Local estimate from BLS wage data and BEA price levels. Reviewed Nov 4, 2026.

Typical range (200 sq ft of wall face)
$8,000 – $14,900
Per sq ft of wall face
$39.50 – $72
before permit
Versus US midpoint
+11%
US $10,300
Rank of 300 metros
#43
1 = most expensive

Local price for a retaining wall in the Salinas area: $8,000 to $14,900 for 200 sq ft of wall face. The low end is a basic job on easy ground; the high end is a premium spec with harder access. The midpoint runs 11% higher than the US figure. Brickmasons and blockmasons earn a median of $31.46 an hour in the Salinas area, 5% above the US median of $29.87.

Estimate your retaining wall cost

Pick a size, a quality level and where you live. Prices update as you type.

Quality level

Standard segmental block wall with drainage

Estimated cost for 200 sq ft of wall face in Salinas, CA, standard level

$10,100 to $12,800

About $49.50 to $62 per sq ft of wall face before permits. Labor is about 49% of the bill.

Cost breakdown
PartLowHigh
Materials$4,500$6,650
Labor$5,350$5,800
Permits and fees$190$360
Total$10,100$12,800
Save and get a PDF report

Cost breakdown for 200 sq ft of wall face in Salinas, CA

Part of the jobLowMidpointHighShare
Materials$2,950$5,550$8,20049%
Labor$5,000$5,600$6,20049%
Permits and fees$55$270$4902%
Total$8,000$11,400$14,900100%

What is behind the Salinas number

Labor is 49% of the midpoint bill here, against 46% nationally. The mix of trades behind this job is brickmasons and blockmasons (50%), construction laborers (30%), operating engineers and other construction equipment operators (20%). We weight each trade's local median wage by that share and compare it with the national median. In Salinas the blended ratio comes out at 1.19.

Materials are scaled with BEA's regional price parity for goods. Salinas is at 105.2 against 100 for the US, so a materials line of $5,300 nationally becomes $5,550 here (midpoint, 200 sq ft of wall face). Permits follow the all-items index of 109.0: $55 to $490.

What nearby projects cost in Salinas

Jobs that often go together with retaining wall are priced below at their usual sizes, using the same Salinas wage and price inputs. Compared with national midpoints, French drain comes out highest (+22%) and sprinkler system lowest (+13%); the gap comes from the trades each job uses.

Related projects with local prices
ProjectSizeRangevs. US
French drain60 linear ft$730 – $2,550+22%
Paver patio300 sq ft$3,450 – $6,250+15%
Concrete driveway600 sq ft$4,250 – $10,900+18%
Sod installation1,500 sq ft$1,700 – $3,700+13%
Sprinkler system4,000 sq ft of lawn$4,500 – $11,300+13%
Inground pool450 sq ft$41,500 – $129,500+15%

Cost by quality level and size in Salinas

The cited range is split into basic, standard and premium bands, then scaled to Salinas. Bands overlap, because plenty of standard jobs cost as much as a light premium one. Sizes run from short garden wall (4x25 ft), 100 sq ft of wall face to 40 ft x 6 ft (240 sq ft of wall face).

Basic

$8,000 to $10,700

Short block wall, easy access

Standard

$10,100 to $12,800

Standard segmental block wall with drainage

Premium

$12,100 to $14,900

Tall or stone wall, engineered, hard access

Cost by size and quality level
SizeBasicStandardPremium
short garden wall (4x25 ft), 100 sq ft of wall face$4,000 – $5,500$5,100 – $6,600$6,200 – $7,700
20 ft x 4 ft (80 sq ft of wall face)$3,250 – $4,450$4,150 – $5,350$5,050 – $6,250
40 ft x 4 ft (160 sq ft of wall face)$6,400 – $8,650$8,100 – $10,300$9,750 – $12,000
40 ft x 6 ft (240 sq ft of wall face)$9,550 – $12,800$12,000 – $15,300$14,500 – $17,700

The best months for retaining wall in Salinas

Climate numbers on this page come from NOAA's 1991-2020 U.S. Climate Normals at the nearest suitable station, Salinas Municipal Ap (5 miles from the city center). They are 30-year averages, so any one year can run hotter, colder or wetter.

Weather is not a serious constraint for digging, grading and setting material in the ground in Salinas: no month in the averages is cold enough (an average overnight low at or below freezing (32°F)) or hot enough (an average daytime high of 90°F or more) to rule it out, so the workable window is all year.

Salinas gets about 13 inches of precipitation in a normal year. The wettest months are January, February and December (2.6 inches in January). The station averages about 6 days a year at 90°F or above.

We do not adjust the estimate by month, because we have no reliable published data on seasonal pricing. It is still worth asking contractors whether an off-peak start date changes their bid.

Monthly normals, Salinas Municipal Ap (NOAA, 1991-2020)
MonthAvg high °FAvg low °FPrecip (in)For this job
Jan62422.6Workable
Feb63432.4Workable
Mar66452.1Workable
Apr67460.9Workable
May68500.4Workable
Jun70530.1Workable
Jul71550.0Workable
Aug72560.0Workable
Sep74540.1Workable
Oct74500.6Workable
Nov68441.3Workable
Dec62412.1Workable

Specs and site conditions that change a Salinas bid

  • Height

    Walls over 4 feet need engineering, deeper excavation and more skilled labor; many cities require permits over 3-4 feet (HomeGuide).

  • Material

    Block, poured concrete and natural stone are priced differently; concrete and stone walls run higher than the segmental block default.

  • Drainage

    Every wall needs drainage behind it. A French drain adds $10-$85+ per linear foot.

Who does the work: Salinas trade wages

The labor line is built from BLS wage data, one trade at a time. This job draws on 3 trades. We compare each trade's local median with the US median, weight the ratios by how much of the job each trade does, and apply the blend to the national labor cost. For Salinas the blend is 1.19.

For brickmasons and blockmasons (47-2021, weighted 50%) the local median is $31.46 an hour, which is 5% above the national $29.87. The middle half of them earn between $24.09 and $38.55 an hour. BLS counts 40 of them working in the area, 2.1 for every 10,000 jobs (US: 3.4), so the local bench is thinner than average.

For construction laborers (47-2061, weighted 30%) the local median is $29.65 an hour, which is 31% above the national $22.66. The middle half of them earn between $24.31 and $36.63 an hour. BLS counts 950 of them working in the area, 51.0 for every 10,000 jobs (US: 70.5), so the local bench is thinner than average.

Operating engineers and other construction equipment operators (47-2073), 20% of the weighting: a median of $38.62 an hour, 34% above the US median of $28.78. The middle half of them earn between $31.66 and $57.61 an hour. About 340 work in the metro. That is 18.2 per 10,000 jobs, compared with 30.7 nationally, so expect fewer local crews to bid.

A quick sensitivity check: moving the lead trade (brickmasons and blockmasons) from the median to the 75th percentile wage adds about $560 to the midpoint estimate; the 25th percentile takes off about $580. That is a swing of roughly 5.1% to 4.9% of the total, which is useful for judging whether a bid reflects wages or something else, such as scope or margin.

Salinas has 186,430 jobs in total (BLS, May 2025), ranking 123rd by size among the 300 metros on this site.

Median hourly wages behind the labor line (BLS OEWS, May 2025)
TradeWeight25th pctMedian75th pctUS medianRatioLevel used
Brickmasons and blockmasons (47-2021)50%$24.09$31.46$38.55$29.871.05metro
Construction laborers (47-2061)30%$24.31$29.65$36.63$22.661.31metro
Operating engineers and other construction equipment operators (47-2073)20%$31.66$38.62$57.61$28.781.34metro
Blended100%1.19

Is Salinas cheap or dear? The local comparison

Same job, same size (200 sq ft of wall face), priced for the nearest metros. San Jose is the priciest of the group at $12,700. Merced is the cheapest at $11,200.

Comparison with nearby areas
AreaRangeMidpointvs. here
Salinas, CAthis page$8,000 – $14,900$11,400
San Jose, CA45 miles$9,150 – $16,300$12,700+11%
Santa Cruz, CA65 miles$7,950 – $14,800$11,400level
Merced, CA75 miles$7,850 – $14,600$11,200−2%
San Luis Obispo, CA75 miles$8,050 – $15,000$11,500+1%
Modesto, CA95 miles$8,200 – $15,100$11,700+2%
California (statewide)$8,200 – $15,200$11,700+2%
United States$7,050 – $13,500$10,300−10%

Out of the 300 metros we cover, Salinas ranks #43 for the cost of this job (#1 is the most expensive). Statewide, Salinas is 2% below the California figure.

Elsewhere in California

California metros compared with Salinas
MetroSizeRangeMidpointvs. here
Los Angeles, CA6,271,560 jobs$8,050 – $15,000$11,600+1%
San Francisco, CA2,373,920 jobs$9,400 – $16,800$13,100+15%
Riverside, CA1,716,760 jobs$7,750 – $14,400$11,100−3%
San Diego, CA1,538,060 jobs$7,900 – $14,900$11,400level
San Jose, CA1,134,970 jobs$9,150 – $16,300$12,700+11%
Sacramento, CA1,080,590 jobs$8,400 – $15,400$11,900+4%

Metros of a similar size

Big cities and small ones price differently, so here is Salinas against the 4 metros with the closest total employment.

Metros closest to this one by total employment
MetroSizeRangeMidpointvs. here
Salem, OR188,620 jobs$8,600 – $15,600$12,100+6%
Tallahassee, FL186,160 jobs$6,200 – $12,200$9,200−19%
Pensacola, FL190,480 jobs$6,250 – $12,300$9,300−19%
York, PA183,590 jobs$7,100 – $13,500$10,300−10%

Get 3 local quotes

Tell us about the job and we will try to connect you with up to three local contractors for written quotes. It is free and you are under no obligation to hire. Your estimate of $10,100 to $12,800 for Salinas, CA is attached.

Detailed retaining wall report for Salinas, CA, $9

The report lays out the retaining wall numbers for Salinas, CA line by line, with the local wage and price inputs, permit and timing notes, a quote comparison sheet and the full method. Save your estimate above, preview page 1 free, and unlock the full report for $9 one-time, or get every report with CostLocal Pro.

Retaining wall in Salinas: your questions

+How much does it cost to build a retaining wall in Salinas?

For 200 sq ft of wall face, expect $8,000 to $14,900 in the Salinas area. A standard-spec job lands at $10,100 to $12,800. Small jobs usually cost more per sq ft of wall face and large ones less.

+What is the price per sq ft of wall face for retaining wall in Salinas?

About $39.50 to $72 per sq ft of wall face for materials and labor, plus $55 to $490 for the permit if one is needed. The US range is $35 to $65.

+Is retaining wall cheaper in Salinas or San Jose?

San Jose is 45 miles away. The midpoint for 200 sq ft of wall face there is $12,700, which is 11% more than Salinas ($11,400). Wage and materials indexes both feed that gap.

+How much of the bill is labor in Salinas?

About 49% at the midpoint, or $5,600 out of $11,400. Materials are 49% and permits 2%. Nationally, labor is 46%.

+What would 40 ft x 4 ft (160 sq ft of wall face) cost in Salinas?

$6,400 to $12,000. Pick a different size in the estimator above to get your own number.

+Does retaining wall need a permit in Salinas?

Often, but rules are set by your city or county building office, so call before you hire. Budget $55 to $490 for fees in the Salinas area (our national range of $50 to $450 scaled by the local price level).

+Is Salinas expensive for retaining wall compared with the rest of California?

Salinas is 2% below the California statewide estimate ($11,700 at the midpoint). We cover 23 metros in California; see the state page to compare them.

+What do brickmasons and blockmasons earn in Salinas?

The BLS median is $31.46 an hour in the Salinas area, compared with $29.87 nationally. The 25th to 75th percentile range is $24.09 to $38.55.

+What do basic and premium retaining wall work cost in Salinas?

For 200 sq ft of wall face, basic work runs $8,000 to $10,700 and premium work $12,100 to $14,900. Basic means: short block wall, easy access. Premium means: tall or stone wall, engineered, hard access.

+Is there a bad season to build a retaining wall in Salinas?

Not from a temperature point of view. NOAA's 1991-2020 normals show no month with a freezing-level overnight low or a 90°F-plus average high, so timing is mostly about contractor availability and rain.

Retaining wall near Salinas

Retaining wall: all pricesRetaining wall in CaliforniaAll projects in SalinasCalifornia cost hub

Where these numbers come from

Base prices are national ranges from the sources below. We scale labor by local BLS wages, materials by BEA goods prices and permits by the BEA all-items price level. Full method on the methodology page.

Note on derived figures: Materials = 40% of the low installed price and 60% of the high one, since HomeGuide says labor is 40-60% of the total project cost.