold
Nov26131.7Cold
Dec2392.0Cold

Specs and site conditions that change a Anchorage bid

  • Sealing and vapor barrier

    Sealer is usually quoted separately; vapor barrier material is $0.20-$1.50 per sq ft depending on thickness (HomeGuide).

  • Not included

    These prices don't include site prep that depends on the project: demolition, grading, or a thicker base.

  • Pattern and color

    Basic to average coloring runs $8-$19 per sq ft. A 2-car stamped driveway runs $12-$18 per sq ft (HomeGuide); Estimators.us puts decorative slabs at $15-$30.

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $5,850 to $8,250 for Anchorage, AK is attached.

Detailed stamped concrete report for Anchorage, AK, $9

The report lays out the stamped concrete numbers for Anchorage, AK line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Stamped concrete in Anchorage: your questions

+How much does it cost to pour stamped concrete in Anchorage?

For 400 sq ft, expect $4,000 to $10,100 in the Anchorage area. A standard-spec job lands at $5,850 to $8,250. Small jobs usually cost more per sq ft and large ones less.

+What is the price per sq ft for stamped concrete in Anchorage?

About $9.95 to $24 per sq ft for materials and labor, plus $55 to $370 for the permit if one is needed. The US range is $8 to $19.

+Is stamped concrete cheaper in Anchorage or Bellingham?

Bellingham is 1410 miles away. The midpoint for 400 sq ft there is $6,650, which is 5% less than Anchorage ($7,050). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Anchorage?

About 56% at the midpoint, or $3,950 out of $7,050. Materials are 41% and permits 3%. Nationally, labor is 48%.

+What would 20x20 patio (400 sq ft) cost in Anchorage?

$4,000 to $10,100. Pick a different size in the estimator above to get your own number.

+Does stamped concrete need a permit in Anchorage?

Often, but rules are set by your city or county building office, so call before you hire. Budget $55 to $370 for fees in the Anchorage area (our national range of $50 to $350 scaled by the local price level).

+Is Anchorage expensive for stamped concrete compared with the rest of Alaska?

Anchorage is 0% below the Alaska statewide estimate ($7,050 at the midpoint).

+What do cement masons and concrete finishers earn in Anchorage?

The BLS median is $44.35 an hour in the Anchorage area, compared with $27.41 nationally. The 25th to 75th percentile range is $44.33 to $53.55.

+What do basic and premium stamped concrete work cost in Anchorage?

For 400 sq ft, basic work runs $4,000 to $6,450 and premium work $7,650 to $10,100. Basic means: basic pattern, one integral color. Premium means: multi-color, hand-detailed, sealed to a high finish.

+When is the best time to pour stamped concrete in Anchorage?

Based on NOAA 1991-2020 normals, the comfortable months for this kind of work are June through August. June and July are typically the driest of those months. Local contractors' schedules matter as much as the weather, so book early for the busy months.

+What does "add a vapor barrier" add in Anchorage?

$250 to $510 for 400 sq ft, from a national range scaled by the local wage and goods indexes.

Stamped concrete near Anchorage

Stamped concrete: all pricesStamped concrete in AlaskaAll projects in AnchorageAlaska cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = SimplyWise's 200 sq ft stamped-patio line ($900-$1,800), divided by 200 sq ft.